{"id":61607,"date":"2017-02-04T13:11:18","date_gmt":"2017-02-04T10:11:18","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=61607"},"modified":"2017-02-04T13:11:18","modified_gmt":"2017-02-04T10:11:18","slug":"ocak-ayinda-1039-mw-kurulu-kapasiteye-ilave-10-santral-devreye-alindi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ocak-ayinda-1039-mw-kurulu-kapasiteye-ilave-10-santral-devreye-alindi\/","title":{"rendered":"(Turkish) Ocak Ay\u0131nda 103,9 MW Kurulu Kapasiteye \u0130lave 10 Santral Devreye Al\u0131nd\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/61607\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #0a0a0a;\"><strong>Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 verilerine g\u00f6re, T\u00fcrkiye\u2019nin elektrikteki toplam kurulu g\u00fcc\u00fc 78 bin 601 megavata y\u00fckselmi\u015ftir.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/10\/cayirhan-santrali-komur-rezerv-ve-enerji-alanlarinda-ozellestirme.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-57843\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/10\/cayirhan-santrali-komur-rezerv-ve-enerji-alanlarinda-ozellestirme-300x196.jpg\" alt=\"cayirhan-santrali-komur-rezerv-ve-enerji-alanlarinda-ozellestirme\" width=\"300\" height=\"196\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/10\/cayirhan-santrali-komur-rezerv-ve-enerji-alanlarinda-ozellestirme-300x196.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/10\/cayirhan-santrali-komur-rezerv-ve-enerji-alanlarinda-ozellestirme-500x327.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/10\/cayirhan-santrali-komur-rezerv-ve-enerji-alanlarinda-ozellestirme-76x50.jpg 76w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/10\/cayirhan-santrali-komur-rezerv-ve-enerji-alanlarinda-ozellestirme.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><\/p>\n<p style=\"color: #0a0a0a;\">Bu y\u0131l ocak ay\u0131nda devreye al\u0131nan 103,9 megavat\u0131n 50 megavat\u0131n\u0131 Karab\u00fck\u2019te devreye al\u0131nan k\u00f6m\u00fcr ve kojenerasyon santrali olu\u015fturdu. Bu ayda Bal\u0131kesir\u2019de 2 megavat ve Ayd\u0131n\u2019da da 1 megavatl\u0131k do\u011falgaz santrali faaliyete al\u0131nd\u0131. B\u00f6ylece y\u0131l\u0131n ilk ay\u0131nda i\u015fletmeye giren kapasitenin y\u00fczde 51\u2019i termik santraller\u00a0taraf\u0131ndan meydana gelmi\u015ftir.<\/p>\n<p style=\"color: #0a0a0a;\">Ocak ay\u0131nda i\u015fletmeye giren toplam kapasitenin y\u00fczde 35,7\u2019si ise r\u00fczgar santrallar\u0131ndan olu\u015ftu. Ocakta, Manisa, Afyonkarahisar, K\u0131rklareli ve Bal\u0131kesir\u2019de 37,09 megavat kurulu g\u00fcce sahip 4 r\u00fczgar santral\u0131 devreye girdi. Ocak ay\u0131nda faaliyete ge\u00e7irilen kapasitenin y\u00fczde 13,3\u2019\u00fcn\u00fc ise hidroelektrik santrallari olu\u015fturdu. Bu d\u00f6nemde, Zonguldak, Giresun ve Rize\u2019de 13,8 megavat kapasiteye sahip 3 hidroelektrik santral\u0131 devreye al\u0131nm\u0131\u015ft\u0131r.<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 verilerine g\u00f6re, T\u00fcrkiye\u2019nin elektrikteki toplam kurulu g\u00fcc\u00fc 78 bin 601 megavata y\u00fckselmi\u015ftir. Bu y\u0131l ocak ay\u0131nda devreye [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":57843,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,51,53,47,24649,50],"tags":[4725,68,61,19638,1451,160,2873,63,67,1009,2698,165,1972,312,33051,19497],"views":986,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/61607"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=61607"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/61607\/revisions"}],"predecessor-version":[{"id":61608,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/61607\/revisions\/61608"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/57843"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=61607"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=61607"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=61607"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}