{"id":60991,"date":"2017-01-16T17:30:45","date_gmt":"2017-01-16T14:30:45","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=60991"},"modified":"2017-01-16T17:30:45","modified_gmt":"2017-01-16T14:30:45","slug":"elazig-ve-tuncelide-copler-enerjiye-donusturulecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/elazig-ve-tuncelide-copler-enerjiye-donusturulecek\/","title":{"rendered":"(Turkish) Elaz\u0131\u011f ve Tunceli\u2019de \u00c7\u00f6pler Enerjiye D\u00f6n\u00fc\u015ft\u00fcr\u00fclecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/60991\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #0a0a0a;\"><strong>Elaz\u0131\u011f Belediyesi taraf\u0131ndan \u00f6nemli bir \u00e7evresel yat\u0131r\u0131ma imza at\u0131larak \u00e7\u00f6pler enerjiye d\u00f6n\u00fc\u015ft\u00fcr\u00fclmektedir.\u00a0132 hektar y\u00fcz \u00f6l\u00e7\u00fcm\u00fcne sahip Kat\u0131 At\u0131k D\u00fczenli Depolama Sahas\u0131\u2019nda Elektrik \u00dcretim Santrali kurularak\u00a0\u015fehrin d\u0131\u015f\u0131nda yer alan, kat\u0131 at\u0131k depolama sahas\u0131nda toplanan \u015fehrin \u00e7\u00f6pleri enerjiye d\u00f6n\u00fc\u015ft\u00fcr\u00fclmektedir.<\/strong><\/p>\n<p style=\"color: #0a0a0a;\">Yap-i\u015flet-devret modeliyle kurulan \u00e7\u00f6pten elektrik \u00fcretim santralinde, ciddi bir \u00e7evresel kirlili\u011fe neden olan \u00e7\u00f6<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/06\/elaziga-10-bin-konutun-ihtiyacini-karsilayacak-copten-elektrik-uretim-tesisi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-53704\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/06\/elaziga-10-bin-konutun-ihtiyacini-karsilayacak-copten-elektrik-uretim-tesisi-300x200.jpg\" alt=\"copten-elektrik-uretim-tesisi\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/06\/elaziga-10-bin-konutun-ihtiyacini-karsilayacak-copten-elektrik-uretim-tesisi-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/06\/elaziga-10-bin-konutun-ihtiyacini-karsilayacak-copten-elektrik-uretim-tesisi-1024x682.jpg 1024w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/06\/elaziga-10-bin-konutun-ihtiyacini-karsilayacak-copten-elektrik-uretim-tesisi-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/06\/elaziga-10-bin-konutun-ihtiyacini-karsilayacak-copten-elektrik-uretim-tesisi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/06\/elaziga-10-bin-konutun-ihtiyacini-karsilayacak-copten-elektrik-uretim-tesisi.jpg 1068w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>pler, d\u00fczenli depolama alanlar\u0131na aktar\u0131larak, enerji \u00fcretimi sa\u011flan\u0131yor. Elaz\u0131\u011f Belediyesi projeyle T\u00fcrkiye\u2019de emsallerine\u00a0oranla bir rekora imza atarak, 20 y\u0131l s\u00fcresince \u00fcretilecek enerjiden y\u00fczde 35 kazan\u0131m\u0131n\u0131n yan\u0131 s\u0131ra kira bedeli de alacakt\u0131r. Ayr\u0131ca di\u011fer \u015fehirlerde yap\u0131lan ihalelerden farkl\u0131 olarak mevcut sahan\u0131n rehabilitasyonu ve tesisin i\u015fletim bedeli de ilgili firma taraf\u0131ndan kar\u015f\u0131lanmaktad\u0131r. Tesiste \u015fu an 10 bin konutun elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131layacak enerji \u00fcretimi ger\u00e7ekle\u015ftirilmektedir.<\/p>\n<p style=\"color: #0a0a0a;\">Tunceli\u2019nin Pertek, Hozat ve \u00c7emi\u015fgezek il\u00e7elerinin de \u00e7\u00f6pleri, Elaz\u0131\u011f Belediyesi Kat\u0131 At\u0131k tesisine nakledilerek, enerjiye d\u00f6n\u00fc\u015ft\u00fcr\u00fclecektir. \u0130lk etapta Pertek Belediyesi ile protokol ger\u00e7ekle\u015ftirilmi\u015ftir. Protokol imza t\u00f6reninde konu\u015fan Elaz\u0131\u011f Belediye Ba\u015fkan\u0131 M\u00fccahit Yan\u0131lmaz, \u00e7evresel yat\u0131r\u0131mlar a\u00e7\u0131s\u0131ndan \u00f6nemli bir protokole imza att\u0131klar\u0131n\u0131 belirterek, \u201c\u00c7emi\u015fgezek, Hozat ve Pertek il\u00e7elerinin de kat\u0131 at\u0131klar\u0131n\u0131 \u00c7\u00f6teli Kat\u0131 At\u0131k Toplama ve Bertaraf Tesisi\u2019nde enerjiye d\u00f6n\u00fc\u015ft\u00fcrece\u011fiz. Biz hem Elaz\u0131\u011f\u2019da hem de yak\u0131n \u00e7evremizde, \u00e7evreci bir belediyecilik anlay\u0131\u015f\u0131yla \u00e7al\u0131\u015fmaktay\u0131z.&#8221; ifadelerine yer vermi\u015ftir.<\/p>\n<p style=\"color: #0a0a0a;\">Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2017\/01\/16\/elazig-tuncelinin-copleri-enerjiye-donusturelecek\/\" target=\"_blank\" rel=\"nofollow\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Elaz\u0131\u011f Belediyesi taraf\u0131ndan \u00f6nemli bir \u00e7evresel yat\u0131r\u0131ma imza at\u0131larak \u00e7\u00f6pler enerjiye d\u00f6n\u00fc\u015ft\u00fcr\u00fclmektedir.\u00a0132 hektar y\u00fcz \u00f6l\u00e7\u00fcm\u00fcne sahip Kat\u0131 At\u0131k D\u00fczenli Depolama Sahas\u0131\u2019nda Elektrik [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":53704,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,53],"tags":[32830,32831,2880,2860,4249,32832,63,67,1009,2698,165,16449],"views":2022,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/60991"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=60991"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/60991\/revisions"}],"predecessor-version":[{"id":60992,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/60991\/revisions\/60992"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/53704"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=60991"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=60991"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=60991"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}