{"id":61902,"date":"2017-02-14T10:42:06","date_gmt":"2017-02-14T07:42:06","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=61902"},"modified":"2017-02-14T10:42:06","modified_gmt":"2017-02-14T07:42:06","slug":"ge-mobil-enerji-santrali-ile-yemenin-elektrik-ihtiyacini-karsilayacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ge-mobil-enerji-santrali-ile-yemenin-elektrik-ihtiyacini-karsilayacak\/","title":{"rendered":"(Turkish) GE, Mobil Enerji Santrali ile Yemen\u2019in Elektrik \u0130htiyac\u0131n\u0131 Kar\u015f\u0131layacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/61902\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Yap\u0131lan anla\u015fma kapsam\u0131nda \u00c7al\u0131k Enerji\u2019ye, 60 megawatt&#8217;a (MW) kadar h\u0131zl\u0131 enerji sunabilecek olan, GE&#8217;ye ait geli\u015fmi\u015f iki adet TM2500 mobil aeroderivetif gaz t\u00fcrbini jenerat\u00f6r\u00fc sa\u011flanacak.<\/strong><\/p>\n<p>GE (NYSE: GE) ile \u00c7al\u0131k Enerji, Yemen&#8217;in elektrik altyap\u0131s\u0131n\u0131 desteklemek \u00fczere anla\u015fma imzalad\u0131. Bu kapsamda GE, iki adet geli\u015fmi\u015f <a href=\"https:\/\/powergen.gepower.com\/products\/aeroderivative-gas-turbines\/tm2500-gas-turbine-family.html\">TM2500 aeroderivetif gaz t\u00fcrbini jenerat\u00f6r\u00fc<\/a> sa\u011flayacak. Aden&#8217;deki elektrik ihtiyac\u0131n\u0131 h\u0131zl\u0131 bir \u015fekilde kar\u015f\u0131layacak olan jenerat\u00f6rler, 60 megawatt&#8217;a (MW) kadar elektrik \u00fcretecek. GE&#8217;nin Macaristan&#8217;da bulunan tesisinden g\u00f6nderilen gaz <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/02\/ge-mobil-enerji-santrali-ile-yemenin-elektrik-ihtiyacini-karsilayacak.jpg\"><img loading=\"lazy\" class=\"alignright  wp-image-61903\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/02\/ge-mobil-enerji-santrali-ile-yemenin-elektrik-ihtiyacini-karsilayacak-300x225.jpg\" alt=\"ge-mobil-enerji-santrali-ile-yemenin-elektrik-ihtiyacini-karsilayacak\" width=\"300\" height=\"212\" \/><\/a>t\u00fcrbinlerinin k\u0131sa s\u00fcrede kurularak yaz aylar\u0131ndan \u00f6nce elektrik sa\u011flamas\u0131 planlan\u0131yor.<\/p>\n<p>Sahadaki zorlu ko\u015fullara ra\u011fmen GE ve \u00c7al\u0131k Enerji&#8217;nin projeyi k\u0131sa s\u00fcrede hayata ge\u00e7irebilmeleri, Yemen\u2019in g\u00fc\u00e7l\u00fc bir altyap\u0131 olu\u015fturma ve ekonomiyi yeniden canland\u0131rma \u00e7abalar\u0131na da katk\u0131da bulunacak. Power Electricity Corporation\u2019a ait olan (PEC)Yemen&#8217;deki Al Hiswa Enerji Santrali i\u00e7in geli\u015ftirilen projeyi, Katar Kalk\u0131nma Fonu (QFFD) finanse ediyor.<\/p>\n<p><strong>\u00c7al\u0131k Enerjii CIS Projeler ve Teklif Koordinat\u00f6r\u00fc \u00d6zg\u00fcr Sar\u0131kaya<\/strong> konuyla ilgili olarak; <em>\u201cAl Hiswa Enerji Santrali, end\u00fcstriyel b\u00fcy\u00fcmenin getirdi\u011fi artan enerji ihtiyac\u0131 ile vatanda\u015flar\u0131n g\u00fcnl\u00fck ihtiya\u00e7lar\u0131n\u0131 kar\u015f\u0131lamak a\u00e7\u0131s\u0131ndan Yemen i\u00e7in stratejik bir \u00f6neme sahip.Tesisin GE&#8217;nin geli\u015fmi\u015f aeroderivetif gaz t\u00fcrbini jenerat\u00f6rlerini kullanacak \u015fekilde geni\u015fletilmesi ile h\u0131zl\u0131 ve istikrarl\u0131 bir \u015fekilde enerji sa\u011flayabilece\u011fiz. Bu t\u00fcrbinler, kesintisiz enerji \u00fcretimi a\u00e7\u0131s\u0131ndan kritik \u00f6nem ta\u015f\u0131yan yak\u0131t esnekli\u011fi sa\u011flayarak verimliliklerini kan\u0131tlam\u0131\u015f bulunuyor&#8221;<\/em>dedi.<\/p>\n<p>GE Orta Do\u011fu ve Kuzey Afrika B\u00f6lgesi Gaz Enerji Sistemleri Sat\u0131\u015f\u0131ndan Sorumlu Ba\u015fkan ve CEO\u2019su olan Ghassan Barghout ise \u015fu s\u00f6zleri dile getirdi: <em>&#8220;Geli\u015fmi\u015f gaz t\u00fcrbini jenerat\u00f6rleri sunmaya y\u00f6nelik bu anla\u015fmam\u0131z, uzak ve zorlu b\u00f6lgelerde bile 4-5 ay i\u00e7inde g\u00fcvenilir enerji sa\u011flama yetkinliklerimizi g\u00f6steriyor. Lojistik anlamda b\u00fcy\u00fck g\u00fc\u00e7l\u00fcklere ra\u011fmen ciddi bir dalgalanma d\u00f6neminin ard\u0131ndan Yemen&#8217;in elektrik altyap\u0131s\u0131n\u0131 geli\u015ftirmeyi desteklemek \u00fczere b\u00f6lgesel payda\u015flarla birlikte \u00e7al\u0131\u015farak vatanda\u015flar\u0131n refah\u0131n\u0131 y\u00fckseltmek i\u00e7in faaliyet g\u00f6steriyoruz. Bu anla\u015fma, Yemen&#8217;e ger\u00e7ekle\u015ftirdi\u011fimiz ilk GE aeroderivetif jenerat\u00f6rlerinin sat\u0131\u015f\u0131d\u0131r. \u0130leride \u00fclkenin elektrik altyap\u0131s\u0131n\u0131 kalk\u0131nd\u0131rmaya yard\u0131mc\u0131 olacak projeleri hayata ge\u00e7irmeyi heyecanla bekliyoruz.&#8221;<\/em><\/p>\n<p>GE&#8217;nin &#8220;Mobil Enerji Santrali&#8221; olarak bilinen TM2500 aeroderivetif gaz t\u00fcrbini jenerat\u00f6r\u00fc, h\u0131zl\u0131 bir \u015fekilde enerji \u00e7\u00f6z\u00fcm\u00fc sunuyor ve genellikle acil durumlarda elektrik sa\u011flamak \u00fczere kullan\u0131l\u0131yor. Kolay kuruluma sahip bu eksiksiz anahtar teslim enerji \u00e7\u00f6z\u00fcm\u00fc, ihtiya\u00e7 duyulan yerde ve ihtiya\u00e7 duyulan zamanda enerji sa\u011fl\u0131yor. Donan\u0131mda \u00f6nemli bir de\u011fi\u015fiklik gerektirmeyen \u00e7\u00f6z\u00fcm, gazl\u0131 ve likit yak\u0131tla \u00e7al\u0131\u015fabiliyor ve sadece 10 dakikal\u0131k k\u0131sa bir ba\u015flatma d\u00f6ng\u00fcs\u00fc gerektiriyor. Jenerat\u00f6rler, Al Hiswa santralinde likit dam\u0131t\u0131lm\u0131\u015f yak\u0131tla kullan\u0131lacak.<\/p>\n<p>Y\u00fcksek g\u00fc\u00e7 yo\u011funlu\u011funa imkan veren TM2500, kompakt bir ayakizi b\u0131rak\u0131yor ve d\u00fc\u015f\u00fck a\u011f\u0131rl\u0131\u011f\u0131 daha fazla mobilite sa\u011fl\u0131yor. \u00d6nemli bir sermaye harcamas\u0131 gerektirmeksizin kademeli geni\u015flemeye imkan veren \u00f6l\u00e7eklenebilir teknoloji \u00e7\u00f6z\u00fcmleri sunuyor ve gazla \u00e7al\u0131\u015ft\u0131r\u0131ld\u0131\u011f\u0131nda dizel jenerat\u00f6rlerden y\u00fczde 50 daha d\u00fc\u015f\u00fck emisyonu bulunuyor.<\/p>\n<p>GE ve \u00c7al\u0131k Enerji, Orta Do\u011fu ve Kuzey Afrika&#8217;ya 2.500 MW&#8217;\u0131n \u00fczerinde elektrik sa\u011flamak \u00fczere i\u015fbirli\u011fi yap\u0131yor ve Irak&#8217;tan Libya&#8217;ya kadar \u00e7e\u015fitli projeleri ba\u015far\u0131yla hayata ge\u00e7iriyor. Orta Do\u011fu ve Kuzey Afrika&#8217;da 80 y\u0131l\u0131 a\u015fk\u0131n bir s\u00fcredir faaliyet g\u00f6steren GE, b\u00f6lgenin elektrik \u00fcretimi, petrol ve gaz, su ar\u0131tma, havac\u0131l\u0131k ve sa\u011fl\u0131k alanlar\u0131ndaki altyap\u0131 ihtiya\u00e7lar\u0131n\u0131 destekliyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Yap\u0131lan anla\u015fma kapsam\u0131nda \u00c7al\u0131k Enerji\u2019ye, 60 megawatt&#8217;a (MW) kadar h\u0131zl\u0131 enerji sunabilecek olan, GE&#8217;ye ait geli\u015fmi\u015f iki adet TM2500 mobil aeroderivetif gaz t\u00fcrbini [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":61903,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[598,68,61,7219,63,67,1009,2698,165,33215,2422,33214,33217,33216,2810],"views":974,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/61902"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=61902"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/61902\/revisions"}],"predecessor-version":[{"id":61904,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/61902\/revisions\/61904"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/61903"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=61902"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=61902"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=61902"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}