{"id":61087,"date":"2017-01-20T13:58:38","date_gmt":"2017-01-20T10:58:38","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=61087"},"modified":"2017-01-20T13:59:13","modified_gmt":"2017-01-20T10:59:13","slug":"suudilerden-konyadaki-dunyanin-en-buyuk-ges-ihalesine-hazirlik","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/suudilerden-konyadaki-dunyanin-en-buyuk-ges-ihalesine-hazirlik\/","title":{"rendered":"(Turkish) Suudiler&#8217;den Konya\u2019daki D\u00fcnyan\u0131n En B\u00fcy\u00fck GES \u0130halesine Haz\u0131rl\u0131k"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/61087\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #0a0a0a;\"><strong>Konya\u2019n\u0131n Karap\u0131nar il\u00e7esinde kurulacak d\u00fcnyan\u0131n en b\u00fcy\u00fck \u2018g\u00fcne\u015f tarlas\u0131\u2019na Suudiler talip oldu. K\u0131r\u0131kkale\u2019de 950 megavatl\u0131k kombine do\u011falgaz \u00e7evrim santrali yat\u0131r\u0131m\u0131na imza atan Suudi Arabistan merkezli ACWA Power Ba\u015fkan\u0131 ve CEO\u2019su Paddy Padmanathan taraf\u0131ndan T\u00fcrkiye\u2019ye gelecek d\u00f6nemde yapacaklar\u0131 yat\u0131r\u0131mlar\u0131n g\u00fcne\u015f, r\u00fczgar ve jeotermal alan\u0131nda olaca\u011f\u0131 ifade edildi.<\/strong><\/p>\n<p style=\"color: #0a0a0a;\">T\u00fcrkiye\u2019nin <strong>21 \u015eubat\u2019ta<\/strong> yap\u0131lacak Konya Karap\u0131nar\u2019da ger\u00e7ekle\u015ftirece\u011fi bin megavat kapasiteli d\u00fcnyan\u0131n en b\u00fcy\u00fck g\u00fcne\u015f enerjisi santrali ihalesini an<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/02\/gunes-enerjisi-konya-bolgesi-ges-yarismasi-teias-2015-3.paket_.jpg\"><img loading=\"lazy\" class=\"alignleft  wp-image-36022\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/02\/gunes-enerjisi-konya-bolgesi-ges-yarismasi-teias-2015-3.paket_-300x138.jpg\" alt=\"gunes-enerjisi-konya-bolgesi-ges-yarismasi-teias\" width=\"300\" height=\"199\" \/><\/a>\u0131msatan Paddy Padmanathan, s\u00f6zlerini \u015f\u00f6yle s\u00fcrd\u00fcrd\u00fc. \u201cHedefimiz, T\u00fcrkiye\u2019deki \u00e7e\u015fitli kaynaklardan bir kapasite olu\u015fturmakt\u0131r. Bu y\u00fczden g\u00fcne\u015f enerjisindeki 1.000 megavatl\u0131k bu proje \u00fczerinde \u00e7ok dikkatli bir \u015fekilde \u00e7al\u0131\u015fmaktay\u0131z. S\u00f6z konusu projedeki yerlilik \u015fart\u0131n\u0131n \u00e7ok \u00f6nemli ve do\u011fru oldu\u011funu d\u00fc\u015f\u00fcnmekteyim. Bu \u015fekilde \u00fclkeye daha \u00e7ok ekonomik de\u011fer kat\u0131labilmektedir.\u201d<\/p>\n<p style=\"color: #0a0a0a;\">Ayr\u0131ca, r\u00fczgarda <strong>350-400 mw<\/strong>\u00a0civar\u0131nda bir kapasite i\u00e7in lisans beklediklerini belirten\u00a0Padmanathan, \u201cBu lisans s\u00fcreciyle ilgili bir erteleme s\u00f6z konusu oldu ama \u00f6nemli de\u011fildir. Bu lisanslar\u0131 al\u0131p tamamlad\u0131ktan sonra r\u00fczgar enerjisinde kapasitemize yenilerini eklemeyi s\u00fcrd\u00fcrece\u011fiz. Jeotermal enerjide ise 50 ile 200 mw\u00a0aras\u0131nda yat\u0131r\u0131m i\u00e7in f\u0131rsatlar\u0131 de\u011ferlendirme a\u015famas\u0131nday\u0131z\u201d\u00a0a\u00e7\u0131klamalar\u0131na yer verdi.<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Konya\u2019n\u0131n Karap\u0131nar il\u00e7esinde kurulacak d\u00fcnyan\u0131n en b\u00fcy\u00fck \u2018g\u00fcne\u015f tarlas\u0131\u2019na Suudiler talip oldu. K\u0131r\u0131kkale\u2019de 950 megavatl\u0131k kombine do\u011falgaz \u00e7evrim santrali yat\u0131r\u0131m\u0131na imza atan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":36022,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[20782,63,67,1009,2698,165,2326,227,13,2569,23133,22975,4269,56,10835,16,1463],"views":1136,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/61087"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=61087"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/61087\/revisions"}],"predecessor-version":[{"id":61089,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/61087\/revisions\/61089"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/36022"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=61087"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=61087"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=61087"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}