{"id":59254,"date":"2016-11-18T18:44:44","date_gmt":"2016-11-18T15:44:44","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=59254"},"modified":"2016-11-18T18:46:19","modified_gmt":"2016-11-18T15:46:19","slug":"suudi-arabistan-toplamda-170-mwlik-gunes-santrali-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/suudi-arabistan-toplamda-170-mwlik-gunes-santrali-kuracak\/","title":{"rendered":"(Turkish) Suudi Arabistan Fas\u2019ta 170 MW\u2019l\u0131k G\u00fcne\u015f Enerjisi Santrali Kuracak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/59254\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\"><strong>Suudi Arabistan merkezli Acwa Pover \u015eirketi\u2019nin Fas\u2019a yenilenebilir enerji&#8217;de 220 milyon dolarl\u0131k yat\u0131r\u0131m yapaca\u011f\u0131\u00a0belirtildi.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/11\/suudi-arabistan-toplamda-170-mwlik-gunes-santrali-kuracak.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-59255\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/11\/suudi-arabistan-toplamda-170-mwlik-gunes-santrali-kuracak-300x225.jpg\" alt=\"suudi-arabistan-toplamda-170-mwlik-gunes-santrali-kuracak\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/11\/suudi-arabistan-toplamda-170-mwlik-gunes-santrali-kuracak-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/11\/suudi-arabistan-toplamda-170-mwlik-gunes-santrali-kuracak-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/11\/suudi-arabistan-toplamda-170-mwlik-gunes-santrali-kuracak-66x50.jpg 66w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/11\/suudi-arabistan-toplamda-170-mwlik-gunes-santrali-kuracak.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Fas\u2019\u0131n i\u00e7 kesimlerinde ve sahra b\u00f6lgesinde yat\u0131r\u0131mlar\u0131n yap\u0131laca\u011f\u0131 belirtilen\u00a0a\u00e7\u0131klamada, \u201cBu proje ile Varzazat\u2019ta 80, Al Ayun\u2019da 70 ve Bucedur\u2019da 20 megavat olmak \u00fczere toplam 170 megavatl\u0131k enerji \u00fcretimini hayata ge\u00e7irilecektir.\u201d ifadeleri kullan\u0131ld\u0131.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Acwa Pover \u015eirketi, ge\u00e7ti\u011fimiz \u015fubat ay\u0131nda \u201cNur 1\u201d ad\u0131yla d\u00fcnyan\u0131n en b\u00fcy\u00fck g\u00fcne\u015f enerjisi santralini Varzazat\u2019ta faaliyete ge\u00e7irmi\u015fti. Nur 1 Solar elektrik teknolojisi ile kurulan ve 652 Milyon dolara mal olan santral tam kapasite ile \u00e7al\u0131\u015ft\u0131\u011f\u0131nda toplam da 580 megavatl\u0131k g\u00fc\u00e7\u00a0sa\u011flayacakt\u0131r.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2016\/11\/18\/suudi-arabistan-fasta-toplam-170-mwlik-gunes-enerjisi-santralleri-kuracak\" target=\"_blank\" rel=\"nofollow\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Suudi Arabistan merkezli Acwa Pover \u015eirketi\u2019nin Fas\u2019a yenilenebilir enerji&#8217;de 220 milyon dolarl\u0131k yat\u0131r\u0131m yapaca\u011f\u0131\u00a0belirtildi. Fas\u2019\u0131n i\u00e7 kesimlerinde ve sahra b\u00f6lgesinde yat\u0131r\u0131mlar\u0131n yap\u0131laca\u011f\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":59255,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[32228,63,67,1009,2698,165,15126,2326,227,13,1325,5982,23133,22975,26059,4269,32229,1463,105],"views":1335,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/59254"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=59254"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/59254\/revisions"}],"predecessor-version":[{"id":59257,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/59254\/revisions\/59257"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/59255"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=59254"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=59254"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=59254"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}