{"id":62562,"date":"2017-03-20T19:17:21","date_gmt":"2017-03-20T16:17:21","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=62562"},"modified":"2017-03-20T19:17:45","modified_gmt":"2017-03-20T16:17:45","slug":"karapinar-yeka-1-ges-ihalesini-kalyon-hanwha-grubu-kazandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/karapinar-yeka-1-ges-ihalesini-kalyon-hanwha-grubu-kazandi\/","title":{"rendered":"(Turkish) Karap\u0131nar YEKA-1 GES \u0130halesini Kalyon Hanwha Grubu Kazand\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/62562\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #0a0a0a;\"><strong>Karap\u0131nar Yenilenebilir Enerji Kaynak Alan\u0131 (YEKA-1) ihalesi, 4 konsorsiyumun kat\u0131l\u0131m\u0131yla Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131nda\u00a0yap\u0131ld\u0131.<\/strong><\/p>\n<p style=\"color: #0a0a0a;\">\u0130hale 18 turda tamamland\u0131. Ba\u015flang\u0131\u00e7 teklifi 8 USD cent\/kWh ile Limak grubundan geldi. Kalyoncu- Hanwha Q Cells Grubu\u00a0<strong>6,99 USD cent\/k<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/gunes-santrali-ges-tarlasi-kurmak-istiyorum-peki-nereden-baslamaliyim.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-51895\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/gunes-santrali-ges-tarlasi-kurmak-istiyorum-peki-nereden-baslamaliyim-300x189.jpg\" alt=\"gunes-santrali-ges-tarlasi\" width=\"300\" height=\"189\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/gunes-santrali-ges-tarlasi-kurmak-istiyorum-peki-nereden-baslamaliyim-300x189.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/gunes-santrali-ges-tarlasi-kurmak-istiyorum-peki-nereden-baslamaliyim-500x316.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/gunes-santrali-ges-tarlasi-kurmak-istiyorum-peki-nereden-baslamaliyim-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/gunes-santrali-ges-tarlasi-kurmak-istiyorum-peki-nereden-baslamaliyim.jpg 765w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>wh<\/strong>\u00a0ile ihaleyi alan giri\u015fim oldu. \u0130halede 7,81 USD cent\/kWh fiyat teklifinden sonra ilk \u00e7ekilen grup Limak-CMEC-Hareon Solar Ortak Giri\u015fim Grubu oldu. \u0130kinci \u00e7ekilen grup, son 7,73 USD cent\/kWh teklifiyle \u00c7alik Enerji \u2013 Solargiga Ortak Giri\u015fim Grubu oldu. 18.tura kadar AKC G\u00fcne\u015f Ortak Giri\u015fim Grubu ile Kalyoncu-Hanwha Q Cells Grubu ihaleyi s\u00fcrd\u00fcrd\u00fc. Kalyoncu-Hanwha Grubu verdi\u011fi tekliflerde rahat ilerleyerek kazanan taraf oldu.<\/p>\n<p style=\"color: #0a0a0a;\">\u015eartnameye g\u00f6re, konsorsiyumun T\u00fcrkiye\u2019de g\u00fcne\u015f mod\u00fcllerinin t\u00fcm bile\u015fenlerini kapsayacak \u015fekilde y\u0131ll\u0131k en az 500 MW\u2019l\u0131k \u00fcretim kapasitesine sahip olmas\u0131 ve y\u00fczde 80 oran\u0131nda T\u00fcrk m\u00fchendislerin \u00e7al\u0131\u015ft\u0131\u011f\u0131 bir Ar-Ge merkezi kurmas\u0131 gerekmektedir. Yat\u0131r\u0131m tutar\u0131n\u0131n 1,3 milyar dolar d\u00fczeyinde olaca\u011f\u0131 \u00f6ng\u00f6r\u00fclmektedir.<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Karap\u0131nar Yenilenebilir Enerji Kaynak Alan\u0131 (YEKA-1) ihalesi, 4 konsorsiyumun kat\u0131l\u0131m\u0131yla Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131nda\u00a0yap\u0131ld\u0131. \u0130hale 18 turda tamamland\u0131. Ba\u015flang\u0131\u00e7 teklifi 8 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":51895,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[63,67,1009,2698,165,227,13,23133,22975,4269,25578,31781,33218,32142,33219],"views":1490,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/62562"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=62562"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/62562\/revisions"}],"predecessor-version":[{"id":62564,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/62562\/revisions\/62564"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/51895"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=62562"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=62562"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=62562"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}