{"id":61315,"date":"2017-01-26T09:49:59","date_gmt":"2017-01-26T06:49:59","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=61315"},"modified":"2017-01-26T09:49:59","modified_gmt":"2017-01-26T06:49:59","slug":"zorlu-enerji-tarafindan-bursadaki-santralin-kapasitesi-dusuruldu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/zorlu-enerji-tarafindan-bursadaki-santralin-kapasitesi-dusuruldu\/","title":{"rendered":"(Turkish) Zorlu Enerji Taraf\u0131ndan Bursa\u2019daki Santralin Kapasitesi D\u00fc\u015f\u00fcr\u00fcld\u00fc"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/61315\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #0a0a0a;\"><strong>Zorlu Enerji Elektrik \u00dcretim A\u015e taraf\u0131ndan Bursa Organize Sanayi B\u00f6lgesi\u2019nde bulunan kombine \u00e7evrim do\u011falgaz santralinin kurulu g\u00fcc\u00fcn\u00fcn 90 megavattan 34,3 megavata d\u00fc\u015f\u00fcr\u00fcld\u00fc\u011f\u00fc a\u00e7\u0131kland\u0131.<img loading=\"lazy\" class=\"alignright  wp-image-35585\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/zorlu-enerji-239878932237983-300x155.jpg\" alt=\"zorlu-enerji-239878932237983\" width=\"300\" height=\"179\" \/><\/strong><span id=\"more-87824\"><\/span><\/p>\n<p style=\"color: #0a0a0a;\">Zorlu Enerji\u2019nin Kamuyu Ayd\u0131nlatma Platformu\u2019ndaki (KAP) a\u00e7\u0131klamas\u0131nda, \u015firketin Bursa Organize Sanayi B\u00f6lgesi\u2019nde bulunan kombine \u00e7evrim do\u011falgaz santralinin \u00fcretim lisans\u0131n\u0131n santralin ekonomik \u00f6mr\u00fcn\u00fcn dolmas\u0131 ve do\u011falgaz maliyetlerinde ya\u015fanan art\u0131\u015flar sonucu tadil edildi\u011fi\u00a0ifade edilmi\u015ftir.<\/p>\n<p><strong>KAP&#8217;a Yap\u0131lan A\u00e7\u0131klama:<\/strong><\/p>\n<p>Zorlu Enerji Elektrik \u00dcretim\u00a0A\u015e\u2019nin Bursa Organize Sanayi B\u00f6lgesi\u2019nde bulunan kombine \u00e7evrim do\u011fal gaz\u00a0santralinin \u00fcretim lisans\u0131 santralin ekonomik \u00f6mr\u00fcn\u00fcn dolmas\u0131 ve do\u011fal gaz\u00a0maliyetlerinde ya\u015fanan art\u0131\u015flar sonucu tadil edilmi\u015f olup, lisansa der\u00e7 edilen\u00a0kurulu g\u00fc\u00e7 90 MWe\u2019den 34,3 MWe\u2019ye d\u00fc\u015f\u00fcr\u00fclm\u00fc\u015ft\u00fcr.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Zorlu Enerji Elektrik \u00dcretim A\u015e taraf\u0131ndan Bursa Organize Sanayi B\u00f6lgesi\u2019nde bulunan kombine \u00e7evrim do\u011falgaz santralinin kurulu g\u00fcc\u00fcn\u00fcn 90 megavattan 34,3 megavata d\u00fc\u015f\u00fcr\u00fcld\u00fc\u011f\u00fc [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":35585,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,51,53],"tags":[9793,7344,63,67,1009,2698,165,344,6710],"views":1008,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/61315"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=61315"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/61315\/revisions"}],"predecessor-version":[{"id":61316,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/61315\/revisions\/61316"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/35585"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=61315"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=61315"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=61315"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}