{"id":62315,"date":"2017-03-06T11:13:48","date_gmt":"2017-03-06T08:13:48","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=62315"},"modified":"2017-03-06T11:14:57","modified_gmt":"2017-03-06T08:14:57","slug":"ankara-elmadagda-6-mwlik-biyogaz-tesisi-kurulumu-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ankara-elmadagda-6-mwlik-biyogaz-tesisi-kurulumu-yapilacak\/","title":{"rendered":"(Turkish) Ankara Elmada\u011f&#8217;da 6 MW&#8217;l\u0131k Biyogaz Tesisi Kurulumu Yap\u0131lacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/62315\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Abrak Enerji Elektrik \u00dcretim A.\u015e.&#8217;nin Ankara \u0130li, Elmada\u011f \u0130l\u00e7esi, Hasano\u011flan-\u015eehitlik Mahallesi, 1812 Ada, 1 Nolu Parsel \u00fczerinde 6 MW kurulu g\u00fcce sahip \u201cBiyogaz Enerji Santrali\u201d projesini hayata ge<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/kirsehir-biyogaz-tesisi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-11529\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/kirsehir-biyogaz-tesisi-300x181.jpg\" alt=\"biyogaz-tesisi\" width=\"300\" height=\"181\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/kirsehir-biyogaz-tesisi-300x181.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/kirsehir-biyogaz-tesisi-80x48.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/kirsehir-biyogaz-tesisi.jpg 480w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\u00e7irilmesi planlanmaktad\u0131r.<\/strong><\/p>\n<p>Tesiste kullan\u0131lacak at\u0131klar\u0131n \u00f6zelliklerine g\u00f6re 800-1200 ton\/g\u00fcn taze b\u00fcy\u00fckba\u015f hayvan d\u0131\u015fk\u0131s\u0131, et ve yumurta tavu\u011fu d\u0131\u015fk\u0131s\u0131, meyve-sebze posas\u0131 ve de az miktarda tarla at\u0131klar\u0131 gibi at\u0131klar kullan\u0131larak 6 MWe kurulu elektrik g\u00fcc\u00fcne ula\u015f\u0131lacakt\u0131r. Tesis yan \u00e7\u0131kt\u0131lar olarak organik g\u00fcbre ve at\u0131k \u0131s\u0131 \u00fcretimi de yapacakt\u0131r.<\/p>\n<p>\u00dcretilen elektrik, orta gerilim hatt\u0131na verilerek enterkonnekte a\u011fa ula\u015ft\u0131r\u0131lacak. Ayr\u0131ca s\u00f6z konusu tesisin kurulmas\u0131 ile b\u00f6lgede bulunan organik at\u0131k \u00fcreticilerinin de at\u0131klar\u0131n\u0131n tesise al\u0131narak bertaraf\u0131 ger\u00e7ekle\u015ftirilecektir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Abrak Enerji Elektrik \u00dcretim A.\u015e.&#8217;nin Ankara \u0130li, Elmada\u011f \u0130l\u00e7esi, Hasano\u011flan-\u015eehitlik Mahallesi, 1812 Ada, 1 Nolu Parsel \u00fczerinde 6 MW kurulu g\u00fcce sahip \u201cBiyogaz [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":11529,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,53],"tags":[33427,2674,641,68,33428,63,67,1009,2698,165,25283],"views":2760,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/62315"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=62315"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/62315\/revisions"}],"predecessor-version":[{"id":62316,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/62315\/revisions\/62316"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/11529"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=62315"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=62315"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=62315"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}