{"id":61179,"date":"2017-01-23T13:08:37","date_gmt":"2017-01-23T10:08:37","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=61179"},"modified":"2017-01-23T13:08:37","modified_gmt":"2017-01-23T10:08:37","slug":"milli-savunma-bakanligida-kisladaki-elektrigini-gunesten-saglayacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/milli-savunma-bakanligida-kisladaki-elektrigini-gunesten-saglayacak\/","title":{"rendered":"(Turkish) Milli Savunma Bakanl\u0131\u011f\u0131&#8217;da K\u0131\u015fla&#8217;daki Elektri\u011fini G\u00fcne\u015ften Sa\u011flayacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/61179\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Milli Savunma Bakanl\u0131\u011f\u0131 taraf\u0131ndan Ankara&#8217;n\u0131n G\u00f6lba\u015f\u0131 il\u00e7esindeki \u00d6KK T\u00fcmgeneral Dani\u015f Karabelen K\u0131\u015flas\u0131&#8217;n\u0131n elektri\u011fi<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/gunes-santrali-ges-tarlasi-kurmak-istiyorum-peki-nereden-baslamaliyim.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-51895\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/gunes-santrali-ges-tarlasi-kurmak-istiyorum-peki-nereden-baslamaliyim-300x189.jpg\" alt=\"gunes-santrali-ges-tarlasi\" width=\"300\" height=\"189\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/gunes-santrali-ges-tarlasi-kurmak-istiyorum-peki-nereden-baslamaliyim-300x189.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/gunes-santrali-ges-tarlasi-kurmak-istiyorum-peki-nereden-baslamaliyim-500x316.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/gunes-santrali-ges-tarlasi-kurmak-istiyorum-peki-nereden-baslamaliyim-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/gunes-santrali-ges-tarlasi-kurmak-istiyorum-peki-nereden-baslamaliyim.jpg 765w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>nin kurulacak 3.3 MW kapasiteli G\u00fcne\u015f Enerji Santrali&#8217;nden\u00a0kar\u015f\u0131lanaca\u011f\u0131 a\u00e7\u0131kland\u0131.<\/strong><\/p>\n<p><strong>9.750.000 TL<\/strong> bedelli proje ile \u00fcretilen elektrik, MSB K\u0131\u015flas\u0131 i\u00e7erisinde yer alan tesislerin elektrik t\u00fcketimini kar\u015f\u0131layacakt\u0131r.<\/p>\n<p>Santralde, toplamda <strong>12.240 adet<\/strong> \u00e7ok kristalli fotovoltaik panel ve her biri <strong>260 Wp<\/strong> olan <strong>120 adet evirici<\/strong> (invert\u00f6r) ile <strong>2 adet trafo<\/strong> kullan\u0131lacak. B\u00f6ylece proje kapsam\u0131nda toplam 12.240 adet \u00e7ok kristalli fotovoltaik panellerin <strong>60.000 m2\u2019lik<\/strong> arazide d\u00fcz zemine optimum a\u00e7\u0131da sabitlenmesi ile y\u0131lda <strong>3,3 MW\u2019<\/strong>l\u0131k kurulu kapasite ile g\u00fcne\u015f \u0131\u015f\u0131\u011f\u0131ndan yakla\u015f\u0131k olarak 5 milyon kWh enerji \u00fcretilmesi\u00a0hedeflenmektedir.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.enerjigunlugu.net\/icerik\/21451\/milli-savunma-bakanligi-kislada-elektrigini-gunesten-karsilayacak.html#.WIXYUfCLRdg\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Milli Savunma Bakanl\u0131\u011f\u0131 taraf\u0131ndan Ankara&#8217;n\u0131n G\u00f6lba\u015f\u0131 il\u00e7esindeki \u00d6KK T\u00fcmgeneral Dani\u015f Karabelen K\u0131\u015flas\u0131&#8217;n\u0131n elektri\u011finin kurulacak 3.3 MW kapasiteli G\u00fcne\u015f Enerji Santrali&#8217;nden\u00a0kar\u015f\u0131lanaca\u011f\u0131 a\u00e7\u0131kland\u0131. 9.750.000 TL [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":51895,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[2674,68,63,67,1009,2698,165,2326,31710,32908,227,13,2569,23133,22975,4269,32907,32909],"views":1127,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/61179"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=61179"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/61179\/revisions"}],"predecessor-version":[{"id":61180,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/61179\/revisions\/61180"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/51895"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=61179"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=61179"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=61179"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}