{"id":60779,"date":"2017-01-09T23:08:14","date_gmt":"2017-01-09T20:08:14","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=60779"},"modified":"2017-01-09T23:08:14","modified_gmt":"2017-01-09T20:08:14","slug":"abd-komur-kullaniminda-dususunu-surduruyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/abd-komur-kullaniminda-dususunu-surduruyor\/","title":{"rendered":"(Turkish) ABD K\u00f6m\u00fcr Kullan\u0131m\u0131nda D\u00fc\u015f\u00fc\u015f\u00fcn\u00fc S\u00fcrd\u00fcr\u00fcyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/60779\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Amerikan Enerji Enformasyon Ajans\u0131 (EIA) taraf\u0131ndan yay\u0131nlanan\u00a0k\u0131sa vadeli enerji g\u00f6r\u00fcn\u00fcm\u00fc raporuna g\u00f6re, ABD&#8217;de 2017 y\u0131l\u0131nda elek<img loading=\"lazy\" class=\"alignleft size-medium wp-image-53660\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/06\/yerli-komur-santrallerinde-risk-analizi-ve-tesvik-mekanizmalari-calistayi-300x199.jpg\" alt=\"yerli-komur-santralleri\" width=\"300\" height=\"199\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/06\/yerli-komur-santrallerinde-risk-analizi-ve-tesvik-mekanizmalari-calistayi-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/06\/yerli-komur-santrallerinde-risk-analizi-ve-tesvik-mekanizmalari-calistayi-500x332.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/06\/yerli-komur-santrallerinde-risk-analizi-ve-tesvik-mekanizmalari-calistayi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/06\/yerli-komur-santrallerinde-risk-analizi-ve-tesvik-mekanizmalari-calistayi.jpg 940w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>trik \u00fcretiminde k\u00f6m\u00fcr\u00fcn pay\u0131 y\u00fczde 30.4 olacakt\u0131r. Elektrik \u00fcretiminde do\u011falgaz\u0131n pay\u0131 ise y\u00fczde 34.1 olarak \u00f6ng\u00f6r\u00fclmektedir.<\/strong><\/p>\n<p>ABD 10 y\u0131l \u00f6ncesine kadar elektri\u011finin yar\u0131s\u0131n\u0131 k\u00f6m\u00fcrden \u00fcretiyordu. Bu ay\u0131n 20&#8217;sinde ba\u015fkanl\u0131\u011f\u0131 devralacak olan Donald Trump&#8217;\u0131n k\u00f6m\u00fcr sekt\u00f6r\u00fcne verdi\u011fi yo\u011fun deste\u011fine ra\u011fmen k\u00f6m\u00fcr yerine do\u011falgaz kullan\u0131m\u0131n\u0131n artt\u0131raca\u011f\u0131\u00a0belirtilmektedir.<\/p>\n<p>EIA verilerine g\u00f6re ise \u00fclkede 2010 y\u0131l\u0131ndan g\u00fcn\u00fcm\u00fcze\u00a050 GW kapasiteye yak\u0131n k\u00f6m\u00fcr yak\u0131tl\u0131 elektrik santrali \u00f6mr\u00fcn\u00fc doldurmu\u015f ve bu kayb\u0131n yeri asla doldurulamayacakt\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Amerikan Enerji Enformasyon Ajans\u0131 (EIA) taraf\u0131ndan yay\u0131nlanan\u00a0k\u0131sa vadeli enerji g\u00f6r\u00fcn\u00fcm\u00fc raporuna g\u00f6re, ABD&#8217;de 2017 y\u0131l\u0131nda elektrik \u00fcretiminde k\u00f6m\u00fcr\u00fcn pay\u0131 y\u00fczde 30.4 olacakt\u0131r. Elektrik [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":53660,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,24649],"tags":[1198,5353,68,63,67,1009,2698,165,1675],"views":773,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/60779"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=60779"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/60779\/revisions"}],"predecessor-version":[{"id":60780,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/60779\/revisions\/60780"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/53660"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=60779"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=60779"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=60779"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}