{"id":60579,"date":"2017-01-01T14:51:58","date_gmt":"2017-01-01T11:51:58","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=60579"},"modified":"2017-01-01T14:51:58","modified_gmt":"2017-01-01T11:51:58","slug":"azerbaycan-yeni-bir-dogalgaz-kuyusunu-daha-isletmeye-aldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/azerbaycan-yeni-bir-dogalgaz-kuyusunu-daha-isletmeye-aldi\/","title":{"rendered":"(Turkish) Azerbaycan Yeni Bir Do\u011falgaz Kuyusunu Daha \u0130\u015fletmeye Ald\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/60579\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\"><strong>G\u00fcnl\u00fck olarak 1 milyon metrek\u00fcp do\u011falgaz ve 150 ton kondensat \u00fcretimi ger\u00e7ekle\u015ftirilmesi\u00a0i\u00e7in, Hazar Denizi\u2019nin Azerbaycan\u2019a ait k\u0131<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/10\/dogalgaz-kuyusu-sondaj-enerji-nasil-cikarilir-kuyu-sondaj-drilling-1024x680.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-32393\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/10\/dogalgaz-kuyusu-sondaj-enerji-nasil-cikarilir-kuyu-sondaj-drilling-1024x680-300x199.jpg\" alt=\"dogalgaz-kuyusu-sondaj-enerji-nasil-cikarilir-kuyu-sondaj-drilling-1024x680\" width=\"300\" height=\"199\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/10\/dogalgaz-kuyusu-sondaj-enerji-nasil-cikarilir-kuyu-sondaj-drilling-1024x680-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/10\/dogalgaz-kuyusu-sondaj-enerji-nasil-cikarilir-kuyu-sondaj-drilling-1024x680-500x332.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/10\/dogalgaz-kuyusu-sondaj-enerji-nasil-cikarilir-kuyu-sondaj-drilling-1024x680-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/10\/dogalgaz-kuyusu-sondaj-enerji-nasil-cikarilir-kuyu-sondaj-drilling-1024x680.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>sm\u0131ndaki \u00dcmit do\u011falgaz yata\u011f\u0131nda, bir kuyu daha i\u015fletmeye\u00a0al\u0131nm\u0131\u015ft\u0131r.<\/strong><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Azerbaycan Devlet Petrol \u015eirketi SOCAR taraf\u0131ndan yap\u0131lan a\u00e7\u0131klamada, \u00dcmit yata\u011f\u0131nda 6 bin 352 metre derinli\u011findeki 14 nolu\u00a0kuyudan do\u011falgaz \u00fcretimine ba\u015fland\u0131\u011f\u0131\u00a0ifade edilmi\u015ftir.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Yeni kuyudan ilk a\u015famada g\u00fcnl\u00fck 600 bin metrek\u00fcp do\u011falgaz ile 100 ton kondensat \u00fcretimi yap\u0131lacakt\u0131r. \u0130lerleyen g\u00fcnlerde kuyudan do\u011falgaz \u00fcretimi g\u00fcnl\u00fck 1 milyon metrek\u00fcpe, kondensat \u00fcretimi ise 150 tona ula\u015facakt\u0131r. Azerbaycan\u2019\u0131n ba\u011f\u0131ms\u0131zl\u0131\u011f\u0131n\u0131 kazan\u0131lmas\u0131ndan sonra ke\u015ffedilen ilk do\u011falgaz yata\u011f\u0131 konumunda olan \u00dcmit, Bak\u00fc\u2019n\u00fcn g\u00fcneyinde, k\u0131y\u0131dan 60 kilometre a\u00e7\u0131kta yer almaktad\u0131r.<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. G\u00fcnl\u00fck olarak 1 milyon metrek\u00fcp do\u011falgaz ve 150 ton kondensat \u00fcretimi ger\u00e7ekle\u015ftirilmesi\u00a0i\u00e7in, Hazar Denizi\u2019nin Azerbaycan\u2019a ait k\u0131sm\u0131ndaki \u00dcmit do\u011falgaz yata\u011f\u0131nda, bir kuyu [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":32393,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53],"tags":[3694,92,226,19761,1807,2092,2677,63,67,1009,2698,165,32654],"views":903,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/60579"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=60579"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/60579\/revisions"}],"predecessor-version":[{"id":60580,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/60579\/revisions\/60580"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/32393"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=60579"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=60579"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=60579"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}