{"id":63434,"date":"2017-04-19T11:41:39","date_gmt":"2017-04-19T08:41:39","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=63434"},"modified":"2017-04-19T11:47:00","modified_gmt":"2017-04-19T08:47:00","slug":"burdur-gesi-al-abound-holding-satin-aldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/burdur-gesi-al-abound-holding-satin-aldi\/","title":{"rendered":"(Turkish) Burdur GES&#8217;i Al Abound Holding Sat\u0131n Ald\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/63434\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #0a0a0a;\"><strong>Tekno Ray Solar&#8217;\u0131n kurdu\u011fu ve 6,6 megavat kurulu g\u00fcce\u00a0sahip Burdur G\u00fcne\u015f Enerjisi Santra<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/04\/burdur-gesi-al-abound-holding-satin-aldi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-63437\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/04\/burdur-gesi-al-abound-holding-satin-aldi-300x190.jpg\" alt=\"burdur-gesi-al-abound-holding-satin-aldi\" width=\"300\" height=\"190\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/04\/burdur-gesi-al-abound-holding-satin-aldi-300x190.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/04\/burdur-gesi-al-abound-holding-satin-aldi-500x317.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/04\/burdur-gesi-al-abound-holding-satin-aldi-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/04\/burdur-gesi-al-abound-holding-satin-aldi.jpg 900w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>li (GES), M\u0131s\u0131r ve Suudi Arabistan ortakl\u0131 enerji \u015firketi Al Abound Holding taraf\u0131ndan sat\u0131n al\u0131nd\u0131.<\/strong><\/p>\n<p style=\"color: #0a0a0a;\"><span id=\"more-90642\"><\/span>Tekno Ray Solar\u2019\u0131n\u00a0a\u00e7\u0131klamas\u0131na g\u00f6re, Al Abound Holding taraf\u0131ndan, 2018&#8217;in sonuna kadar T\u00fcrkiye\u2019de 50 megavatl\u0131k yat\u0131r\u0131m yapmay\u0131 planland\u0131\u011f\u0131\u00a0ifade edildi.<\/p>\n<p style=\"color: #0a0a0a;\">Tekno \u015eirketler Grubu Mali \u0130\u015fler M\u00fcd\u00fcr\u00fc Berna Meri\u00e7, kurduklar\u0131\u00a0g\u00fcne\u015f enerjisi santrallerinin k\u00fcresel yat\u0131r\u0131mc\u0131n\u0131n ilgisini \u00e7ekti\u011fini s\u00f6yleyerek, \u201cAl Abound ile yapt\u0131\u011f\u0131m\u0131z anla\u015fma bunun g\u00fczel bir \u00f6rne\u011fidir. Yabanc\u0131 sermayenin \u00fclkemize kazand\u0131r\u0131lmas\u0131na katk\u0131 sa\u011flayacak projeleri hayata ge\u00e7irmeyi s\u00fcrd\u00fcrece\u011fiz\u201d dedi.<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Tekno Ray Solar&#8217;\u0131n kurdu\u011fu ve 6,6 megavat kurulu g\u00fcce\u00a0sahip Burdur G\u00fcne\u015f Enerjisi Santrali (GES), M\u0131s\u0131r ve Suudi Arabistan ortakl\u0131 enerji \u015firketi Al [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":63437,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[33825,33826,63,67,1009,2698,165,2326,31710,227,6014,13,2569,23133,22975,4269,10332],"views":1049,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/63434"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=63434"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/63434\/revisions"}],"predecessor-version":[{"id":63438,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/63434\/revisions\/63438"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/63437"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=63434"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=63434"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=63434"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}