{"id":60617,"date":"2017-01-03T10:42:27","date_gmt":"2017-01-03T07:42:27","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=60617"},"modified":"2017-01-03T10:42:27","modified_gmt":"2017-01-03T07:42:27","slug":"aliaga-reste-kapasite-akca-enerji-tarafindan-2-katina-cikarildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aliaga-reste-kapasite-akca-enerji-tarafindan-2-katina-cikarildi\/","title":{"rendered":"(Turkish) Alia\u011fa RES\u2019te Kapasite Ak\u00e7a Enerji Taraf\u0131ndan 2 Kat\u0131na \u00c7\u0131kar\u0131ld\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/60617\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\"><strong>Ak\u00e7a Holding b\u00fcnyesinde Tan Elektrik \u00dcretim A.\u015e\u2019ye ait Eyl\u00fcl 2014 tarihinde i\u015fletmeye ge\u00e7mi\u015f olan 9,6 MWe Alia\u011fa RES\/\u0130zmir tesisi kapsam\u0131nda y\u00fcr\u00fct\u00fclen kapasite art\u0131\u015f\u0131 \u00e7al\u0131\u015fmalar\u0131 tamamland\u0131\u011f\u0131\u00a0ifade edildi.<\/strong><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Toplam kapasite iki kat\u0131na \u00e7\u0131kart\u0131larak 19,2 MWe kurulu g\u00fc\u00e7te \u00fcretime ba\u015flanm\u0131\u015ft\u0131r. Ak\u00e7a Enerji\u2019nin \u00e7e\u015fitli jeotermal ve r\u00fczgar <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/01\/aliaga-reste-kapasite-akca-enerji-tarafindan-2-katina-cikarildi.jpg\"><img loading=\"lazy\" class=\"alignleft  wp-image-60618\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/01\/aliaga-reste-kapasite-akca-enerji-tarafindan-2-katina-cikarildi.jpg\" alt=\"aliaga-reste-kapasite-akca-enerji-tarafindan-2-katina-cikarildi\" width=\"270\" height=\"208\" \/><\/a>enerjisi yat\u0131r\u0131mlar\u0131 bulunmaktad\u0131r.<span id=\"more-86734\"><\/span><\/p>\n<p class=\"selectionShareable\"><strong>KAP&#8217;a Yap\u0131lan Bildiri:<\/strong><\/p>\n<p class=\"selectionShareable\">Ba\u011fl\u0131 ortakl\u0131klar\u0131m\u0131zdan Tan\u00a0Elektrik \u00dcretim A.\u015e. taraf\u0131ndan \u0130zmir ili Alia\u011fa il\u00e7esi s\u0131n\u0131rlar\u0131 i\u00e7erisinde yat\u0131r\u0131m\u0131\u00a0tamamlanan ve Eyl\u00fcl 2014 tarihinde i\u015fletmeye ge\u00e7mi\u015f olan E\u00dc\/4270-2\/02549 lisans\u00a0nolu 9,6 MW kurulu g\u00fc\u00e7teki Alia\u011fa R\u00fczgar Enerjisi Santral\u0131 ile ilgili olarak,\u00a09,6 MW kapasite art\u0131\u015f\u0131 yat\u0131r\u0131m\u0131 tamamlanm\u0131\u015f olup, T.C. Enerji ve Tabii\u00a0Kaynaklar Bakanl\u0131\u011f\u0131\u2019n\u0131n 27.12.2016 tarih ve 3387 say\u0131l\u0131 emirleri gere\u011fince\u00a0toplanan Bakanl\u0131k heyeti yapm\u0131\u015f oldu\u011fu inceleme sonucunda tesisin i\u015fletmeye\u00a0a\u00e7\u0131lmas\u0131nda teknik bir sak\u0131nca bulunmad\u0131\u011f\u0131 kan\u0131s\u0131na var\u0131lm\u0131\u015ft\u0131r.<\/p>\n<p class=\"selectionShareable\">31 Aral\u0131k 2016 tarihi itibar\u0131\u00a0ile\u00a0Alia\u011fa R\u00fczgar Enerjisi Santral\u0131 toplam 19,2\u00a0MW kurulu g\u00fc\u00e7\u00a0kapsam\u0131nda elektrik \u00fcretimini s\u00fcrd\u00fcrecektir.<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Ak\u00e7a Holding b\u00fcnyesinde Tan Elektrik \u00dcretim A.\u015e\u2019ye ait Eyl\u00fcl 2014 tarihinde i\u015fletmeye ge\u00e7mi\u015f olan 9,6 MWe Alia\u011fa RES\/\u0130zmir tesisi kapsam\u0131nda y\u00fcr\u00fct\u00fclen kapasite [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":60618,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[16438,32665,32666,32667,63,67,1009,2698,165,32668,474,69,16,231,32669],"views":868,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/60617"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=60617"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/60617\/revisions"}],"predecessor-version":[{"id":60619,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/60617\/revisions\/60619"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/60618"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=60617"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=60617"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=60617"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}