{"id":61554,"date":"2017-02-03T12:49:17","date_gmt":"2017-02-03T09:49:17","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=61554"},"modified":"2017-02-03T13:10:52","modified_gmt":"2017-02-03T10:10:52","slug":"aedas-5-yil-icerisinde-986-milyon-liralik-yatirim-gerceklestirecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aedas-5-yil-icerisinde-986-milyon-liralik-yatirim-gerceklestirecek\/","title":{"rendered":"(Turkish) AEDA\u015e, 5 Y\u0131l \u0130\u00e7erisinde 986 Milyon Liral\u0131k Yat\u0131r\u0131m Ger\u00e7ekle\u015ftirecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/61554\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>2016-2020 d\u00f6neminde Antalya, Isparta ve Burdur\u2019a 986 milyon liral\u0131k yat\u0131r\u0131m yapacak olan AEDA\u015e, b\u00f6lgede yat\u0131r\u0131m elinin de\u011fmedi\u011fi tek bir nokta bile b\u0131rakmayacakt\u0131r. Bu y\u0131l b\u00f6lgeye 183 milyon liral\u0131k yat\u0131r\u0131m yapmay\u0131 planlayan AEDA\u015e\u2019\u0131n \u00e7al\u0131\u015fmalar\u0131n\u0131n sonucu rakamlarda net olarak kendini g\u00f6stermektedir. B\u00f6lgede 2013 y\u0131l\u0131nda 96 binler seviyesinde bulunan toplam ar\u0131za say\u0131s\u0131 y\u00fczde 54\u2019l\u00fck bir d\u00fc\u015f\u00fc\u015fle 2016 sonunda 44 bine kadar inmi\u015f durumdad\u0131r.<\/strong><\/p>\n<p>2016 y\u0131l\u0131n\u0131 176 milyon liral\u0131k yat\u0131r\u0131mla tamamlayan Akdeniz Elektrik Da\u011f\u0131t\u0131m A.\u015e. (AEDA\u015e), bu y\u0131l b\u00f6lgenin elektrik da\u011f\u0131t\u0131m sistemine 183 milyon liral\u0131k daha yat\u0131r\u0131m yapacak. Antalya, Isparta ve Burdur\u2019da 37 bin 333 kilo<img loading=\"lazy\" class=\"alignright size-medium wp-image-61555\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/02\/aedas-5-yil-icerisinde-986-milyon-liralik-yatirim-gerceklestirecek-300x248.jpg\" alt=\"aedas-5-yil-icerisinde-986-milyon-liralik-yatirim-gerceklestirecek\" width=\"300\" height=\"248\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/02\/aedas-5-yil-icerisinde-986-milyon-liralik-yatirim-gerceklestirecek-300x248.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/02\/aedas-5-yil-icerisinde-986-milyon-liralik-yatirim-gerceklestirecek-483x400.jpg 483w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/02\/aedas-5-yil-icerisinde-986-milyon-liralik-yatirim-gerceklestirecek-60x50.jpg 60w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/02\/aedas-5-yil-icerisinde-986-milyon-liralik-yatirim-gerceklestirecek.jpg 900w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>metrekarelik alanda 1,7 milyon aboneye elektrik da\u011f\u0131t\u0131m hizmeti veren AEDA\u015e\u2019\u0131n hedefi 2016-2020 y\u0131llar\u0131n\u0131 kapsayan 5 y\u0131ll\u0131k d\u00f6nemde toplam yat\u0131r\u0131m tutar\u0131n\u0131 986 milyon liraya \u00e7\u0131karmak.<\/p>\n<p>M\u00fc\u015fteri memnuniyetini her \u015feyin \u00fcst\u00fcnde tutan ve abonelerine elektri\u011fi h\u0131zl\u0131, kesintisiz ve en verimli \u015fekilde ula\u015ft\u0131rmay\u0131 temel ilke olarak benimseyen AEDA\u015e, gece g\u00fcnd\u00fcz demeden \u00e7al\u0131\u015fmalar\u0131na devam ediyor. AEDA\u015e 2016\u2019da \u00f6zellikle trafo kapasite art\u0131\u015f\u0131, hatlar\u0131 yer alt\u0131na alma ve ayd\u0131nlatma tesislerinin kurulmas\u0131 \u00e7al\u0131\u015fmalar\u0131na \u00f6ncelik verdi.<\/p>\n<p><strong>ANTALYA\u2019YA 5 B\u0130N AYDINLATMA D\u0130RE\u011e\u0130 D\u0130K\u0130LD\u0130<\/strong><\/p>\n<p>2016 y\u0131l\u0131nda Antalya\u2019ya yakla\u015f\u0131k 1.000 km elektrik hatt\u0131 \u00e7eken AEDA\u015e, b\u00f6lgedeki n\u00fcfus ve elektrik t\u00fcketimindeki art\u0131\u015f\u0131 da \u00f6ng\u00f6rerek 285 yeni trafo kurdu. 5 binin \u00fczerinde ayd\u0131nlatma dire\u011fi dikilirken Antalya\u2019n\u0131n 24 saat ya\u015fayan \u015fehir olmas\u0131 y\u00f6n\u00fcndeki \u00e7al\u0131\u015fmalar\u0131na da devam etti. Manavgat, Serik, Alanya ve Gazipa\u015fa\u2019da turizme de katk\u0131 sa\u011flayacak yat\u0131r\u0131mlara imza atan \u015firket, b\u00f6lgesindeki t\u00fcm il\u00e7elere yat\u0131r\u0131m g\u00f6t\u00fcrmeyi hedefliyor.<\/p>\n<p><strong>TOPLAM ARIZA SAYISI Y\u00dcZDE 54 D\u00dc\u015eT\u00dc<\/strong><\/p>\n<p>\u00d6zelle\u015ftirmenin ard\u0131ndan 2013-2016 y\u0131llar\u0131 aras\u0131nda AEDA\u015e\u2019\u0131n b\u00f6lgeye yapt\u0131\u011f\u0131 yat\u0131r\u0131m tutar\u0131 690 milyon liray\u0131 bulmu\u015f durumda. Nitekim 2013\u2019ten bu yana yap\u0131lan yat\u0131r\u0131mlar\u0131n olumlu sonu\u00e7lar\u0131 rakamlarla da net olarak kendini g\u00f6sterdi. AEDA\u015e\u2019\u0131n sorumluluk b\u00f6lgesindeki ar\u0131za adeti 2013 y\u0131l\u0131nda 96 bin civar\u0131nda iken 2016 sonunda 44 bin seviyesine geriledi. Yani 2013\u2019ten bu yana ar\u0131za adetlerinde y\u00fczde 54\u2019\u00fcn \u00fczerinde bir d\u00fc\u015f\u00fc\u015fe imza at\u0131ld\u0131.<\/p>\n<p>Ar\u0131za say\u0131lar\u0131yla paralel olarak ar\u0131za s\u00fcrelerinde de ciddi oranda azalma ya\u015fand\u0131. Akdeniz B\u00f6lgesi\u2019nde 2015 sonunda devreye al\u0131nan ve \u2018Veri Toplama ve Uzaktan Kumanda Kontrol\u00fc\u2019 olarak ifade edilen SCADA sistemine 2016 sonu itibar\u0131yla 162 adet orta gerilim da\u011f\u0131t\u0131m merkezi dahil edildi. SCADA sisteminin oldu\u011fu yerlerde uzaktan m\u00fcdahale ile kesinti s\u00fcrelerinde y\u00fczde 90 oran\u0131nda azalma sa\u011flan\u0131rken; uzaktan enerji verilemeyen yerlerde ise lokasyon tespiti sayesinde kesinti s\u00fcreleri y\u00fczde 30 oran\u0131nda azald\u0131.<\/p>\n<p><strong>KES\u0130NT\u0130 VE ARIZLAR ANINDA B\u0130LD\u0130R\u0130L\u0130YOR<\/strong><\/p>\n<p>300 da\u011f\u0131t\u0131m merkezini SCADA\u2019ya dahil etme hedefinde olan AEDA\u015e, b\u00f6lgenin dijital haritas\u0131n\u0131 g\u00f6rmeyi sa\u011flayan Co\u011frafi Bilgi Sistemi Projesi\u2019nde de olduk\u00e7a h\u0131zl\u0131 yol al\u0131yor. 2014\u2019de ba\u015flayan CBS Projesi \u00e7er\u00e7evesinde orta gerilim \u015febeke envanterinin sisteme aktar\u0131m\u0131 tamamlan\u0131rken, g\u00fcncel telefon bilgileri olan yakla\u015f\u0131k 52 bin aboneye planl\u0131 elektrik kesintilerinin yan\u0131 s\u0131ra ar\u0131za bilgisi ve ar\u0131zan\u0131n ne kadar s\u00fcrece\u011fine dair bilgiler g\u00f6nderilmeye ba\u015fland\u0131. Pilot b\u00f6lge olarak Muratpa\u015fa\u2019da ba\u015flayan projenin t\u00fcm b\u00f6lgeye yay\u0131lmas\u0131 ise 2017 hedefleri aras\u0131nda yer al\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.2016-2020 d\u00f6neminde Antalya, Isparta ve Burdur\u2019a 986 milyon liral\u0131k yat\u0131r\u0131m yapacak olan AEDA\u015e, b\u00f6lgede yat\u0131r\u0131m elinin de\u011fmedi\u011fi tek bir nokta bile b\u0131rakmayacakt\u0131r. Bu [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":61555,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[31338,31233,68,1266,61,19638,1451,2873,63,67,1009,2698,165],"views":841,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/61554"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=61554"}],"version-history":[{"count":4,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/61554\/revisions"}],"predecessor-version":[{"id":61559,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/61554\/revisions\/61559"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/61555"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=61554"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=61554"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=61554"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}