{"id":58012,"date":"2016-10-09T21:52:30","date_gmt":"2016-10-09T18:52:30","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=58012"},"modified":"2016-10-09T21:52:30","modified_gmt":"2016-10-09T18:52:30","slug":"denizlinin-saraykoy-ilcesine-yeni-bir-jeotermal-santral-daha-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/denizlinin-saraykoy-ilcesine-yeni-bir-jeotermal-santral-daha-kurulacak\/","title":{"rendered":"(Turkish) Denizli&#8217;nin Sarayk\u00f6y \u0130l\u00e7esine Yeni Bir Jeotermal Santral Daha Kurulacak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/58012\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Denizli\u2019nin Sarayk\u00f6y il\u00e7esi Tekke Mahallesi\u2019nde yer alan 3 bin 470 hektar alanda jeotermal kayna\u011fa dayal\u0131 elektrik enerjisi \u00fcretilmesi i\u00e7in kiralama ihalesi\u00a0yap\u0131ld\u0131.<\/strong><\/p>\n<p>Denizli B\u00fcy\u00fck\u015fehir Bel<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/denizlide-ulasilan-jeotermalden-yilda-20-megavat-elektrik-uretilecek.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-31897\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/denizlide-ulasilan-jeotermalden-yilda-20-megavat-elektrik-uretilecek-300x222.jpg\" alt=\"denizli-jeotermal-elektrik-uretimi\" width=\"300\" height=\"222\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/denizlide-ulasilan-jeotermalden-yilda-20-megavat-elektrik-uretilecek-300x222.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/denizlide-ulasilan-jeotermalden-yilda-20-megavat-elektrik-uretilecek-500x370.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/denizlide-ulasilan-jeotermalden-yilda-20-megavat-elektrik-uretilecek-67x50.jpg 67w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/denizlide-ulasilan-jeotermalden-yilda-20-megavat-elektrik-uretilecek.jpg 600w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>ediyesi\u2019ne her y\u0131l 3 milyon TL de\u011ferinde gelir sa\u011flayacak Sarayk\u00f6y jeotermal kayna\u011fa dayal\u0131 elektrik enerjisi \u00fcretim sisteminin kiralama ihalesi, Denizli B\u00fcy\u00fck\u015fehir Belediyesi taraf\u0131ndan yap\u0131ld\u0131. Belediye Enc\u00fcmen Salonu\u2019nda B\u00fcy\u00fck\u015fehir Belediyesi Genel Sekreteri Mustafa \u00dcnal ba\u015fkanl\u0131\u011f\u0131nda yap\u0131lan ihale i\u00e7in 3 firma (Tekfen Holding, \u00c7elikler Holding ve Zorlu Holding) ba\u015fvuru belgelerini\u00a0takdim ettiler.<\/p>\n<p>2 firman\u0131n teklif verdi\u011fi ihaleyi ise Zorlu Holding kazand\u0131. \u0130haleyi kazanan firma, B\u00fcy\u00fck\u015fehir Belediyesi\u2019ne y\u0131ll\u0131k KDV hari\u00e7 3 milyon TL \u00f6deyecek ve y\u0131ll\u0131k i\u015fletme cirosundan y\u00fczde 19 pay verecek. \u0130halenin ard\u0131ndan yap\u0131lacak incelemenin sonunda proje k\u0131sa s\u00fcrede hayata ge\u00e7irilecektir. 25 y\u0131l s\u00fcreli yap\u0131lan anla\u015fma iste\u011fe ba\u011fl\u0131 olarak 35-45 y\u0131la kadar \u00e7\u0131kar\u0131labilecek.<\/p>\n<p>Her y\u0131l \u00f6denen bedel ise y\u0131ll\u0131k T\u00dcFE ve \u00dcFE oranlar\u0131na ba\u011fl\u0131 olarak art\u0131\u015f g\u00f6sterecektir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Denizli\u2019nin Sarayk\u00f6y il\u00e7esi Tekke Mahallesi\u2019nde yer alan 3 bin 470 hektar alanda jeotermal kayna\u011fa dayal\u0131 elektrik enerjisi \u00fcretilmesi i\u00e7in kiralama ihalesi\u00a0yap\u0131ld\u0131. Denizli B\u00fcy\u00fck\u015fehir [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":31897,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,48],"tags":[845,63,67,1009,2698,165,58,56,23226,23225,344],"views":2191,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/58012"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=58012"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/58012\/revisions"}],"predecessor-version":[{"id":58013,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/58012\/revisions\/58013"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/31897"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=58012"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=58012"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=58012"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}