{"id":61718,"date":"2017-02-08T19:06:54","date_gmt":"2017-02-08T16:06:54","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=61718"},"modified":"2017-02-08T19:09:00","modified_gmt":"2017-02-08T16:09:00","slug":"ge-ve-gama-enerjiden-turkiyenin-ilk-dijital-enerji-santrali","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ge-ve-gama-enerjiden-turkiyenin-ilk-dijital-enerji-santrali\/","title":{"rendered":"(Turkish) GE ve GAMA Enerji\u2019den T\u00fcrkiye\u2019nin \u0130lk Dijital Enerji Santrali!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/61718\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>GE ve GAMA Enerji, T\u00fcrkiye\u2019nin ilk <a href=\"https:\/\/powergen.gepower.com\/products\/power-plants\/digital-power-plant.html\"><span style=\"color: #0976b4;\">dijital enerji santrali<\/span><\/a> i\u00e7in anla\u015fma imzalad\u0131. Bu anla\u015fma ile T\u00fcrkiye\u2019de ilk defa bir enerji santralinde verimlili\u011fi ve \u00fcretkenli\u011fi art\u0131ran end\u00fcstriyel bulut yaz\u0131l\u0131m uygulamalar\u0131 kullan\u0131lm\u0131\u015f olacak. GE, GAMA Enerji\u2019nin K\u0131r\u0131kkale ilindeki 840 MW kurulu g\u00fcc\u00fcndeki \u0130\u00e7 Anadolu Do\u011falgaz Kombine \u00c7evrim Santralinde GE\u2019nin end\u00fcstriyel internet i\u015fletim sistemi <a href=\"http:\/\/www.ge.com\/digital\/predix\"><span style=\"color: #0976b4;\">Predix<\/span><\/a>\u2122\u2019in geli\u015fmi\u015f dijital \u00e7\u00f6z\u00fcmleri olan <a href=\"http:\/\/www.ge.com\/digital\/products\/asset-performance-management-for-power\"><span style=\"color: #0976b4;\">Varl\u0131k Performans Y\u00f6netimi<\/span><\/a> (APM) ve <a href=\"http:\/\/www.ge.com\/digital\/products\/operations-optimization-for-power\"><span style=\"color: #0976b4;\">Operasyon Optimizasyonu<\/span><\/a> (OO) kurulumu ger\u00e7ekle\u015ftirecek. S\u00f6z konusu dijital \u00e7\u00f6z\u00fcmlerin 2017\u2019nin ilk \u00e7eyre\u011finde devreye al\u0131nmas\u0131 planlan\u0131yor.<\/strong><\/p>\n<p><strong>GAMA Enerji Y\u00f6netim Kurulu \u00dcyesi ve Genel M\u00fcd\u00fcr\u00fc S\u0131tk\u0131 \u015eerifeken,<\/strong> \u201cGE ile i\u015f birli\u011finde T\u00fcrkiye\u2019de ilk dijital enerji santrali d\u00f6n\u00fc\u015f\u00fcm\u00fcn\u00fc ger\u00e7ekle\u015ftirecek \u015firket olmaktan gurur duyuyoruz. GE\u2019nin enerji sekt\u00f6r\u00fcndeki end\u00fcstriyel uzmanl\u0131\u011f\u0131, geli\u015fmi\u015f dijital yetkinlikleri ve 15 y\u0131ll\u0131k i\u015f birli\u011fi tecr\u00fcbemize bakt\u0131\u011f\u0131m\u0131zda, bu yeni \u00e7\u00f6z\u00fcm<img loading=\"lazy\" class=\"alignright size-medium wp-image-61719\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/02\/ge-ve-gama-enerjiden-turkiyenin-ilk-dijital-enerji-santrali-300x200.jpg\" alt=\"ge-ve-gama-enerjiden-turkiyenin-ilk-dijital-enerji-santrali\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/02\/ge-ve-gama-enerjiden-turkiyenin-ilk-dijital-enerji-santrali-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/02\/ge-ve-gama-enerjiden-turkiyenin-ilk-dijital-enerji-santrali-1024x682.jpg 1024w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/02\/ge-ve-gama-enerjiden-turkiyenin-ilk-dijital-enerji-santrali-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/02\/ge-ve-gama-enerjiden-turkiyenin-ilk-dijital-enerji-santrali-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/02\/ge-ve-gama-enerjiden-turkiyenin-ilk-dijital-enerji-santrali.jpg 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>lerin bak\u0131m maliyetlerini d\u00fc\u015f\u00fcrece\u011fine ve santraldeki operasyonel verimlili\u011fi art\u0131raca\u011f\u0131na inan\u0131yoruz\u201d dedi.<\/p>\n<p>Bu anla\u015fma, emre amadelik ve performans garantisi kapsam\u0131nda iki GE 9F.05 gaz t\u00fcrbini ve bir GE D11 buhar t\u00fcrbinine y\u00f6nelik planl\u0131 ve plans\u0131z bak\u0131m hizmetleri sa\u011flamak \u00fczere GE ve GAMA Enerji aras\u0131nda ge\u00e7ti\u011fimiz y\u0131l yap\u0131lm\u0131\u015f olan uzun d\u00f6nemli <a href=\"https:\/\/www.gepower.com\/business-info\/news-press-release\/articles\/press-releases\/2015\/03\/ge-supports-gama-enerjis-asset-and-operational-value-at-kirikkale-power-plant-in-turkey.html\"><span style=\"color: #0976b4;\">s\u00f6zle\u015fmeye<\/span><\/a> dayan\u0131yor. Bu hizmetler, dijital \u00e7\u00f6z\u00fcmlerle bir araya gelerek, bak\u0131m planlamalar\u0131n\u0131n verimli ve g\u00fcvenilir bir bi\u00e7imde yap\u0131labilmesi amac\u0131yla, santral operat\u00f6rlerine ar\u0131zalar\u0131 daha ortaya \u00e7\u0131kmadan \u00f6ng\u00f6rmek ve tan\u0131lamak i\u00e7in daha fazla i\u00e7g\u00f6r\u00fc sa\u011flayacak. B\u00f6ylelikle, bu \u00e7\u00f6z\u00fcmler, hem emre amadelik hem de santraldeki operasyonlardan istikrarl\u0131 gelir sa\u011flanmas\u0131na olanak veriyor. GE, 15 y\u0131ll\u0131k anla\u015fman\u0131n bir par\u00e7as\u0131 olarak performans\u0131n artt\u0131r\u0131lmas\u0131 ve bak\u0131m aral\u0131klar\u0131n\u0131n uzat\u0131lmas\u0131 i\u00e7in \u00f6zelle\u015ftirilmi\u015f santral \u00e7\u00f6z\u00fcmleri aras\u0131nda yer alan <a href=\"https:\/\/powergen.gepower.com\/services\/fleet360-total-power-plant-solutions.html\"><span style=\"color: #0976b4;\">Fleet360* platformunu<\/span><\/a> devreye al\u0131yor.<\/p>\n<p>Enerji santrallerindeki plans\u0131z bak\u0131mlardan kaynaklanan duru\u015flar\u0131n, santral kapasitesinin y\u00fczde 3-8\u2019ine kar\u015f\u0131l\u0131k geldi\u011fini belirten <strong>GE Enerji Servisleri Do\u011fu Avrupa ve T\u00fcrkiye Genel M\u00fcd\u00fcr\u00fc Murat Demirel<\/strong>, \u201cGE Varl\u0131k Performans Y\u00f6netimi \u00e7\u00f6z\u00fcm\u00fc, uyguland\u0131\u011f\u0131 santrallerde plans\u0131z bak\u0131mlardan kaynaklanan duru\u015flar\u0131 \u00f6nceden tespit ederek \u00f6nemli verimlilik ve \u00fcretim art\u0131\u015f\u0131 yaratt\u0131. Bu \u00e7\u00f6z\u00fcmlerin, plans\u0131z duru\u015flar\u0131n erken tespitiyle y\u0131lda 3 milyon dolara varan tasarruf sa\u011flayaca\u011f\u0131n\u0131 \u00f6ng\u00f6r\u00fcyoruz\u201d diye konu\u015ftu.<\/p>\n<p>GAMA Enerji\u2019nin santralinde hayata ge\u00e7irilmesi planlanan Varl\u0131k Performans Y\u00f6netimi ve Operasyon Optimizasyonu yaz\u0131l\u0131m uygulamalar\u0131, geli\u015fmi\u015f \u00f6ng\u00f6r\u00fclebilirlik sayesinde y\u00fcksek g\u00fcvenilirlik ve emre amedelik, do\u011fru performans izleme ve tahmin becerisi, santral yetkinli\u011finin daha iyi izlenmesi yoluyla planlama optimizasyonu ve daha verimli santral planlama i\u00e7in daha d\u00fc\u015f\u00fck \u00fcretim maliyetleri ve varl\u0131k \u00fcretimi tahmin yetkinli\u011fi gibi \u00e7e\u015fitli operasyonel faydalar sunuyor.<\/p>\n<p>Do\u011falgaz T\u00fcrkiye\u2019de elektrik \u00fcretimi a\u00e7\u0131s\u0131ndan y\u00fczde 33\u2019l\u00fck pay\u0131 ile ilk s\u0131rada yer al\u0131yor. Murat Demirel, End\u00fcstriyel \u0130nternet \u00e7\u00f6z\u00fcmlerinin s\u0131n\u0131rl\u0131 do\u011fal gaz kaynaklar\u0131 ile ba\u011flant\u0131l\u0131 olarak tesisteki operasyonel verimlili\u011fi art\u0131rmaya yard\u0131m edebilece\u011fini belirtti.<\/p>\n<p><strong>Elektrik end\u00fcstrisindeki dijital d\u00f6n\u00fc\u015f\u00fcmden 1,3 trilyon dolarl\u0131k de\u011fer <\/strong><\/p>\n<p>D\u00fcnyada elektrik \u00fcretim sekt\u00f6r\u00fc dijital d\u00f6n\u00fc\u015f\u00fcm ile daha verimli bir gelece\u011fe haz\u0131rlan\u0131yor. 2016 y\u0131l\u0131ndaki D\u00fcnya Ekonomik Forumu\u2019na g\u00f6re 2025 y\u0131l\u0131na kadar elektrik alan\u0131ndaki bu d\u00f6n\u00fc\u015f\u00fcm\u00fcn 1,3 trilyon dolarl\u0131k f\u0131rsat yaratmas\u0131 bekleniyor. Enerji santrallerinin servis platformlar\u0131yla donat\u0131lmas\u0131 ve Bulut Bili\u015fim ve End\u00fcstriyel \u0130nternet olanaklar\u0131n\u0131n kullan\u0131lmas\u0131; daha verimli enerji \u00fcretimi ve m\u00fc\u015fterilere kesintisiz ula\u015fmas\u0131 a\u00e7\u0131s\u0131ndan \u00f6nemli avantajlar sunuyor.<\/p>\n<p>GE\u2019nin end\u00fcstriyel internet platformu Predix\u2122, bir\u00e7ok alanda oldu\u011fu gibi enerji alan\u0131ndaki \u00e7\u00f6z\u00fcmleri ile de dijital d\u00f6n\u00fc\u015f\u00fcm\u00fc destekliyor. Predix\u2122 \u015fimdiden 19 bin uygulama geli\u015ftiriciye ula\u015farak dijitalle\u015fme i\u00e7in bir ekosistem kurdu. Bununla birlikte m\u00fc\u015fterilerin ihtiya\u00e7lar\u0131 ve GE\u2019nin i\u015f birlikleri ile birlikte bu ekosistem daha da geni\u015fliyor.<\/p>\n<p>GAMA Enerji\u2019nin 840 MW kurulu g\u00fcc\u00fcndeki \u0130\u00e7 Anadolu Do\u011falgaz Kombine \u00c7evrim Santrali, tek ba\u015f\u0131na T\u00fcrkiye\u2019de t\u00fcketilen elektri\u011fin y\u00fczde 2,5\u2019ini, ba\u015fkent Ankara\u2019da t\u00fcketilen elektri\u011fin ise y\u00fczde 50\u2019sinden fazlas\u0131n\u0131 kar\u015f\u0131l\u0131yor.<\/p>\n<p>GE, 15 y\u0131ldan beri kombine \u00e7evrim santrallerinden yenilenebilir enerji projelerine kadar bir\u00e7ok projede, hem yap\u0131m hem de yat\u0131r\u0131mlar i\u00e7in GAMA Holding ile i\u015f birli\u011fi yap\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.GE ve GAMA Enerji, T\u00fcrkiye\u2019nin ilk dijital enerji santrali i\u00e7in anla\u015fma imzalad\u0131. Bu anla\u015fma ile T\u00fcrkiye\u2019de ilk defa bir enerji santralinde verimlili\u011fi ve [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":61719,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53],"tags":[33119,31910,33116,3761,63,67,1009,2698,2838,33120,165,7536,2422,3013,33118,33123,33121,33117,33122,105],"views":1396,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/61718"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=61718"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/61718\/revisions"}],"predecessor-version":[{"id":61720,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/61718\/revisions\/61720"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/61719"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=61718"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=61718"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=61718"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}