{"id":62415,"date":"2017-03-12T18:36:53","date_gmt":"2017-03-12T15:36:53","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=62415"},"modified":"2017-03-12T18:36:53","modified_gmt":"2017-03-12T15:36:53","slug":"tarimsal-sulama-kaynakli-elektrik-borclari-yeniden-yapilandirilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/tarimsal-sulama-kaynakli-elektrik-borclari-yeniden-yapilandirilacak\/","title":{"rendered":"(Turkish) Tar\u0131msal Sulama Kaynakl\u0131 Elektrik Bor\u00e7lar\u0131 Yeniden Yap\u0131land\u0131r\u0131lacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/62415\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #0a0a0a;\"><strong>TEDA\u015e\u2019\u0131n tar\u0131msal sulamada kullan\u0131lan elektrik t\u00fcketiminden kaynaklanan alacaklar\u0131ndan, vadesi 15 \u015eubat 2017 itibar\u0131 ile geldi\u011fi halde d\u00fczenlemenin y\u00fcr\u00fcrl\u00fc\u011fe girdi\u011fi tarih itibar\u0131yla \u00f6denmemi\u015f olan bor\u00e7lar yeniden yap\u0131land\u0131r\u0131lacakt\u0131r.<\/strong><\/p>\n<p style=\"color: #0a0a0a;\"><span id=\"more-89562\"><\/span>Resmi Gazete\u2019de\u00a0yer alan kanunda T\u00fcrkiye Elektrik Da\u011f\u0131t\u0131m Anonim \u015eirketinin (TEDA\u015e) tar\u0131msal sulamad<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/tar\u0131msal-sulama-2383203-696x385.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-46725\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/tar\u0131msal-sulama-2383203-696x385-300x165.jpg\" alt=\"tar\u0131msal-sulama-2383203-696x385\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/tar\u0131msal-sulama-2383203-696x385-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/tar\u0131msal-sulama-2383203-696x385-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/tar\u0131msal-sulama-2383203-696x385-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/tar\u0131msal-sulama-2383203-696x385.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>a kullan\u0131lan elektrik t\u00fcketiminden kaynaklanan alacaklar\u0131ndan, vadesi <strong>15 \u015eubat 2017<\/strong> tarihi itibar\u0131yla geldi\u011fi halde \u00f6denmemi\u015f olan bor\u00e7lar da yap\u0131land\u0131rma kapsam\u0131nda yer alacakt\u0131r. Bor\u00e7lu, d\u00fczenlemenin y\u00fcr\u00fcrl\u00fc\u011fe girdi\u011fi tarihinden itibaren \u00fc\u00e7\u00fcnc\u00fc ay\u0131n sonuna kadar, elektrik da\u011f\u0131t\u0131m \u015firketine iletilmek \u00fczere TEDA\u015e\u2019a yaz\u0131l\u0131 ba\u015fvuruda bulunacak ve ilk taksiti 2017 y\u0131l\u0131n\u0131n Ekim ay\u0131 sonuna kadar \u00f6demesini yapacakt\u0131r.<\/p>\n<p style=\"color: #0a0a0a;\">Hesaplanan tutar\u0131n ilk taksit \u00f6deme s\u00fcresi i\u00e7inde tamamen \u00f6denmesi halinde, d\u00fczenlemenin y\u00fcr\u00fcrl\u00fc\u011fe girdi\u011fi tarihten \u00f6deme tarihine kadar ge\u00e7en s\u00fcre i\u00e7in faiz uygulanmayacakt\u0131r. Bor\u00e7lu; 6, 9, 12 veya 18 e\u015fit taksit \u00f6deme se\u00e7eneklerinden birisini se\u00e7ebilecek ve ilk iki taksidin s\u00fcresinde tam \u00f6denmemesi veya bir takvim y\u0131l\u0131nda ikiden fazla taksidin s\u00fcresinde \u00f6denmemesi halinde, bu d\u00fczenlemeden yararlanma hakk\u0131 kaybedilecektir.<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. TEDA\u015e\u2019\u0131n tar\u0131msal sulamada kullan\u0131lan elektrik t\u00fcketiminden kaynaklanan alacaklar\u0131ndan, vadesi 15 \u015eubat 2017 itibar\u0131 ile geldi\u011fi halde d\u00fczenlemenin y\u00fcr\u00fcrl\u00fc\u011fe girdi\u011fi tarih itibar\u0131yla \u00f6denmemi\u015f [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":46725,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[68,16501,61,19638,3149,1451,2873,63,67,1009,2698,165,13289,1216],"views":1087,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/62415"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=62415"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/62415\/revisions"}],"predecessor-version":[{"id":62416,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/62415\/revisions\/62416"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/46725"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=62415"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=62415"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=62415"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}