{"id":62224,"date":"2017-03-02T13:09:57","date_gmt":"2017-03-02T10:09:57","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=62224"},"modified":"2017-03-02T13:10:48","modified_gmt":"2017-03-02T10:10:48","slug":"yerli-enerji-stratejisiyle-8-bin-mwlik-elektrik-uretim-tesisi-geliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yerli-enerji-stratejisiyle-8-bin-mwlik-elektrik-uretim-tesisi-geliyor\/","title":{"rendered":"(Turkish) Yerli Enerji Stratejisiyle 8 Bin MW&#8217;l\u0131k Elektrik \u00dcretim Tesisi Geliyor&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/62224\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #0a0a0a;\"><strong>T\u00fcrkiye\u2019nin \u201cyerli enerji\u201d stratejisi kapsam\u0131nda, yakla\u015f\u0131k olarak 8 bi\u0307n megavat elektrik \u00fcretim kapasitesine sahip olaca\u011f\u0131 \u00f6ng\u00f6r\u00fclen yeni k\u00f6m\u00fcr sahalar\u0131n\u0131n 30\u00a0y\u0131ll\u0131\u011f\u0131na \u00f6zel sekt\u00f6re devredilerek ekonomiye kazand\u0131r\u0131lmas\u0131 planlanmaktad\u0131r.<\/strong><\/p>\n<p style=\"color: #0a0a0a;\">720 megavatl\u0131k elektrik \u00fcretim santra<img loading=\"lazy\" class=\"alignleft  wp-image-6482\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/komur-santrali-111-505x378-300x224.jpg\" alt=\"komur-santrali\" width=\"300\" height=\"206\" \/>li kurulacak \u00c7ay\u0131rhan B sahas\u0131 ve termik santralinin 30 y\u0131l s\u00fcreyle \u00f6zel sekt\u00f6re devredilmesi ihalesiyle ba\u015flayan s\u00fcre\u00e7, Eski\u015fehir Alpu\u2019da 4 bin megavatl\u0131k, Afyon Dinar\u2019da bin 400 megavatl\u0131k, Tekirda\u011f\u2019da bin megavatl\u0131k ve K\u0131rklareli\u2019nde 800 megavatl\u0131k yeni sahalar\u0131n \u00f6zelle\u015ftirilmesiyle\u00a0s\u00fcrecektir.<\/p>\n<p style=\"color: #0a0a0a;\">Yap\u0131lan hesaplamalara g\u00f6re, bin megavatl\u0131k elektrik santralinin i\u015fletilebilmesi i\u00e7in 2,7 milyon ton k\u00f6m\u00fcre ihtiya\u00e7 duyulmaktad\u0131r. Bu santral ithal k\u00f6m\u00fcrle kuruldu\u011funda, ithal k\u00f6m\u00fcre y\u0131lda 200 milyon dolar \u00f6deme yap\u0131lmaktad\u0131r. E\u011fer santral yerli k\u00f6m\u00fcre\u00a0dayal\u0131 olarak i\u015fletilirse, bu rakam yurt i\u00e7inde kalmaktad\u0131r. B\u00f6ylece bin megavatl\u0131k bir santral, 30 y\u0131ll\u0131k \u00f6mr\u00fc boyunca 6 milyar dolar\u0131n T\u00fcrkiye\u2019de kalmas\u0131n\u0131\u00a0sa\u011flamaktad\u0131r.<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye\u2019nin \u201cyerli enerji\u201d stratejisi kapsam\u0131nda, yakla\u015f\u0131k olarak 8 bi\u0307n megavat elektrik \u00fcretim kapasitesine sahip olaca\u011f\u0131 \u00f6ng\u00f6r\u00fclen yeni k\u00f6m\u00fcr sahalar\u0131n\u0131n 30\u00a0y\u0131ll\u0131\u011f\u0131na \u00f6zel sekt\u00f6re [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":6482,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[260,19,63,67,1009,2698,165,1675,15492,33387],"views":825,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/62224"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=62224"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/62224\/revisions"}],"predecessor-version":[{"id":62226,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/62224\/revisions\/62226"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/6482"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=62224"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=62224"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=62224"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}