{"id":62976,"date":"2017-04-04T13:19:03","date_gmt":"2017-04-04T10:19:03","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=62976"},"modified":"2017-04-04T13:20:08","modified_gmt":"2017-04-04T10:20:08","slug":"aksa-enerjinin-gana-santrali-araliksiz-uretimini-surduruyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aksa-enerjinin-gana-santrali-araliksiz-uretimini-surduruyor\/","title":{"rendered":"(Turkish) Aksa Enerji\u2019nin Gana Santrali Aral\u0131ks\u0131z \u00dcretimini S\u00fcrd\u00fcr\u00fcyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/62976\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #0a0a0a;\"><strong>Aksa Enerji\u2019nin G<img loading=\"lazy\" class=\"alignleft  wp-image-48944\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/acil-enerji-ihtiyacina-cozum-kiralik-jenerator.jpg\" alt=\"aksa-enerji\" width=\"300\" height=\"212\" \/>ana santrali&#8217;nin 102.5 MW&#8217;l\u0131k kurulu g\u00fc\u00e7te yer alan ilk b\u00f6l\u00fcm\u00fc aral\u0131ks\u0131z \u00fcretimini s\u00fcrd\u00fcr\u00fcyor.<\/strong><\/p>\n<p style=\"color: #0a0a0a;\"><span id=\"more-90283\"><\/span>KAP\u2019a yap\u0131lan a\u00e7\u0131klamada ise, \u201cGana santralimizin bakanl\u0131k kabul\u00fc i\u00e7in \u00e7al\u0131\u015fmalar\u0131m\u0131z devam ediyor olup santralimizin 192.5 MW kurulu g\u00fc\u00e7 ile ticari faaliyetlerine ba\u015flamas\u0131 beklenmektedir. Ge\u00e7ti\u011fimiz haftadan itibaren 102.5 MW kurulu g\u00fc\u00e7teki ilk b\u00f6l\u00fcm aral\u0131ks\u0131z \u00fcretime ba\u015flam\u0131\u015ft\u0131r\u201d\u00a0ifadeleri kullan\u0131ld\u0131.<\/p>\n<p style=\"color: #0a0a0a;\">Yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, ilgili\u00a0b\u00f6l\u00fcme ait\u00a0bakanl\u0131k kabul\u00fcn\u00fcn bu hafta sonuna kadar bitmesiyle birlikte; geriye kalan motorlar\u0131n ise k\u0131s\u0131m k\u0131s\u0131m\u00a0may\u0131s sonuna kadar devreye al\u0131nmas\u0131\u00a0\u00f6ng\u00f6r\u00fclmektedir.<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Aksa Enerji\u2019nin Gana santrali&#8217;nin 102.5 MW&#8217;l\u0131k kurulu g\u00fc\u00e7te yer alan ilk b\u00f6l\u00fcm\u00fc aral\u0131ks\u0131z \u00fcretimini s\u00fcrd\u00fcr\u00fcyor. KAP\u2019a yap\u0131lan a\u00e7\u0131klamada ise, \u201cGana santralimizin bakanl\u0131k [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":48944,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[1571,63,67,1009,2698,165,1975,33664,5436,33665],"views":707,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/62976"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=62976"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/62976\/revisions"}],"predecessor-version":[{"id":62977,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/62976\/revisions\/62977"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/48944"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=62976"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=62976"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=62976"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}