{"id":6186,"date":"2013-02-07T10:02:41","date_gmt":"2013-02-07T07:02:41","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=6186"},"modified":"2013-02-07T10:03:09","modified_gmt":"2013-02-07T07:03:09","slug":"aksa-cinli-cntic-ile-7-adet-hes-yapacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aksa-cinli-cntic-ile-7-adet-hes-yapacak\/","title":{"rendered":"(Turkish) Aksa, \u00c7inli CNTIC \u0130le 7 Adet HES Yapacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/6186\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Aksa Enerji \u00dcretim A\u015e, \u00c7inli CNTIC aras\u0131nda 251 megavat (MW) g\u00fcc\u00fcnde toplam yedi hidroelektrik enerji santrali (HES) ile ilgili mutabakat zapt\u0131 imzaland\u0131.<\/h2>\n<p>Aksa Enerji \u00dcretim A\u015e\u2019nin Kamuyu Ayd\u0131nlatma Platformu\u2019nda (KAP) yer alan a\u00e7\u0131klamas\u0131nda, Aksa Enerji ile China National Technical Import &amp; Export Corporation (CNTIC) aras\u0131nda, toplam 251 MW g\u00fcc\u00fcndeki yedi adet HES projesinin yap\u0131m\u0131 ile ilgili olarak bir Mutabakat Zapt\u0131 imzaland\u0131\u011f\u0131 bildirildi.<\/p>\n<p>A\u00e7\u0131klamada \u015fu bilgilere yer verildi:<\/p>\n<p><img loading=\"lazy\" class=\"alignright size-medium wp-image-6188\" title=\"aksaenerjigiresun\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/aksaenerjigiresun-300x182.jpg\" alt=\"\" width=\"300\" height=\"182\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/aksaenerjigiresun-300x182.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/aksaenerjigiresun-80x48.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/aksaenerjigiresun.jpg 468w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>\u201dCNTIC finansman dahil proje \u00fcstlenicisi olacak olup, finansman\u0131n, ana orta\u011f\u0131m\u0131z olan Kazanc\u0131 Holding\u2019in Goldman Sachs ile yapm\u0131\u015f oldu\u011fu anla\u015fmalar kapsam\u0131nda mevcut kredit\u00f6rlerinden olan China Development Bank ba\u015fta olmak \u00fczere \u00c7in merkezli finansal kurumlar taraf\u0131ndan y\u00fczde 85 finansman \u2013 y\u00fczde 15 \u00f6zkaynak modeline g\u00f6re sa\u011flanmas\u0131 \u00f6ng\u00f6r\u00fclm\u00fc\u015ft\u00fcr.<\/p>\n<p>Finansman ile ilgili nihai d\u00f6k\u00fcmantasyonun 2013 y\u0131l ortas\u0131na kadar tamamlanmas\u0131 beklenmektedir. \u00d6n\u00fcm\u00fczdeki y\u0131llarda devreye girmeleri ile birlikte mevcut durumda 2 bin 45 MW olan toplam kurulu g\u00fcc\u00fcm\u00fcze 251 megavatl\u0131k ilave yenilenebilir kaynakl\u0131 kurulu g\u00fc\u00e7 sa\u011flanacak olup, bu santrallerden beklenen toplam y\u0131ll\u0131k \u00fcretim miktar\u0131 yakla\u015f\u0131k 830 GWh olacakt\u0131r. S\u00f6z konusu yedi hidroelektrik santrali projesi i\u00e7in toplam yat\u0131r\u0131m tutar\u0131 ise yakla\u015f\u0131k 463 milyon dolar tutar\u0131ndad\u0131r.\u201d<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/02\/06\/aksa-enerji-ile-cinli-cntic-7-adet-hes-icin-anlasti\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Aksa Enerji \u00dcretim A\u015e, \u00c7inli CNTIC aras\u0131nda 251 megavat (MW) g\u00fcc\u00fcnde toplam yedi hidroelektrik enerji santrali (HES) ile ilgili mutabakat zapt\u0131 imzaland\u0131. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":6188,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[1571,2265,13,35370,1210],"views":674,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/6186"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=6186"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/6186\/revisions"}],"predecessor-version":[{"id":6189,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/6186\/revisions\/6189"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/6188"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=6186"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=6186"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=6186"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}