{"id":60696,"date":"2017-01-06T12:56:42","date_gmt":"2017-01-06T09:56:42","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=60696"},"modified":"2017-01-06T13:08:27","modified_gmt":"2017-01-06T10:08:27","slug":"arevayi-kurtarmak-icin-10-milyar-dolarlik-yatirim-plani","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/arevayi-kurtarmak-icin-10-milyar-dolarlik-yatirim-plani\/","title":{"rendered":"(Turkish) Areva\u2019y\u0131 Kurtarmak \u0130\u00e7in 10 Milyar Dolarl\u0131k Yat\u0131r\u0131m Plan\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/60696\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #0a0a0a;\"><strong>Fransa\u2019n\u0131n n\u00fckleer enerji grubu Areva i\u00e7in devletin \u00f6nc\u00fcl\u00fc\u011f\u00fcnde bir kurtarma program\u0131n\u0131n May\u0131s ay\u0131nda yap\u0131lacak cumhurba\u015fkanl\u0131\u011f\u0131 se\u00e7imini kim kazan\u0131rsa kazans\u0131n, devam edece\u011fi belirtilmektedir. Program\u0131n devlete maliyeti ise 10 <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/03\/nukleer-enerji-sirketi-areva-2015te-2-milyar-38-milyon-avro-zarar-etti.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-51060\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/03\/nukleer-enerji-sirketi-areva-2015te-2-milyar-38-milyon-avro-zarar-etti-300x165.jpg\" alt=\"nukleer-enerji-sirketi-areva\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/03\/nukleer-enerji-sirketi-areva-2015te-2-milyar-38-milyon-avro-zarar-etti-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/03\/nukleer-enerji-sirketi-areva-2015te-2-milyar-38-milyon-avro-zarar-etti-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/03\/nukleer-enerji-sirketi-areva-2015te-2-milyar-38-milyon-avro-zarar-etti-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/03\/nukleer-enerji-sirketi-areva-2015te-2-milyar-38-milyon-avro-zarar-etti.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>milyar euroya kadar \u00e7\u0131kabilecektir.<\/strong><\/p>\n<p style=\"color: #0a0a0a;\">Areva\u2019n\u0131n ciddi mali sorunlar\u0131n yan\u0131 s\u0131ra teknik, denetim ve yasal sorunlar\u0131 da oldu\u011fu bilinmektedir. Ancak \u00fclke elektri\u011finin d\u00f6rtte \u00fc\u00e7\u00fcn\u00fc sa\u011flayan n\u00fckleer enerji sekt\u00f6r\u00fcndeki \u00f6nemi nedeniyle se\u00e7imden sonraki y\u00f6netimin de, \u015fimdiki Cumhurba\u015fkan\u0131 Fran\u00e7ois Hollande\u2019\u0131n haz\u0131rlad\u0131\u011f\u0131 kurtarma program\u0131n\u0131 uygulamaktan ba\u015fka se\u00e7ene\u011fi olmayacakt\u0131r.<\/p>\n<p style=\"color: #0a0a0a;\">Cumhurba\u015fkan\u0131 aday\u0131 olan\u00a0muhafazakar siyaset\u00e7i Fran\u00e7ois Fillon bir yaz\u0131s\u0131nda, \u201c21. y\u00fczy\u0131l\u0131n n\u00fckleer enerjiye ihtiya\u00e7 duyaca\u011f\u0131ndan eminim. Bunun i\u00e7in bu zor d\u00f6nemde sekt\u00f6r\u00fc desteklemeliyiz\u201d\u00a0ifadelerine yer vermi\u015ftir.<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Fransa\u2019n\u0131n n\u00fckleer enerji grubu Areva i\u00e7in devletin \u00f6nc\u00fcl\u00fc\u011f\u00fcnde bir kurtarma program\u0131n\u0131n May\u0131s ay\u0131nda yap\u0131lacak cumhurba\u015fkanl\u0131\u011f\u0131 se\u00e7imini kim kazan\u0131rsa kazans\u0131n, devam edece\u011fi belirtilmektedir. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":51060,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[9032,63,67,1009,2698,165,12654,32701,1346,71,21,25480,23614,2973,32702,32703,1286],"views":712,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/60696"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=60696"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/60696\/revisions"}],"predecessor-version":[{"id":60700,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/60696\/revisions\/60700"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/51060"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=60696"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=60696"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=60696"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}