{"id":62936,"date":"2017-04-03T17:35:10","date_gmt":"2017-04-03T14:35:10","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=62936"},"modified":"2017-04-03T17:36:50","modified_gmt":"2017-04-03T14:36:50","slug":"ermenek-baraji-ve-hesten-ulke-ekonomisine-1-milyar-liralik-katki","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ermenek-baraji-ve-hesten-ulke-ekonomisine-1-milyar-liralik-katki\/","title":{"rendered":"(Turkish) Ermenek Baraj\u0131 ve HES&#8217;ten \u00dclke Ekonomisine 1 Milyar Liral\u0131k Katk\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/62936\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong><span style=\"color: #0a0a0a;\">Orman ve Su \u0130\u015fleri Bakanl\u0131\u011f\u0131 Devl<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/04\/ermenek-baraji-ve-hesten-ulke-ekonomisine-1-milyar-liralik-katki.jpg\"><img loading=\"lazy\" class=\"alignleft  wp-image-62937\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/04\/ermenek-baraji-ve-hesten-ulke-ekonomisine-1-milyar-liralik-katki-300x225.jpg\" alt=\"ermenek-baraji-ve-hesten-ulke-ekonomisine-1-milyar-liralik-katki\" width=\"300\" height=\"266\" \/><\/a>et Su \u0130\u015fleri (DS\u0130) Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc taraf\u0131ndan in\u015fa edilen Ermenek Baraj\u0131 ve HES\u2019 in i\u015fletmeye al\u0131nd\u0131\u011f\u0131 g\u00fcnden g\u00fcn\u00fcm\u00fcze \u00fclke ekonomisine 1 milyar liradan fazla katk\u0131 yapt\u0131\u011f\u0131 ifade edildi.<\/span><\/strong><\/p>\n<p>Ermenek Baraj\u0131 ve HES\u2019in, 309 megavat kurulu g\u00fcce sahip oldu\u011fu,\u00a0toplamda y\u0131ll\u0131k 1 milyar 187 milyon kilovatsaat enerji \u00fcretim kapasitesi olan bu yat\u0131r\u0131m\u0131n \u00fclke ekonomisine y\u0131ll\u0131k 1 milyar lira katk\u0131 sa\u011flad\u0131\u011f\u0131, baraj\u0131n 2012&#8217;den\u00a0g\u00fcn\u00fcm\u00fcze enerji \u00fcretmeye ba\u015flad\u0131\u011f\u0131n\u0131 ve \u015fimdiye kadar ise 4 milyar 155 milyon kilovatsaat elektrik enerji \u00fcretimi ger\u00e7ekle\u015ftirdi\u011fi belirtildi.<\/p>\n<p>Orman ve Su \u0130\u015fleri Bakan\u0131 Veysel Ero\u011flu taraf\u0131ndan t\u00fcm zorlu \u015fartlara ra\u011fmen bu g\u00fcn gelinen noktan\u0131n \u00f6nemine de\u011finilerek baraj\u0131n \u00fclke ekonomisine katk\u0131s\u0131n\u0131n bakanl\u0131k olarak kendilerini mutlu etti\u011fini, bu konuda \u00f6zverili\u00a0\u00e7al\u0131\u015fmalar\u0131n s\u00fcrd\u00fcr\u00fcld\u00fc\u011f\u00fc belirtildi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Orman ve Su \u0130\u015fleri Bakanl\u0131\u011f\u0131 Devlet Su \u0130\u015fleri (DS\u0130) Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc taraf\u0131ndan in\u015fa edilen Ermenek Baraj\u0131 ve HES\u2019 in i\u015fletmeye al\u0131nd\u0131\u011f\u0131 g\u00fcnden g\u00fcn\u00fcm\u00fcze [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":62937,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[1091,33654,19,63,67,1009,2698,165,18,117,33655,35370,1090,7548,1211],"views":1584,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/62936"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=62936"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/62936\/revisions"}],"predecessor-version":[{"id":62940,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/62936\/revisions\/62940"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/62937"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=62936"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=62936"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=62936"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}