{"id":59655,"date":"2016-12-02T14:59:32","date_gmt":"2016-12-02T11:59:32","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=59655"},"modified":"2016-12-02T14:59:32","modified_gmt":"2016-12-02T11:59:32","slug":"gurisin-80-mw-fatma-resi-elektrik-uretimine-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gurisin-80-mw-fatma-resi-elektrik-uretimine-basladi\/","title":{"rendered":"(Turkish) G\u00fcri\u015f&#8217;in 80 MW Fatma RES&#8217;i Elektrik \u00dcretimine Ba\u015flad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/59655\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>80 MW Fatma RES elektrik \u00fcretimine ba\u015flad\u0131.\u00a0<\/strong><strong>G\u00fcri\u015f Holding\u2019in, 80 MW kapasiteye sahip, Mu\u011fla\u2019da yer alan Fatma R\u00fczg\u00e2r Enerji Santrali\u00a0<\/strong><strong>(RES), y\u0131lda 211.500.000 kWh elektrik \u00fcretimi yapacak.<\/strong><\/p>\n<p>92,5 metre t\u00fcrbin y\u00fcksekli\u011fine sahip olan Fatma RES, SIEMENS SWT-3.2-113 DD t\u00fcrbin ile \u2018\u2019Direct Drive\u2019\u2019 t<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/12\/gurisin-80-mw-fatma-resi-elektrik-uretimine-basladi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-59656\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/12\/gurisin-80-mw-fatma-resi-elektrik-uretimine-basladi-300x200.jpg\" alt=\"gurisin-80-mw-fatma-resi-elektrik-uretimine-basladi\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/12\/gurisin-80-mw-fatma-resi-elektrik-uretimine-basladi-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/12\/gurisin-80-mw-fatma-resi-elektrik-uretimine-basladi-1024x682.jpg 1024w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/12\/gurisin-80-mw-fatma-resi-elektrik-uretimine-basladi-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/12\/gurisin-80-mw-fatma-resi-elektrik-uretimine-basladi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/12\/gurisin-80-mw-fatma-resi-elektrik-uretimine-basladi.jpg 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>eknolojisi kullan\u0131larak hayata ge\u00e7irildi. 2000 y\u0131l\u0131ndan beri r\u00fczg\u00e2r enerjisi alan\u0131nda \u00e7\u00f6z\u00fcmler \u00fcreten G\u00dcR\u0130\u015e Holding, yeni yat\u0131r\u0131m\u0131yla birlikte r\u00fczg\u00e2r enerji santrallerinin kurulu g\u00fcc\u00fcn\u00fc 368 MW\u2019a, RES say\u0131s\u0131n\u0131 da 6\u2019ya \u00e7\u0131karm\u0131\u015f oldu.<\/p>\n<p>Ger\u00e7ekle\u015ftirdikleri yat\u0131r\u0131mla ilgili G\u00fcri\u015f \u0130n\u015faat A.\u015e Y\u00f6netim Kurulu Ba\u015fkan\u0131 ve Genel M\u00fcd\u00fcr\u00fc M\u00fc\u015ffik Hamdi Yamant\u00fcrk; \u201cYenilenebilir enerjiye yapt\u0131\u011f\u0131m\u0131z yat\u0131r\u0131mlarla T\u00fcrkiye\u2019nin enerjide d\u0131\u015fa ba\u011f\u0131ml\u0131l\u0131\u011f\u0131n\u0131 azaltmay\u0131 hedefliyor ve bu alanda bir\u00e7ok giri\u015fimde bulunuyoruz. Bu do\u011frultuda, en\u00a0 son\u00a0 olarak,\u00a0 211.500.000\u00a0 kWh\/Y\u0131l\u00a0 elektrik \u00a0\u00fcretecek\u00a0 80\u00a0 MW\u2019l\u0131k\u00a0 Fatma\u00a0 RES santrali yap\u0131lm\u0131\u015ft\u0131r.\u00a0 Fatma RES d\u0131\u015f\u0131nda bu y\u0131l i\u00e7erisinde 64 MW\u2019l\u0131k Kanije RES ve 25.4 MW\u2019l\u0131k Zeliha RES santrallerimiz de enerji \u00fcretimine ba\u015flad\u0131lar\u201d\u00a0ifadelerine yer verdi.<\/p>\n<p><strong>Yenilenebilir Enerji Santrallerinde hedef 1150 MW kurulu g\u00fc\u00e7<\/strong><\/p>\n<p>Fatma R\u00fczg\u00e2r Enerji Santrali\u2019ni (RES) i\u015fletmeye alarak \u201cyenilenebilir enerji santrali\u201d say\u0131s\u0131n\u0131 17\u2019ye \u00e7\u0131karan G\u00fcri\u015f Holding\u2019in portf\u00f6y\u00fcnde 6 R\u00fczg\u00e2r Enerji Santrali (RES), 6 Hidroelektrik Enerjisi santrali (HES) ve 5 Jeotermal Enerji Santrali (JES) bulunuyor. G\u00fcri\u015f Holding Yenilenebilir Enerji Santrallerinin kurulu g\u00fcc\u00fcn\u00fc k\u0131sa bir s\u00fcre i\u00e7inde 1150 MW\u2019a \u00e7\u0131kartmay\u0131 hedeflemektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.80 MW Fatma RES elektrik \u00fcretimine ba\u015flad\u0131.\u00a0G\u00fcri\u015f Holding\u2019in, 80 MW kapasiteye sahip, Mu\u011fla\u2019da yer alan Fatma R\u00fczg\u00e2r Enerji Santrali\u00a0(RES), y\u0131lda 211.500.000 kWh elektrik [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":59656,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[19,63,67,1009,2698,165,3513,474,69,16,231,23318,22615,4784],"views":1358,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/59655"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=59655"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/59655\/revisions"}],"predecessor-version":[{"id":59657,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/59655\/revisions\/59657"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/59656"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=59655"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=59655"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=59655"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}