{"id":62048,"date":"2017-02-23T12:08:58","date_gmt":"2017-02-23T09:08:58","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=62048"},"modified":"2017-02-23T12:35:12","modified_gmt":"2017-02-23T09:35:12","slug":"balabanli-res-ile-60-bin-hanenin-yillik-elektrik-ihtiyaci-karsilanacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/balabanli-res-ile-60-bin-hanenin-yillik-elektrik-ihtiyaci-karsilanacak\/","title":{"rendered":"(Turkish) Balabanl\u0131 RES \u0130le 60 Bin Hanenin Y\u0131ll\u0131k Elektrik \u0130htiyac\u0131 Kar\u015f\u0131lanacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/62048\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #0a0a0a;\"><strong>Borusan EnBW Enerji&#8217;nin Tekirda\u011f\u2019da kurdu\u011fu ve 2014 y\u0131l\u0131ndan bug\u00fcne faaliyette olan Balabanl\u0131 R\u00fczg\u00e2r Enerjisi Santralin\u0131n (<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/02\/balabanli-res-ile-60-bin-hanenin-yillik-elektrik-ihtiyaci-karsilanacak.jpg\"><img loading=\"lazy\" class=\"alignleft  wp-image-62049\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/02\/balabanli-res-ile-60-bin-hanenin-yillik-elektrik-ihtiyaci-karsilanacak-300x215.jpg\" alt=\"balabanli-res-ile-60-bin-hanenin-yillik-elektrik-ihtiyaci-karsilanacak\" width=\"300\" height=\"232\" \/><\/a>RES) kurulu g\u00fcc\u00fc 50,6 MWm d\u00fczeyinden 61,4 MWm\u2019e\u00a0y\u00fckseltildi.<\/strong><\/p>\n<p style=\"color: #0a0a0a;\"><span id=\"more-89061\"><\/span>Borusan EnBW Enerji, Tekirda\u011f\u2019daki Balabanl\u0131 R\u00fczg\u00e2r Enerjisi Santralinin (RES) kapasite art\u0131\u015f \u00e7al\u0131\u015fmas\u0131n\u0131 bitirdi. 2014&#8217;den bu yana 50,6 MWm kurulu g\u00fc\u00e7le faaliyette olan Balabanl\u0131 RES\u2019in kapasitesinde 10,8 MWm art\u0131\u015f yap\u0131ld\u0131. B\u00f6ylece RES\u2019in kurulu g\u00fcc\u00fc 61,4 MWm\u2019ye\u00a0ula\u015ft\u0131.<\/p>\n<p style=\"color: #0a0a0a;\">Yap\u0131lan a\u00e7\u0131klamada\u00a0ise Balabanl\u0131 RES i\u00e7in 10,8 MWm kapasite art\u0131\u015f\u0131 hakk\u0131 2016\u2019da elde edildi. Kapasite Art\u0131\u015f\u0131 Lisans Tadili sonras\u0131nda b\u00fct\u00fcn a\u015famalar\u0131yla 13 aydan k\u0131sa bir s\u00fcrede tamamland\u0131. R\u00fczg\u00e2ra dayal\u0131 olarak temiz ve s\u00fcrd\u00fcr\u00fclebilir elektrik enerjisi \u00fcreten tesis yakla\u015f\u0131k 60.000 hanenin y\u0131ll\u0131k elektrik enerji ihtiyac\u0131n\u0131 kar\u015f\u0131layacakt\u0131r.<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Borusan EnBW Enerji&#8217;nin Tekirda\u011f\u2019da kurdu\u011fu ve 2014 y\u0131l\u0131ndan bug\u00fcne faaliyette olan Balabanl\u0131 R\u00fczg\u00e2r Enerjisi Santralin\u0131n (RES) kurulu g\u00fcc\u00fc 50,6 MWm d\u00fczeyinden 61,4 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":62049,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[14226,14225,61,19,63,67,1009,2698,165,474,33314,231,312],"views":1175,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/62048"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=62048"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/62048\/revisions"}],"predecessor-version":[{"id":62058,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/62048\/revisions\/62058"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/62049"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=62048"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=62048"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=62048"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}