{"id":62123,"date":"2017-02-26T14:25:10","date_gmt":"2017-02-26T11:25:10","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=62123"},"modified":"2017-02-26T14:25:10","modified_gmt":"2017-02-26T11:25:10","slug":"kastamonuda-4-mw-gucunde-hes-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kastamonuda-4-mw-gucunde-hes-kurulacak\/","title":{"rendered":"(Turkish) Kastamonu&#8217;da 4 MW G\u00fcc\u00fcnde HES Kurulacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/62123\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>KC Elektrik \u00dcretim A.\u015e. taraf\u0131nd<img loading=\"lazy\" class=\"alignright wp-image-53152 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/05\/turkiye-enerjisinin-yuzde-354unu-heslerden-aldi-300x200.jpg\" alt=\"turkiye-enerjisinin-yuzde-354unu-heslerden-aldi\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/05\/turkiye-enerjisinin-yuzde-354unu-heslerden-aldi-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/05\/turkiye-enerjisinin-yuzde-354unu-heslerden-aldi-1024x683.jpg 1024w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/05\/turkiye-enerjisinin-yuzde-354unu-heslerden-aldi-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/05\/turkiye-enerjisinin-yuzde-354unu-heslerden-aldi-74x50.jpg 74w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/05\/turkiye-enerjisinin-yuzde-354unu-heslerden-aldi.jpg 1068w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>an Kastamonu \u0130li, Ara\u00e7 \u0130l\u00e7esi s\u0131n\u0131rlar\u0131 i\u00e7erisinde Ba\u015fk\u00f6y deresi \u00fczerinde Ba\u015fk\u00f6y Reg\u00fclat\u00f6r\u00fc ve HES Projesi (4,45 MWm\/4,25 MWe)\u2019nin kurulmas\u0131 ve i\u015fletilmesi planlan\u0131yor.<\/strong><\/p>\n<p>9.650.000 TL bedelli proje kapsam\u0131nda\u00a04,73 MW kurulu g\u00fcce sahip HES\u2019in\u00a0y\u0131lda toplam 10.51 GWh enerji \u00fcretilmesi\u00a0hedeflenmektedir.<\/p>\n<p>Projenin in\u015faat a\u015famas\u0131nda 75, i\u015fletme a\u015famas\u0131nda ise 10 personelin \u00e7al\u0131\u015fmas\u0131 planlanmaktad\u0131r. Projenin ekonomik \u00f6mr\u00fc 2 y\u0131l s\u00fcrecek in\u015faat faaliyetlerinden sonra 50 y\u0131l olarak \u00f6ng\u00f6r\u00fclmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.KC Elektrik \u00dcretim A.\u015e. taraf\u0131ndan Kastamonu \u0130li, Ara\u00e7 \u0130l\u00e7esi s\u0131n\u0131rlar\u0131 i\u00e7erisinde Ba\u015fk\u00f6y deresi \u00fczerinde Ba\u015fk\u00f6y Reg\u00fclat\u00f6r\u00fc ve HES Projesi (4,45 MWm\/4,25 MWe)\u2019nin kurulmas\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":53152,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[33340,33341,68,63,67,1009,2698,165,35370,1090,2186,33339],"views":2147,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/62123"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=62123"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/62123\/revisions"}],"predecessor-version":[{"id":62124,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/62123\/revisions\/62124"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/53152"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=62123"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=62123"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=62123"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}