{"id":57839,"date":"2016-10-04T15:03:54","date_gmt":"2016-10-04T12:03:54","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=57839"},"modified":"2016-10-04T15:04:31","modified_gmt":"2016-10-04T12:04:31","slug":"turkiyenin-ilk-biyokutle-tesisine-balikesirden-ortaklik-geldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiyenin-ilk-biyokutle-tesisine-balikesirden-ortaklik-geldi\/","title":{"rendered":"(Turkish) T\u00fcrkiye\u2019nin \u0130lk Biyok\u00fctle Tesisine Bal\u0131kesir&#8217;den Ortakl\u0131k Geldi&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/57839\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\"><strong>T\u00fcrkiye\u2019nin ilk biyok\u00fctle enerji tesisi Bal\u0131kesir\u2019in G\u00f6nen il\u00e7esinde 11 Ekim\u2019de \u00fcretime ba\u015fl\u0131yor. 60 milyon dolara malolan ve Mutlular Enerji b\u00fcnyesinde kurulan dev tesise 11 Ekim\u2019de Bal\u0131kesir B\u00fcy\u00fck\u015fehir Belediyesi de y\u00fczde 5 oran\u0131nda ortak oluyor.<\/strong><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\"><span id=\"more-84129\"><\/span>EPDK taraf\u0131ndan 49 y\u0131ll\u0131\u011f\u0131na lisans\u0131n\u0131 alan Mutlular Enerji, Bal\u0131kesir B\u00fcy\u00fck\u015fehir Belediyesine y\u00fczde 5 hisse devrini ger\u00e7ekle\u015ftirerek, B\u00fcy\u00fck\u015fehir Belediyesinin Biyok\u00fctle Enerji Tesisindeki ortakl\u0131\u011f\u0131 resmile\u015ftiriyor. Saatte <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/turkiyede-biyokutleden-enerji-uretimi-2014-yilinda-yuzde-49-artti-2.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-41221\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/turkiyede-biyokutleden-enerji-uretimi-2014-yilinda-yuzde-49-artti-2-300x165.jpg\" alt=\"turkiyede-biyokutleden-enerji-uretimi\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/turkiyede-biyokutleden-enerji-uretimi-2014-yilinda-yuzde-49-artti-2-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/turkiyede-biyokutleden-enerji-uretimi-2014-yilinda-yuzde-49-artti-2-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/turkiyede-biyokutleden-enerji-uretimi-2014-yilinda-yuzde-49-artti-2-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/turkiyede-biyokutleden-enerji-uretimi-2014-yilinda-yuzde-49-artti-2.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>30 MW kurulu g\u00fc\u00e7le T\u00fcrkiye\u2019nin lisansl\u0131 en b\u00fcy\u00fck Biyok\u00fctle Enerji Tesisinde, bitkisel at\u0131ktan elde edilen enerjiyle Bal\u0131kesir\u2019in elektri\u011finin kar\u015f\u0131lanmas\u0131 hedefleniyor. G\u00fcnde 700 ton at\u0131ktan geri d\u00f6n\u00fc\u015f\u00fcmle 720 MW enerji \u00fcretilece\u011fini bildiren Mutlular Enerji \u015eirketi Y\u00f6netim Kurulu Ba\u015fkan\u0131 \u0130brahim Mutlu, \u201c13 Ekim\u2019de Bal\u0131kesir B\u00fcy\u00fck\u015fehir Belediyesine, y\u00fczde 5\u2019lik hisse devrini ger\u00e7ekle\u015ftirece\u011fiz. Hisse devrinin ger\u00e7ekle\u015fmesi ile birlikte B\u00fcy\u00fck\u015fehir Belediyemizin enerji tesisimizdeki ortakl\u0131\u011f\u0131 resmiyet kazanacak\u201d dedi. Tesis ilk etapta G\u00f6nen\u2019in k\u0131rsal mahalleleri ve sanayi b\u00f6lgesinin ihtiyac\u0131n\u0131n 4 kat\u0131 elektrik \u00fcretimi yap\u0131lacakt\u0131r.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Tesisin orta vadede hedefi ise Bal\u0131kesir\u2019in elektri\u011fini \u00fcretmektir. Tesisin aktif hale getirilmesi ile hem at\u0131klar\u0131n geri d\u00f6n\u00fc\u015f\u00fcm\u00fc sa\u011flanacak, hem de tesise at\u0131k sa\u011flayan \u00e7ift\u00e7iler verdikleri at\u0131k oran\u0131nda para kazanacakt\u0131r. Biyok\u00fctle tesisinde ilk etapta 300 personel istihdam edilecek. Bal\u0131kesir B\u00fcy\u00fck\u015fehir Belediyesi ve Mutlular Enerji \u015eirketi ortakl\u0131\u011f\u0131nda G\u00f6nen Deri Karma Sanayi ve \u0130htisas B\u00f6lgesine kazand\u0131r\u0131lan, Biyok\u00fctle Enerji Santralinde, \u00e7eltik sap\u0131, kanalo, m\u0131s\u0131r sap\u0131, orman alt\u0131l\u0131\u011f\u0131 ile b\u00fcy\u00fckba\u015f hayvan g\u00fcbresi geri d\u00f6n\u00fc\u015f\u00fcm ile enerjiye d\u00f6n\u00fc\u015fecektir.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">60 Milyon dolara mal olan enerji tesisinde, g\u00fcnde 700 ton at\u0131\u011f\u0131n geri d\u00f6n\u00fc\u015f\u00fcm ile enerji \u00fcretilece\u011fini bildiren Mutlu, \u201cEnerji tesisimizde, g\u00fcnde 700 ton at\u0131ktan 720 MW enerji \u00fcretilecek. \u00c7ift\u00e7ilerimize, m\u0131s\u0131r, kanalo ve \u00e7eltik sap\u0131 i\u00e7in bedel \u00f6deyece\u011fiz. Enerji tesisimiz ile hem \u00fclkemiz hem de b\u00f6lgemiz \u00e7ift\u00e7isi kazanacak. T\u00fcm Bal\u0131kesir\u2019den bize at\u0131k sa\u011flayan \u00e7ift\u00e7inin cebine para koyaca\u011f\u0131z. Projemizin en g\u00fczel yan\u0131 da budur. Hem at\u0131klar\u0131 bertaraf edece\u011fiz, hem do\u011faya zarar vermeyece\u011fiz. \u00c7ift\u00e7iye para \u00f6deyece\u011fiz ve bunun sonucunda da \u015fehrimizin t\u00fcm elektrik ihtiyac\u0131n\u0131 giderece\u011fiz\u201d\u00a0ifadelerine yer verdi.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye\u2019nin ilk biyok\u00fctle enerji tesisi Bal\u0131kesir\u2019in G\u00f6nen il\u00e7esinde 11 Ekim\u2019de \u00fcretime ba\u015fl\u0131yor. 60 milyon dolara malolan ve Mutlular Enerji b\u00fcnyesinde kurulan dev [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":41221,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,53],"tags":[1678,6053,31734,63,67,1009,2698,165,750,31735,3352,23707,31736],"views":2198,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/57839"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=57839"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/57839\/revisions"}],"predecessor-version":[{"id":57841,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/57839\/revisions\/57841"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/41221"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=57839"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=57839"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=57839"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}