{"id":57663,"date":"2016-09-28T10:27:19","date_gmt":"2016-09-28T07:27:19","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=57663"},"modified":"2016-09-28T10:28:35","modified_gmt":"2016-09-28T07:28:35","slug":"tire-ruzgar-enerji-santrali-icin-imzalar-atildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/tire-ruzgar-enerji-santrali-icin-imzalar-atildi\/","title":{"rendered":"(Turkish) Tire R\u00fczgar Enerji Santrali \u0130\u00e7in Anla\u015fma Sa\u011fland\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/57663\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\"><strong>General Electric (GE) ve T\u00fcrkerler Holding aras\u0131nda, \u0130zmir Tire R\u00fczgar Enerji Santrali (RES) i\u00e7in 22 adet r\u00fczgar t\u00fcrbini kurmak \u00fczere anla\u015fma yap\u0131ld\u0131.<\/strong><span id=\"more-83997\"><\/span><\/p>\n<div style=\"color: #0a0a0a;\">GE\u2019nin a\u00e7\u0131klamas\u0131na g\u00f6re, T\u00fcrkiye\u2019nin yerel sanayi ve istihdam\u0131n geli\u015fimine katk\u0131 sa\u011flamak \u00fczere yap\u0131lan<img loading=\"lazy\" class=\"alignright size-medium wp-image-35853\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/r\u00fczgar-santrali-2398733-300x168.jpg\" alt=\"r\u00fczgar-santrali-2398733\" width=\"300\" height=\"168\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/r\u00fczgar-santrali-2398733-300x168.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/r\u00fczgar-santrali-2398733-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/r\u00fczgar-santrali-2398733-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/01\/r\u00fczgar-santrali-2398733.jpg 795w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> anla\u015fma ile \u00fclkenin r\u00fczgar enerji kurulu g\u00fcc\u00fcne 50 megavat daha ilave g\u00fc\u00e7 eklenmesi planlanmaktad\u0131r.<\/div>\n<div style=\"color: #0a0a0a;\"><\/div>\n<div style=\"color: #0a0a0a;\">\u0130zmir\u2019de yer alan Tire R\u00fczgar Enerji Santrali projesi kapsam\u0131nda GE \u015firketi, proje i\u00e7in 22 adet iki farkl\u0131 modelde r\u00fczgar t\u00fcrbininin tedariki ve kurulumunu sa\u011flayacak. \u015eirket ayn\u0131 zamanda 10 y\u0131l boyunca ekipmanlar\u0131n bak\u0131m\u0131ndan da sorumlu olacakt\u0131r.<\/div>\n<div style=\"color: #0a0a0a;\"><\/div>\n<div style=\"color: #0a0a0a;\">A\u00e7\u0131klamada g\u00f6r\u00fc\u015flerine yer verilen T\u00fcrkerler Holding Y\u00f6netim Kurulu Ba\u015fkan\u0131 Kaz\u0131m T\u00fcrker, ge\u00e7en y\u0131l GE ile Barbaros R\u00fczgar Enerji Santrali ve Kalfak\u00f6y projelerinde i\u015f birliklerinin bulundu\u011funu belirterek, \u201cEge b\u00f6lgesindeki Tire R\u00fczgar Enerjisi Santralimiz i\u00e7in yapt\u0131\u011f\u0131m\u0131z bu yeni anla\u015fma ile daha \u00fcst bir noktaya ta\u015f\u0131d\u0131k. GE\u2019nin t\u00fcrbinleri ile T\u00fcrkerler Holding olarak r\u00fczgar enerjisi \u00fcretimindeki kurulu g\u00fcc\u00fcm\u00fcz toplamda 72 megavata ula\u015facak. \u0130\u015f birli\u011fimiz ile T\u00fcrkiye\u2019ye daha fazla yenilenebilir enerji ile g\u00fc\u00e7 sa\u011flamaktan gurur duyuyoruz.\u201d de\u011ferlendirmelerine yer verdi.<\/div>\n<div style=\"color: #0a0a0a;\"><\/div>\n<div style=\"color: #0a0a0a;\"><strong>\u201cYerel \u00fcretime katk\u0131 sa\u011flamaktay\u0131z\u201d<\/strong><\/div>\n<div style=\"color: #0a0a0a;\"><\/div>\n<div style=\"color: #0a0a0a;\">GE T\u00fcrkiye Y\u00f6netim Kurulu Ba\u015fkan\u0131 ve Genel M\u00fcd\u00fcr\u00fc Canan \u00d6zsoy ise a\u00e7\u0131klamas\u0131nda \u015funlar\u0131 s\u00f6yledi:<\/div>\n<div style=\"color: #0a0a0a;\"><\/div>\n<div style=\"color: #0a0a0a;\">\u201cGE T\u00fcrkiye olarak T\u00fcrkiye\u2019nin yenilenebilir enerji portf\u00f6y\u00fcn\u00fcn geli\u015fimine katk\u0131 sa\u011flamaktan, \u00fclkemizin hedeflerine ula\u015fmas\u0131nda rol oynamaktan gurur duymaktay\u0131z. T\u00fcrbin kule ve kanat \u00fcretimini T\u00fcrkiye\u2019de ger\u00e7ekle\u015ftirerek, T\u00fcrkiye\u2019de yerel \u00fcretim, inovasyon ve istihdam\u0131n geli\u015fimine katk\u0131 sa\u011flama taahh\u00fcd\u00fcm\u00fcz\u00fc yerine getirmekteyiz. T\u00fcrkerler Holding ile i\u015f birli\u011fimizle \u00fclkemizin yenilenebilir enerji portf\u00f6y\u00fcn\u00fc ileriye ta\u015f\u0131maktan ve ekonomiye katk\u0131 sa\u011flamaktan dolay\u0131 mutluluk duymaktay\u0131z.\u201d<\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. General Electric (GE) ve T\u00fcrkerler Holding aras\u0131nda, \u0130zmir Tire R\u00fczgar Enerji Santrali (RES) i\u00e7in 22 adet r\u00fczgar t\u00fcrbini kurmak \u00fczere anla\u015fma yap\u0131ld\u0131. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":35853,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[63,67,1009,2698,165,2422,785,69,16,23318,22615,4784,31668,8637],"views":993,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/57663"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=57663"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/57663\/revisions"}],"predecessor-version":[{"id":57666,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/57663\/revisions\/57666"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/35853"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=57663"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=57663"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=57663"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}