{"id":57522,"date":"2016-09-23T13:05:48","date_gmt":"2016-09-23T10:05:48","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=57522"},"modified":"2016-10-23T16:44:50","modified_gmt":"2016-10-23T13:44:50","slug":"eskisehir-sanayi-odasinin-gunes-ve-ruzgar-enerjisi-yatirimlari-onay-bekliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/eskisehir-sanayi-odasinin-gunes-ve-ruzgar-enerjisi-yatirimlari-onay-bekliyor\/","title":{"rendered":"(Turkish) Eski\u015fehir Sanayi Odas\u0131\u2019n\u0131n G\u00fcne\u015f ve R\u00fczgar Enerjisi Yat\u0131r\u0131mlar\u0131 Onay Bekliyor&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/57522\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\"><strong>Eski\u015fehir Sanayi Odas\u0131 taraf\u0131ndan yat\u0131r\u0131mc\u0131lar\u0131n en b\u00fcy\u00fck girdi maliyetlerinden enerjiyi ucuzlatmak amac\u0131yla hayata ge\u00e7irilen g\u00fcne\u015f ile r\u00fczgar enerjisi yat\u0131r\u0131m projeleri onay beklemektedir.<\/strong><span id=\"more-83872\"><\/span><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Eski\u015fehir Sanayi Odas\u0131 (ESO), yat\u0131r\u0131mc\u0131lar i\u00e7in en b\u00fcy\u00fck maliyet olan enerjiyi ucuzlatmak ve olas\u0131 enerji a\u00e7\u0131kl\u0131\u011f\u0131n\u0131 azaltmak i\u00e7in bir s\u00fcredir g\u00fcndemindeki yat\u0131r\u0131m planlar\u0131 i\u00e7in \u00e7al\u0131\u015fmalar\u0131 ba\u015flatt\u0131. Bu konuda yenilenebilir enerji se<img loading=\"lazy\" class=\"alignright size-medium wp-image-47890\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/yorum-gunes-ve-ruzgarin-zaferi-300x165.jpg\" alt=\"yorum-gunes-ve-ruzgarin-zaferi\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/yorum-gunes-ve-ruzgarin-zaferi-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/yorum-gunes-ve-ruzgarin-zaferi-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/yorum-gunes-ve-ruzgarin-zaferi-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/yorum-gunes-ve-ruzgarin-zaferi.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>\u00e7eneklerini de\u011ferlendirecek olan oda, g\u00fcne\u015f ile r\u00fczgar enerjisinden\u00a0fayda sa\u011flanacakt\u0131r.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">ESO taraf\u0131ndan kurulan Eski\u015fehir End\u00fcstriyel Enerji A\u015e, 50 milyon avroluk yat\u0131r\u0131mla 50 megavat g\u00fcc\u00fcnde R\u00fczgar Enerji Santrali (RES) kurmak i\u00e7in de\u011ferlendirme onay\u0131, Eski\u015fehir Organize Sanayi B\u00f6lgesi (OSB) s\u0131n\u0131rlan i\u00e7inde 1 megavat g\u00fcc\u00fcnde g\u00fcne\u015f enerjisinden elektrik \u00fcretimine y\u00f6nelik G\u00fcne\u015f Enerji Santral (GES) projesi i\u00e7in de yine onay beklenmektedir.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Oda Ba\u015fkan\u0131 Sava\u015f \u00d6zaydemir, a\u00e7\u0131klamas\u0131nda, yat\u0131r\u0131mc\u0131lar\u0131n girdi maliyetlerinde \u00f6nemli yer tutan elektrik enerjisini ucuzlatmak amac\u0131yla haz\u0131rlad\u0131klar\u0131 g\u00fcne\u015f ile r\u00fczgar enerjisi yat\u0131r\u0131m projeleri i\u00e7in onay beklediklerini\u00a0ifade etti.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Haz\u0131rlanan RES\u2019in \u00f6l\u00e7\u00fcm ve projesinin haz\u0131r oldu\u011funu aktaran \u00d6zaydemir, sanayi odas\u0131 ile 4-5 yat\u0131r\u0131mc\u0131n\u0131n onay bekledi\u011fini, en b\u00fcy\u00fck isteklerinin kendilerine f\u0131rsat verilmesi oldu\u011funu\u00a0belirtti.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Eski\u015fehir s\u0131n\u0131rlar\u0131nda 50 megavat RES yat\u0131r\u0131m\u0131 yapmak \u00fczere Elektrik Piyasas\u0131 Denetleme Kurumu\u2019na (EPDK) \u00f6n lisans ba\u015fvurusu yap\u0131ld\u0131\u011f\u0131n\u0131 anlatan \u00d6zaydemir, \u201cHen\u00fcz ba\u015fvurumuz di\u011fer ba\u015fvurular ile inceleme a\u015famas\u0131ndad\u0131r. Ayn\u0131 b\u00f6lgeye ve sahalara yap\u0131lan \u00e7oklu ba\u015fvurular\u0131n T\u00fcrkiye Elektrik \u0130letim A\u015e\u2019nin (TE\u0130A\u015e) Sistem Ba\u011flant\u0131 Tahsisi \u0130\u00e7in Yar\u0131\u015fma Y\u00f6netmeli\u011fine g\u00f6re de\u011ferlendirilmesi beklenmektedir.\u201d dedi.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">\u00d6zaydemir, TE\u0130A\u015e\u2019\u0131n bir yar\u0131\u015fma takvimi a\u00e7\u0131klay\u0131p, sistem kapasite tahsisi i\u00e7in birim megavat kurulu g\u00fc\u00e7 ba\u015f\u0131na fiyat teklifi usul\u00fcyle yar\u0131\u015fma d\u00fczenleyece\u011fini ifade ederek, s\u00f6zlerini \u015fu \u015fekilde s\u00fcrd\u00fcrd\u00fc:<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">\u201cBu yar\u0131\u015fmaya kat\u0131lan ve en y\u00fcksek fiyat\u0131 verenler ilgili b\u00f6lgeye tahsis edilen kapasiteye ula\u015f\u0131ncaya kadar TE\u0130A\u015e taraf\u0131ndan s\u0131ralanacak ve en y\u00fcksek fiyattan ba\u015flanarak kapasite tahsisi yap\u0131lacak. Ba\u015fvuru yapt\u0131\u011f\u0131m\u0131z saha Eski\u015fehir, Bilecik, K\u00fctahya b\u00f6lgesinde olup, toplam tahsis edilen yar\u0131\u015fma kapasitesi 50 megavat, yap\u0131lan \u00f6n lisans ba\u015fvurusu yakla\u015f\u0131k 900 megavatt\u0131r.\u201d<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Bir di\u011fer enerji yat\u0131r\u0131m\u0131n\u0131n OSB s\u0131n\u0131rlar\u0131 i\u00e7inde 1 megavatl\u0131k GES oldu\u011funa da de\u011finen \u00d6zaydemir, bunun i\u00e7in ba\u015fvuru yap\u0131ld\u0131\u011f\u0131n\u0131 da s\u00f6yledi.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Eski\u015fehir OSB\u2019den sisteme ba\u011flant\u0131 \u00e7a\u011fr\u0131 mektubu al\u0131nd\u0131\u011f\u0131n\u0131 s\u00f6yleyen\u00a0\u00d6zaydemir, \u201cProje TEDA\u015e\u2019a teslim edildi, o da onay s\u00fcrecindedir. Onay s\u00fcrecinden sonra OSB ile sistem ba\u011flant\u0131 ve kullan\u0131m anla\u015fmas\u0131, yat\u0131r\u0131m te\u015fvik ba\u015fvurusu ve malzeme tedarik s\u00fcreci ba\u015flayacak. Malzeme temini ve montaj\u0131 ile devreye al\u0131nmas\u0131 planlanmaktad\u0131r.\u201d\u00a0ifadelerine yer verdi.<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Eski\u015fehir Sanayi Odas\u0131 taraf\u0131ndan yat\u0131r\u0131mc\u0131lar\u0131n en b\u00fcy\u00fck girdi maliyetlerinden enerjiyi ucuzlatmak amac\u0131yla hayata ge\u00e7irilen g\u00fcne\u015f ile r\u00fczgar enerjisi yat\u0131r\u0131m projeleri onay beklemektedir. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":47890,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49,50],"tags":[63,67,1009,2698,165,750,31587,4740,227,13,23133,22975,4269,11436,474,69,233,16,23318,22615,4784,1582],"views":930,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/57522"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=57522"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/57522\/revisions"}],"predecessor-version":[{"id":58387,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/57522\/revisions\/58387"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/47890"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=57522"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=57522"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=57522"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}