{"id":5811,"date":"2013-01-30T17:06:21","date_gmt":"2013-01-30T14:06:21","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=5811"},"modified":"2013-01-30T17:08:05","modified_gmt":"2013-01-30T14:08:05","slug":"fransa-gunes-enerjisinde-3-5-gwa-ulasti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/fransa-gunes-enerjisinde-3-5-gwa-ulasti\/","title":{"rendered":"(Turkish) Fransa G\u00fcne\u015f Enerjisinde 3.5 GW&#8217;a Ula\u015ft\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/5811\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Fransa&#8217;n\u0131n kurulu g\u00fcne\u015f enerjisi g\u00fcc\u00fcn\u00fcn 2012&#8217;de 1,022 MW artarak 3.5 GW\u00a0 seviyesine y\u00fckseldi\u011fi a\u00e7\u0131kland\u0131.<\/strong><\/p>\n<p>Fransa elektrik da\u011f\u0131t\u0131m i\u015fletmecisi &#8216;R\u00e9seau de Transport d\u2019Electricit\u00e9\u00a0 (RTE)&#8221; taraf\u0131ndan yap\u0131lan a\u00e7\u0131klamada ayr\u0131ca ge\u00e7en y\u0131l fotovoltaik sistemler ile\u00a0 \u00fclkenin toplam elektrik talebinin y\u00fczde 0.79&#8217;una denk olacak \u015fekilde 4 TWh\u00a0 d\u00fczeyinde elektrik \u00fcretimi sa\u011fland\u0131\u011f\u0131 belirtildi.<\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-5813\" title=\"fransa-gunes-enerjisi-2012\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/01\/fransa-gunes-enerjisi-2012-300x163.jpg\" alt=\"\" width=\"300\" height=\"163\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/01\/fransa-gunes-enerjisi-2012-300x163.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/01\/fransa-gunes-enerjisi-2012-80x43.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/01\/fransa-gunes-enerjisi-2012.jpg 460w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Bununla birlikte yenilenebilir enerji kaynaklar\u0131n\u0131n \u00fclkenin elektrik\u00a0 \u00fcretimindeki pay\u0131 son be\u015f y\u0131l\u0131n en y\u00fcksek seviyesine \u00e7\u0131karak y\u00fczde 16.4 oldu.\u00a0 N\u00fckleer enerjinin pay\u0131 ise y\u00fczde 3.8 d\u00fc\u015ferek, y\u00fczde 74.8&#8217;e geriledi.<\/p>\n<p>Fran\u00e7ois Hollande h\u00fck\u00fcmeti g\u00f6reve geldi\u011finde \u00fclkenin elektrik \u00fcretiminde\u00a0 n\u00fckleer enerjinin pay\u0131n\u0131 d\u00fc\u015f\u00fcrecek ve yenilenebilir enerjilerin pay\u0131n\u0131 artt\u0131racak ad\u0131mlar\u0131 atmaya ba\u015flam\u0131\u015ft\u0131.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.yesilekonomi.com\/yenilenebilir-enerji\/fransa-gunes-enerjisinde-3.5-gwa-ulasti\" target=\"_blank\">Ye\u015fil Ekonomi<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Fransa&#8217;n\u0131n kurulu g\u00fcne\u015f enerjisi g\u00fcc\u00fcn\u00fcn 2012&#8217;de 1,022 MW artarak 3.5 GW\u00a0 seviyesine y\u00fckseldi\u011fi a\u00e7\u0131kland\u0131. Fransa elektrik da\u011f\u0131t\u0131m i\u015fletmecisi &#8216;R\u00e9seau de Transport d\u2019Electricit\u00e9\u00a0 (RTE)&#8221; [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5813,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[67,1346,13,105],"views":753,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/5811"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=5811"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/5811\/revisions"}],"predecessor-version":[{"id":5814,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/5811\/revisions\/5814"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/5813"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=5811"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=5811"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=5811"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}