{"id":60069,"date":"2016-12-15T13:20:57","date_gmt":"2016-12-15T10:20:57","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=60069"},"modified":"2016-12-15T13:22:28","modified_gmt":"2016-12-15T10:22:28","slug":"zorlu-enerjiden-165-mwlik-jeotermal-projesi-icin-finansman-gorusmeleri","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/zorlu-enerjiden-165-mwlik-jeotermal-projesi-icin-finansman-gorusmeleri\/","title":{"rendered":"(Turkish) Zorlu Enerji&#8217;den 165 MW\u2019l\u0131k Jeotermal Projesi \u0130\u00e7in Finansman G\u00f6r\u00fc\u015fmeleri"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/60069\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong><span style=\"color: #0a0a0a;\">Zorlu Enerji Elektrik \u00dcreti<img loading=\"lazy\" class=\"alignright wp-image-50976 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/zorlu-enerjiye-jeotermal-tesviki-300x192.jpg\" alt=\"zorlu-enerji-jeotermal\" width=\"300\" height=\"192\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/zorlu-enerjiye-jeotermal-tesviki-300x192.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/zorlu-enerjiye-jeotermal-tesviki-78x50.jpg 78w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/zorlu-enerjiye-jeotermal-tesviki.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>m A\u015e taraf\u0131ndan Denizli ve Ayd\u0131n ili s\u0131n\u0131r\u0131nda kurulacak K\u0131z\u0131ldere III Jeotermal Enerji Santrali\u2019ne finansman sa\u011flanmas\u0131 amac\u0131yla \u00e7e\u015fitli banka ve finans kurulu\u015flar\u0131yla g\u00f6r\u00fc\u015fmelere ba\u015fland\u0131.<\/span><\/strong><\/p>\n<p>Yap\u0131lan a\u00e7\u0131klamada, \u015firketin y\u00fczde 100 oran\u0131nda ba\u011fl\u0131 ortakl\u0131\u011f\u0131 olan Zorlu Do\u011fal Elektrik \u00dcretim A\u015e, Denizli ve Ayd\u0131n il s\u0131n\u0131rlar\u0131nda yer alan Karata\u015f mevkisinde kurmakta oldu\u011fu ve toplamda 165 megavat kurulu g\u00fcce sahip olmas\u0131 planlanan K\u0131z\u0131ldere III Jeotermal Enerji Santrali yat\u0131r\u0131m\u0131n\u0131n 69,8 megavatl\u0131k 2. \u00fcnitesinin finansman\u0131n\u0131n sa\u011flanmas\u0131 amac\u0131yla \u00e7e\u015fitli banka ve finansal kurulu\u015flarla g\u00f6r\u00fc\u015fmelere ba\u015fland\u0131\u011f\u0131n\u0131n ifadelerine yer verildi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Zorlu Enerji Elektrik \u00dcretim A\u015e taraf\u0131ndan Denizli ve Ayd\u0131n ili s\u0131n\u0131r\u0131nda kurulacak K\u0131z\u0131ldere III Jeotermal Enerji Santrali\u2019ne finansman sa\u011flanmas\u0131 amac\u0131yla \u00e7e\u015fitli banka ve [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":50976,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,48],"tags":[63,67,1009,2698,165,58,56,32487,23226,22984,32488,23225,32489,344],"views":871,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/60069"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=60069"}],"version-history":[{"count":4,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/60069\/revisions"}],"predecessor-version":[{"id":60073,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/60069\/revisions\/60073"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/50976"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=60069"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=60069"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=60069"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}