{"id":58873,"date":"2016-11-05T16:56:52","date_gmt":"2016-11-05T13:56:52","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=58873"},"modified":"2016-11-05T16:59:21","modified_gmt":"2016-11-05T13:59:21","slug":"ordu-yaylalarinda-ruzgardan-enerji-uretimi-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ordu-yaylalarinda-ruzgardan-enerji-uretimi-basladi\/","title":{"rendered":"(Turkish) Ordu&#8217;nun Yaylalar\u0131nda R\u00fczgardan Enerji \u00dcretimi Ba\u015flad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/58873\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong><span style=\"color: #0a0a0a;\">Ordu\u2019nun Aybast\u0131 ile Tokat\u2019\u0131n Re\u015fadiye il\u00e7eleri aras\u0131nda bulunan Boz\u00e7al\u0131ba\u015f\u0131 ile K\u0131zkayas\u0131 (K\u00fc\u00e7\u00fckyaka) Yaylas\u0131 aras\u0131nda yap\u0131m\u0131 tamamlanan r\u00fczgar t\u00fcrbinleri elektrik enerjisi \u00fcretimine ba\u015flad\u0131.<\/span><\/strong><span id=\"more-84930\" style=\"color: #0a0a0a;\"><\/span><\/p>\n<p>Ordu ve Tokat yaylalar\u0131nda<img loading=\"lazy\" class=\"alignleft wp-image-58874 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/11\/ordu-yaylalarinda-ruzgardan-enerji-uretimi-basladi-300x199.jpg\" alt=\"????????\" width=\"300\" height=\"199\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/11\/ordu-yaylalarinda-ruzgardan-enerji-uretimi-basladi-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/11\/ordu-yaylalarinda-ruzgardan-enerji-uretimi-basladi-500x332.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/11\/ordu-yaylalarinda-ruzgardan-enerji-uretimi-basladi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/11\/ordu-yaylalarinda-ruzgardan-enerji-uretimi-basladi.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>\u00a0esen r\u00fczgarlar\u0131 enerjiye d\u00f6n\u00fc\u015ft\u00fcrmesi \u00e7al\u0131\u015fmalar\u0131 kapsam\u0131nda 2015 y\u0131l\u0131 Haziran ay\u0131nda ba\u015flayan ve 2016 y\u0131l\u0131 Temmuz ay\u0131nda tamamlanan R\u00fczgar Enerjisi \u00dcretim Santralleri (RES) ve elektrik iletim tesisleri faaliyete ge\u00e7ti. Kinesis Enerji taraf\u0131ndan yap\u0131lan\u00a0yat\u0131r\u0131m kapsam\u0131nda 10 adet r\u00fczgar t\u00fcrbini elektrik enerjisi \u00fcretmektedir.<\/p>\n<p>Deniz seviyesinden bin 700 metre y\u00fcksekli\u011fe kurulu olan 10 adet r\u00fczgar t\u00fcrbini y\u0131lda 40 bin evin elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131layacakt\u0131r. Y\u0131lda yakla\u015f\u0131k 100 Gwh elektrik \u00fcretmesi beklenen 113 metre kanat \u00e7ap\u0131 ve 83.5 metre kule y\u00fcksekli\u011fine sahip r\u00fczgar t\u00fcrbinlerinin y\u0131lda 85 bin ton karbondioksit sal\u0131m\u0131n\u0131 da engellenmesi\u00a0hedeflenmektedir.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2016\/11\/04\/ordu-yaylalarinda-ruzgardan-enerji-uretimine-baslandi\/\" target=\"_blank\" rel=\"nofollow\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Ordu\u2019nun Aybast\u0131 ile Tokat\u2019\u0131n Re\u015fadiye il\u00e7eleri aras\u0131nda bulunan Boz\u00e7al\u0131ba\u015f\u0131 ile K\u0131zkayas\u0131 (K\u00fc\u00e7\u00fckyaka) Yaylas\u0131 aras\u0131nda yap\u0131m\u0131 tamamlanan r\u00fczgar t\u00fcrbinleri elektrik enerjisi \u00fcretimine ba\u015flad\u0131. Ordu [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":58874,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[61,63,67,1009,2698,165,32073,32074,474,69,16,5852,23318,22615,312,4784,324,32075],"views":891,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/58873"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=58873"}],"version-history":[{"count":4,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/58873\/revisions"}],"predecessor-version":[{"id":58878,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/58873\/revisions\/58878"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/58874"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=58873"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=58873"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=58873"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}