{"id":62076,"date":"2017-02-24T11:42:38","date_gmt":"2017-02-24T08:42:38","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=62076"},"modified":"2017-02-24T11:42:38","modified_gmt":"2017-02-24T08:42:38","slug":"nigde-osbde-5-lisanssiz-ges-kurulumu-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/nigde-osbde-5-lisanssiz-ges-kurulumu-yapilacak\/","title":{"rendered":"(Turkish) Ni\u011fde OSB&#8217;de 5 Lisanss\u0131z GES Kurulumu Yap\u0131lacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/62076\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Ni\u011fde OSB M\u00fcd\u00fcrl\u00fc\u011f\u00fc&#8217;nce Ni\u011fde Merkez&#8217;de Ni\u011fde Organize Sanayi B\u00f6lgesi, Bor yolu cad. 137 numarada 5 MW kurulu g\u00fcc\u00fcnde G\u00fcne\u015f Enerjisi Santrali kurulup i\u015fletilecektir.<\/strong><\/p>\n<p>24.000.000 TL bedelli proje kapsam\u0131nda yer alan toplam 99.694,92 m2 y\u00fcz\u00f6l\u00e7\u00fcm\u00fcndeki tapulu alan\u0131n 86.496 m2\u2019lik k\u0131sm\u0131nda, <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/kayseri-osb-gunes-enerjisi-santraline-kavusuyor.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-38329\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/kayseri-osb-gunes-enerjisi-santraline-kavusuyor-300x152.jpg\" alt=\"kayseri-osb-gunes-enerjisi-santraline-kavusuyor\" width=\"300\" height=\"152\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/kayseri-osb-gunes-enerjisi-santraline-kavusuyor-300x152.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/kayseri-osb-gunes-enerjisi-santraline-kavusuyor-500x254.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/kayseri-osb-gunes-enerjisi-santraline-kavusuyor-80x40.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/kayseri-osb-gunes-enerjisi-santraline-kavusuyor.jpg 870w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>g\u00fcc\u00fc 1,00 MWe olan 5 lisanss\u0131z elektrik \u00fcretim tesisisin kurulumu yap\u0131lacakt\u0131r. Tesisler, tamamen ba\u011f\u0131ms\u0131z \u00fcretim yapacak \u015fekilde tesis edilecektir ve \u00fcretimleri ayr\u0131 saya\u00e7lardan ge\u00e7erek sisteme aktar\u0131m\u0131 sa\u011flanacakt\u0131r.<\/p>\n<p>Projenin in\u015faat a\u015famas\u0131nda ayda 25 g\u00fcn, g\u00fcnde 8 saatlik bir \u00e7al\u0131\u015fma yap\u0131lacak olunup, i\u015fletme a\u015famas\u0131nda tesis 365 g\u00fcn\/y\u0131l ve 24 saat\/g\u00fcn \u00e7al\u0131\u015fma prensibi ile elektrik \u00fcretimi yapacakt\u0131r. \u0130n\u015faat a\u015famas\u0131nda 10 ki\u015fi \u00e7al\u0131\u015facak tesiste, i\u015fletme a\u015famas\u0131nda; 1 g\u00fcnd\u00fcz bek\u00e7isi, 1 gece bek\u00e7ici ve 1 kontrol\u00f6r olmak \u00fczere 3 teknik ve 2 idari personel olmak \u00fczere toplamda 5 ki\u015fi\u00a0bulunacakt\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Ni\u011fde OSB M\u00fcd\u00fcrl\u00fc\u011f\u00fc&#8217;nce Ni\u011fde Merkez&#8217;de Ni\u011fde Organize Sanayi B\u00f6lgesi, Bor yolu cad. 137 numarada 5 MW kurulu g\u00fcc\u00fcnde G\u00fcne\u015f Enerjisi Santrali kurulup i\u015fletilecektir. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":38329,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[68,63,67,1009,2698,165,21886,227,13,21768,23133,22975,4269,33326,33325],"views":2028,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/62076"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=62076"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/62076\/revisions"}],"predecessor-version":[{"id":62077,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/62076\/revisions\/62077"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/38329"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=62076"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=62076"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=62076"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}