{"id":61900,"date":"2017-02-14T10:32:00","date_gmt":"2017-02-14T07:32:00","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=61900"},"modified":"2017-02-14T10:32:00","modified_gmt":"2017-02-14T07:32:00","slug":"vestas-turkiye-yatirimlarini-surdurecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/vestas-turkiye-yatirimlarini-surdurecek\/","title":{"rendered":"(Turkish) Vestas T\u00fcrkiye Yat\u0131r\u0131mlar\u0131n\u0131 S\u00fcrd\u00fcrecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/61900\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>2008&#8217;te Ocak ay\u0131nda kurulan Vestas T\u00fcrkiye\u2019nin toplam yakla\u015f\u0131k 1,3 GW kurulu kapasitesi bulunmaktad\u0131r. \u0130lk r\u00fczgar t\u00fcrbininin T\u00fcrkiye&#8217;ye geldi\u011fi 1984 y\u0131l\u0131ndan bu yana sekt\u00f6rde faaliyetlerde bulunan \u015firket T\u00fcrkiye yat\u0131r\u0131mlar\u0131na devam edece\u011fini belirtti.<\/strong><\/p>\n<p><strong>2016&#8217;DA GEL\u0130R VE YATIRIMLAR ARTI\u015e G\u00d6STERD\u0130<\/strong><\/p>\n<p>Danimarka merkezli r\u00fczgar t\u00fcrbinleri<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/vestas-sili-ruzgar-turbini-satis.jpg\"><img loading=\"lazy\" class=\"alignleft  wp-image-35033\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/vestas-sili-ruzgar-turbini-satis-300x168.jpg\" alt=\"vestas-ruzgar-turbini\" width=\"300\" height=\"144\" \/><\/a> \u00fcreticisi Vestas, r\u00fczgar t\u00fcrbini sipari\u015flerindeki art\u0131\u015f ve sekt\u00f6rdeki b\u00fcy\u00fcmenin de etkisiyle 2016 y\u0131l\u0131n\u0131 ba\u015far\u0131l\u0131 finansal sonu\u00e7lar ve faaliyetlerindeki art\u0131\u015f ile tamamlam\u0131\u015ft\u0131r. \u015eirket, 2016\u2019da 41 milyar TL\u2019ye yak\u0131n kazan\u00e7 elde ederken, y\u0131l\u0131 y\u00fczde 13,9\u2019luk faiz ve vergi \u00f6ncesi karla kapatm\u0131\u015ft\u0131r. Vestas\u2019\u0131n toplam yat\u0131r\u0131m tutar\u0131 da 2,5 milyar TL olmu\u015ftur. 2015&#8217;te 8 bin 943 MW olan r\u00fczgar t\u00fcrbini sipari\u015f al\u0131mlar\u0131 2016 y\u0131l\u0131nda ise artarak 10 bin 494 MW&#8217;a\u00a0kadar y\u00fckselmi\u015ftir.<\/p>\n<p><strong>S\u0130PAR\u0130\u015eLERDE REKOR \u00a02016 YILINDA<\/strong><\/p>\n<p>Vestas&#8217;\u0131n y\u0131ll\u0131k performans\u0131n\u0131 de\u011ferlendiren Vestas Grup Ba\u015fkan\u0131 ve CEO&#8217;su Anders Runevad, &#8220;Vestas 2016 y\u0131l\u0131nda has\u0131lat, EBIT marj\u0131, net kar, serbest nakit ak\u0131\u015f\u0131, sipari\u015f al\u0131mlar\u0131 ve biriken sipari\u015fler a\u00e7\u0131s\u0131ndan rekor bir y\u0131l ge\u00e7irdi. Teslimatlar y\u0131ll\u0131k bazda y\u00fczde 29&#8217;u a\u015farken, maliyetleri s\u0131k\u0131 bir \u015fekilde kontrol etmeyi s\u00fcrd\u00fcrd\u00fck. Faaliyet g\u00f6sterdi\u011fimiz t\u00fcm b\u00f6lgelerin bu sonu\u00e7larda katk\u0131s\u0131 mevcuttur. Bu sonu\u00e7larla Vestas\u2019\u0131n k\u00fcresel g\u00fcc\u00fcn\u00fc ortaya koymaktan memnuniyet duymaktay\u0131z.\u201d\u00a0ifadelerine yer verdi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.2008&#8217;te Ocak ay\u0131nda kurulan Vestas T\u00fcrkiye\u2019nin toplam yakla\u015f\u0131k 1,3 GW kurulu kapasitesi bulunmaktad\u0131r. \u0130lk r\u00fczgar t\u00fcrbininin T\u00fcrkiye&#8217;ye geldi\u011fi 1984 y\u0131l\u0131ndan bu yana sekt\u00f6rde [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":35033,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[33213,63,67,1009,2698,165,474,69,16,231,23318,22615,4784,324,4130,846,4734,1286],"views":1692,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/61900"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=61900"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/61900\/revisions"}],"predecessor-version":[{"id":61901,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/61900\/revisions\/61901"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/35033"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=61900"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=61900"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=61900"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}