{"id":59604,"date":"2016-12-01T11:46:07","date_gmt":"2016-12-01T08:46:07","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=59604"},"modified":"2016-12-01T11:52:44","modified_gmt":"2016-12-01T08:52:44","slug":"aksa-enerji-6-resi-259-milyon-dolara-gurise-satacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aksa-enerji-6-resi-259-milyon-dolara-gurise-satacak\/","title":{"rendered":"(Turkish) Aksa Enerji 6 RES&#8217;ini 259 Milyon Dolara G\u00fcri\u015f\u2019e Satacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/59604\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\"><strong>Aksa Enerji \u00dcretim, 10 Kas\u0131m 2016 tarihinde teklif almaya ba\u015flad\u0131\u011f\u0131 toplam\u00a0232 MWkurulu g\u00fcc<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/aksa-enerji-uc-farkli-ruzgar-santrali-projesi-icin-44-milyon-euro-kredi-aldi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-14297\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/aksa-enerji-uc-farkli-ruzgar-santrali-projesi-icin-44-milyon-euro-kredi-aldi-300x199.jpg\" alt=\"aksa-enerji-uc-farkli-ruzgar-santrali-projesi-icin-44-milyon-euro-kredi-aldi\" width=\"300\" height=\"199\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/aksa-enerji-uc-farkli-ruzgar-santrali-projesi-icin-44-milyon-euro-kredi-aldi-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/aksa-enerji-uc-farkli-ruzgar-santrali-projesi-icin-44-milyon-euro-kredi-aldi-500x332.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/aksa-enerji-uc-farkli-ruzgar-santrali-projesi-icin-44-milyon-euro-kredi-aldi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/aksa-enerji-uc-farkli-ruzgar-santrali-projesi-icin-44-milyon-euro-kredi-aldi.jpg 505w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>e ula\u015fan Hatay Sebenoba R\u00fczgar Santrali, Manisa Karakurt R\u00fczgar Santrali, Bal\u0131kesir \u015eaml\u0131 R\u00fczgar Santrali, Ayvac\u0131k R\u00fczgar Santrali, Kap\u0131da\u011f R\u00fczgar Santrali ve Belen\/Atik R\u00fczgar Santrali\u2018ni toplam\u00a0259 milyon dolara\u00a0T\u00fcrkiye\u2019nin \u00f6nde gelen altyap\u0131 in\u015faat firmalar\u0131ndan olan G\u00fcri\u015f \u015eirketler Grubu\u2018na sat\u0131yor.<\/strong><span id=\"more-85554\"><\/span><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Aksa taraf\u0131ndan KAP\u2019a yap\u0131lan a\u00e7\u0131klamada, sat\u0131\u015f ger\u00e7ekle\u015fti\u011fi takdirde elde edilecek nakit tahsilat\u0131 ana ortakl\u0131\u011f\u0131n\u0131n k\u0131sa vadeli y\u00fck\u00fcml\u00fcl\u00fcklerinin azalt\u0131lmas\u0131nda kullan\u0131laca\u011f\u0131 belirtildi.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Kaynak: <a href=\"https:\/\/www.kap.org.tr\/Bildirim\/570215\" target=\"_blank\" rel=\"nofollow\">KAP<\/a><\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Aksa Enerji \u00dcretim, 10 Kas\u0131m 2016 tarihinde teklif almaya ba\u015flad\u0131\u011f\u0131 toplam\u00a0232 MWkurulu g\u00fcce ula\u015fan Hatay Sebenoba R\u00fczgar Santrali, Manisa Karakurt R\u00fczgar Santrali, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":14297,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[1571,32353,32354,32156,32355,32356,32357,63,67,1009,2698,165,3513,474,69,231,23318,22615,4784],"views":1743,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/59604"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=59604"}],"version-history":[{"count":6,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/59604\/revisions"}],"predecessor-version":[{"id":59611,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/59604\/revisions\/59611"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/14297"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=59604"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=59604"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=59604"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}