{"id":58426,"date":"2016-10-24T10:10:21","date_gmt":"2016-10-24T07:10:21","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=58426"},"modified":"2016-10-23T23:08:16","modified_gmt":"2016-10-23T20:08:16","slug":"fatsa-da-1-78-mwlik-biyokutle-tesisi-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/fatsa-da-1-78-mwlik-biyokutle-tesisi-kurulacak\/","title":{"rendered":"(Turkish) Fatsa&#8217;da 1.78 MW&#8217;l\u0131k Biyok\u00fctle Tesisi Kurulacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/58426\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Dorpet Enerji taraf\u0131ndan \u00a0Ordu&#8217;nun Fatsa il\u00e7esinde 1,78 MWe kurulu g\u00fc\u00e7te \u201cBiyok\u00fctle Enerji \u00dcretim Tesisi\u201d kurulumu yap\u0131lacak.<\/strong><\/p>\n<p>Dorpet Enerji Akaryak\u0131t \u0130n\u015f. San. Tic. Ltd. \u015eti. taraf\u0131ndan Ordu \u0130li, Fatsa \u0130l\u00e7esi s\u0131n\u0131rlar\u0131 i\u00e7erisinde, Evka<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/10\/fatsaya-1-78-mwlik-biyokutle-tesisi-kurulacak.jpg\"><img loading=\"lazy\" class=\"alignright  wp-image-58427\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/10\/fatsaya-1-78-mwlik-biyokutle-tesisi-kurulacak.jpg\" alt=\"fatsaya-1-78-mwlik-biyokutle-tesisi-kurulacak\" width=\"300\" height=\"170\" \/><\/a>f Mahallesi yak\u0131nlar\u0131nda, 1,844 MWm \/ 1,78 MWe kurulu g\u00fcc\u00fcnde \u201cBiyok\u00fctle Enerji \u00dcretim Tesisi\u201d kurulmas\u0131 planlanmaktad\u0131r.<\/p>\n<p>950.000 TL bedelli proje ile \u00a0Ordu B\u00fcy\u00fck\u015fehir Belediyesi ve Fatsa Belediyesi taraf\u0131ndan halihaz\u0131rda vah\u015fi depolama alan\u0131 olarak kullan\u0131lan 1845 nolu parselde olu\u015fan \u00e7\u00f6p gaz\u0131 potansiyelinin de\u011ferlendirilerek elektrik enerjisi \u00fcretilmesi ve enterkonnekte sisteme ba\u011flant\u0131s\u0131n\u0131n yap\u0131lmas\u0131 ama\u00e7lanmaktad\u0131r.<\/p>\n<p>Tesiste \u00e7\u00f6p gaz\u0131nda (LFG) bulunan metan gaz\u0131n\u0131n gaz motorlar\u0131nda yak\u0131lmas\u0131 ile toplamda 1,844 MWm \/ 1,78 MWe kurulu g\u00fcc\u00fcnde enerji elde edilecek, bu sayede enterkonnekte sisteme y\u0131lda 14.240.000 kWh\/y\u0131l elektrik enerjisi sa\u011flanacakt\u0131r.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.enerjigunlugu.net\/icerik\/20217\/fatsaya-178-mwlik-biyokutle-tesisi.html#.WA0XM1SLRdg\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Dorpet Enerji taraf\u0131ndan \u00a0Ordu&#8217;nun Fatsa il\u00e7esinde 1,78 MWe kurulu g\u00fc\u00e7te \u201cBiyok\u00fctle Enerji \u00dcretim Tesisi\u201d kurulumu yap\u0131lacak. Dorpet Enerji Akaryak\u0131t \u0130n\u015f. San. Tic. Ltd. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":58427,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,53],"tags":[31914,31912,63,67,1009,2698,165,31913,7162],"views":1606,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/58426"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=58426"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/58426\/revisions"}],"predecessor-version":[{"id":58429,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/58426\/revisions\/58429"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/58427"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=58426"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=58426"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=58426"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}