{"id":61807,"date":"2017-02-11T18:49:47","date_gmt":"2017-02-11T15:49:47","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=61807"},"modified":"2017-02-11T18:49:47","modified_gmt":"2017-02-11T15:49:47","slug":"asunim-turkiye-6-5-mw-gucundeki-sarioglan-ges-projesini-devreye-aldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/asunim-turkiye-6-5-mw-gucundeki-sarioglan-ges-projesini-devreye-aldi\/","title":{"rendered":"(Turkish) Asunim T\u00fcrkiye, 6.5 MW G\u00fcc\u00fcndeki Sar\u0131o\u011flan GES Projesini Devreye Ald\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/61807\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #0a0a0a;\"><strong>G\u00fcne\u015f Enerjisi firmas\u0131 Asunim T\u00fcrkiye taraf\u0131ndan Kayseri\u2019de kurulumu ger\u00e7ekle\u015ftirilen, 6.5 MWp g\u00fcc\u00fcndeki Sar\u0131o\u011flan GES projesi<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/02\/asunim-turkiye-6-5-mw-gucundeki-sarioglan-ges-projesini-devreye-aldi.jpeg\"><img loading=\"lazy\" class=\"alignleft  wp-image-61808\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/02\/asunim-turkiye-6-5-mw-gucundeki-sarioglan-ges-projesini-devreye-aldi-300x146.jpeg\" alt=\"asunim-turkiye-6-5-mw-gucundeki-sarioglan-ges-projesini-devreye-aldi\" width=\"300\" height=\"175\" \/><\/a> devreye al\u0131nd\u0131.<\/strong><\/p>\n<p style=\"color: #0a0a0a;\">Kayseri\u2019nin Sar\u0131o\u011flan il\u00e7esinde yer alan santralin kurulumu 5 ayl\u0131k s\u00fcrede tamamland\u0131. Teda\u015f ge\u00e7ici kabul\u00fc yap\u0131lan tesisin y\u0131lda 11 milyon kWh elektrik \u00fcretmesi beklenmektedir. Projede, 25116 adet Jinko Solar marka g\u00fcne\u015f paneli, 137 adet Refusol marka inverter ve Leoni marka DC kablo kullan\u0131m\u0131 ger\u00e7ekle\u015fti. Projenin konstr\u00fcksiyon malzemeleri ise isotec\u2019ten temin edildi.<\/p>\n<p style=\"color: #0a0a0a;\">Asunim T\u00fcrkiye\u2019nin, Kayseri\u2019de 10 MW, T\u00fcrkiye\u2019nin farkl\u0131 b\u00f6lgelerinde ise 52 MW kuruluma devam eden projesi\u00a0mevcuttur.<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. G\u00fcne\u015f Enerjisi firmas\u0131 Asunim T\u00fcrkiye taraf\u0131ndan Kayseri\u2019de kurulumu ger\u00e7ekle\u015ftirilen, 6.5 MWp g\u00fcc\u00fcndeki Sar\u0131o\u011flan GES projesi devreye al\u0131nd\u0131. Kayseri\u2019nin Sar\u0131o\u011flan il\u00e7esinde yer alan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":61808,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[63,67,1009,2698,165,2326,227,13,2569,23133,22975,4269],"views":953,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/61807"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=61807"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/61807\/revisions"}],"predecessor-version":[{"id":61809,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/61807\/revisions\/61809"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/61808"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=61807"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=61807"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=61807"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}