{"id":58016,"date":"2016-10-09T22:01:29","date_gmt":"2016-10-09T19:01:29","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=58016"},"modified":"2016-10-09T22:01:58","modified_gmt":"2016-10-09T19:01:58","slug":"gonen-kirsalinin-ihtiyacindan-fazlasi-biyokutle-tesisi-tarafindan-karsilanacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gonen-kirsalinin-ihtiyacindan-fazlasi-biyokutle-tesisi-tarafindan-karsilanacak\/","title":{"rendered":"(Turkish) G\u00f6nen&#8217;in \u0130htiyac\u0131ndan Fazlas\u0131 Biyok\u00fctle Tesisi Taraf\u0131ndan Kar\u015f\u0131lanacak&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/58016\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Bal\u0131kesir\u2019in G\u00f6nen il\u00e7esinde deneme \u00fcretimini bitiren biyok\u00fctle tesisi 11 Ekim\u2019de tam kapasite ile \u00fcretime ba\u015fl\u0131yor. Biyok\u00fctle Enerji Tesisine EPDK\u2019den 49 y\u0131ll\u0131\u011f\u0131na lisans al\u0131n\u0131rken, Bal\u0131kesir B\u00fcy\u00fck\u015fehir Belediyesi de dev tesise y\u00fczde 5 oran\u0131nda ortak olacakt\u0131r.<\/strong><\/p>\n<p>Saatte 30 MW kurulu g\u00fc\u00e7le T\u00fcrkiye\u2019nin lisansl\u0131 en b\u00fcy\u00fck Biyok\u00fctle Enerji Tesisinde, bitkisel at\u0131ktan elde edilen enerjiyle <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/10\/gonen-kirsalinin-ihtiyacindan-fazlasini-biyokutle-tesisi-karsilayacaktir.jpeg\"><img loading=\"lazy\" class=\"alignright  wp-image-58017\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/10\/gonen-kirsalinin-ihtiyacindan-fazlasini-biyokutle-tesisi-karsilayacaktir-300x110.jpeg\" alt=\"gonen-kirsalinin-ihtiyacindan-fazlasini-biyokutle-tesisi-karsilayacaktir\" width=\"325\" height=\"158\" \/><\/a>Bal\u0131kesir\u2019in elektri\u011finin kar\u015f\u0131lanmas\u0131 hedeflenmektedir. G\u00fcnde 700 ton at\u0131ktan geri d\u00f6n\u00fc\u015f\u00fcmle 720 MW enerji \u00fcretilece\u011fini bildiren yat\u0131r\u0131mc\u0131 \u0130brahim Mutlu: \u201c13 Ekim\u2019de Bal\u0131kesir B\u00fcy\u00fck\u015fehir Belediyesine, y\u00fczde 5\u2019lik hisse devrini ger\u00e7ekle\u015ftirece\u011fiz. Hisse devrinin ger\u00e7ekle\u015fmesi ile birlikte B\u00fcy\u00fck\u015fehir Belediyemizin enerji tesisimizdeki ortakl\u0131\u011f\u0131 resmiyet kazanacakt\u0131r\u201d\u00a0ifadelerine yer verdi.<\/p>\n<p><strong>Proje ile\u00a0300 ki\u015fi istihdam edilecek<\/strong><\/p>\n<p>Mutlular Enerji b\u00fcnyesinde kurulan tesis ilk etapta G\u00f6nen\u2019in k\u0131rsal mahalleleri ve sanayi b\u00f6lgesinin ihtiyac\u0131n\u0131n 4 kat\u0131 elektrik \u00fcretecek. Tesisin orta vadede hedefi ise Bal\u0131kesir\u2019in elektri\u011fini \u00fcretmek olacakt\u0131r. Tesisin aktif hale getirilmesi ile hem at\u0131klar\u0131n geri d\u00f6n\u00fc\u015f\u00fcm\u00fc sa\u011flanacak, hem de tesise at\u0131k sa\u011flayan \u00e7ift\u00e7iler verdikleri at\u0131k oran\u0131nda para kazanacakt\u0131r. Biyok\u00fctle tesisinde ilk etapta 300 personel istihdam edilecektir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Bal\u0131kesir\u2019in G\u00f6nen il\u00e7esinde deneme \u00fcretimini bitiren biyok\u00fctle tesisi 11 Ekim\u2019de tam kapasite ile \u00fcretime ba\u015fl\u0131yor. Biyok\u00fctle Enerji Tesisine EPDK\u2019den 49 y\u0131ll\u0131\u011f\u0131na lisans al\u0131n\u0131rken, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":58017,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,53],"tags":[3613,1678,63,67,1009,2698,165,842,105],"views":1049,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/58016"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=58016"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/58016\/revisions"}],"predecessor-version":[{"id":58019,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/58016\/revisions\/58019"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/58017"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=58016"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=58016"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=58016"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}