{"id":57299,"date":"2016-09-13T12:40:37","date_gmt":"2016-09-13T09:40:37","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=57299"},"modified":"2016-09-13T12:40:37","modified_gmt":"2016-09-13T09:40:37","slug":"teskoop-konya-seydisehire-170-4-mwlik-gunes-santrali-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/teskoop-konya-seydisehire-170-4-mwlik-gunes-santrali-kuracak\/","title":{"rendered":"(Turkish) TESKOOP, Konya Seydi\u015fehir&#8217;e 170.4 MW&#8217;lik G\u00fcne\u015f Santrali Kuracak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/57299\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Seydi\u015fehir Belediyesi ile Temiz Enerji Sanayi Kooperatifi ortakl\u0131\u011f\u0131yla T\u00fcrkiye&#8217;nin en b\u00fcy\u00fck g\u00fcne\u015f enerji santrali kurulumunu ger\u00e7ekle\u015ftirecek.<\/strong><\/p>\n<p style=\"color: #555555;\">T\u00fcrkiye&#8217;nin ilk yenile<img loading=\"lazy\" class=\"alignleft size-medium wp-image-51895\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/gunes-santrali-ges-tarlasi-kurmak-istiyorum-peki-nereden-baslamaliyim-300x189.jpg\" alt=\"gunes-santrali-ges-tarlasi\" width=\"300\" height=\"189\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/gunes-santrali-ges-tarlasi-kurmak-istiyorum-peki-nereden-baslamaliyim-300x189.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/gunes-santrali-ges-tarlasi-kurmak-istiyorum-peki-nereden-baslamaliyim-500x316.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/gunes-santrali-ges-tarlasi-kurmak-istiyorum-peki-nereden-baslamaliyim-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/gunes-santrali-ges-tarlasi-kurmak-istiyorum-peki-nereden-baslamaliyim.jpg 765w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>nebilir enerji kooperatifi unvan\u0131na sahip Temiz Enerji Sanayi Kooperatifi (TESKOOP), Seydi\u015fehir Belediyesi i\u015fbirli\u011fiyle 170.4 MW&#8217;lik T\u00fcrkiye&#8217;nin en b\u00fcy\u00fck g\u00fcne\u015f enerji santralini kurmaya haz\u0131rlan\u0131yor. Gaziantep merkezli<br \/>\nTESKOOP&#8217;un Y\u00f6netim Kurulu Ba\u015fkan\u0131 \u00dcmit Sara\u00e7o\u011flu, T\u00fcrkiye g\u00fcne\u015f enerjisi a\u00e7\u0131s\u0131ndan d\u00fcnyan\u0131n en verimli \u00fclkelerinden birisi konumunda olmas\u0131na ra\u011fmen bunu yeterince de\u011ferlendiremedi\u011fine i\u015faret etti.<\/p>\n<p style=\"color: #555555;\">Sara\u00e7o\u011flu, eldeki y\u00fcksek g\u00fcne\u015f enerjisi potansiyelinin de\u011ferlendirebilmek amac\u0131yla T\u00fcrkiye&#8217;deki ilk yenilenebilir enerji kooperatifi TESKOOP&#8217;u 2015 sonlar\u0131nda kuruldu\u011funu anlatt\u0131.<\/p>\n<p style=\"color: #555555;\"><span style=\"font-weight: bold;\">170 MW&#8217;lik GES<\/span><\/p>\n<p style=\"color: #555555;\">Kooperatif olarak Konya&#8217;n\u0131n Seydi\u015fehir il\u00e7esinde 3 milyon 200 bin metrekarelik bir alanda 170.4 megawatl\u0131k T\u00fcrkiye&#8217;nin en b\u00fcy\u00fck g\u00fcne\u015f enerji santralini kurmay\u0131 planlad\u0131klar\u0131n\u0131 ifade eden \u00dcmit Sara\u00e7o\u011flu, &#8220;Bu projemizi Seydi\u015fehir Belediyesi&#8217;yle birlikte y\u00fcr\u00fctmekteyiz. Kullan\u0131lacak arazi mera vasf\u0131nda, \u015fimdi onu mera vasf\u0131ndan \u00e7\u0131kar\u0131yoruz, projelerimizi yapt\u0131k ve \u015fu an sonu\u00e7lanmas\u0131n\u0131 beklemekteyiz.&#8221;\u00a0dedi.<\/p>\n<p style=\"color: #555555;\"><span style=\"font-weight: bold;\">Sel\u00e7uk \u00dcniversitesi ile ortakl\u0131k<\/span><\/p>\n<p style=\"color: #555555;\">Projelerinin finansman ihtiyac\u0131n\u0131 tamamen yurt d\u0131\u015f\u0131 kaynaklardan sa\u011flayacaklar\u0131n\u0131 ifade eden TESKOOP Ba\u015fkan\u0131 \u00dcmit Sara\u00e7o\u011flu, Konya Sel\u00e7uk \u00dcniversitesi&#8217;yle de ortakla\u015fa bir projeyi hayata ge\u00e7irmeyi istediklerini anlatt\u0131. Sara\u00e7o\u011flu \u015funlar\u0131 s\u00f6yledi: &#8220;Sel\u00e7uk \u00dcniversitesi ile 75.4 megawatl\u0131k bir GES projesi haz\u0131rlad\u0131k. Sel\u00e7uk \u00dcniversitesi&#8217;nin kendi arazisi kullan\u0131lacak. Bu kapasitenin 25 megawatl\u0131k k\u0131sm\u0131n\u0131 \u00fcniversite kendisi kullanacak kalan k\u0131sm\u0131yla \u00fcretilecek elektrik \u00fcniversitenin de ortakl\u0131\u011f\u0131yla d\u0131\u015far\u0131ya sat\u0131lacak. \u00dcniversite y\u00f6netimi hadi ba\u015flay\u0131n dedi\u011fi anda ba\u015flayabilecek durumday\u0131z.&#8221;<\/p>\n<p style=\"color: #555555;\"><span style=\"font-weight: bold;\">Chip ve h\u00fccre \u00fcretimi yolda<\/span><\/p>\n<p style=\"color: #555555;\">T\u00fcrkiye&#8217;de chip ve h\u00fccre \u00fcretimi i\u00e7in de harekete ge\u00e7tiklerini ifade TESKOOP Ba\u015fkan\u0131 \u00dcmit Sara\u00e7o\u011flu \u015f\u00f6yle konu\u015ftu: &#8220;G\u00fcne\u015f enerjisi alan\u0131nda \u00fclke olarak d\u00fcnyan\u0131n \u00e7ok gerisindeyiz. \u00dclkemizde panel \u00fcretiyorum diyen \u00e7o\u011fu firma asl\u0131nda montajc\u0131d\u0131r. Seydi\u015fehir Belediyesi&#8217;nin bize vermi\u015f oldu\u011fu 100 d\u00f6n\u00fcml\u00fck araziye y\u0131ll\u0131k kapasitesi 500 megawatl\u0131k chip ve h\u00fccre fabrikas\u0131 i\u00e7in projemizi haz\u0131rlad\u0131k. Bu projeyi Kalk\u0131nma Bakanl\u0131\u011f\u0131 ve T\u00fcrk \u0130nvestable&#8217;a sunaca\u011f\u0131z. Projemiz onayland\u0131\u011f\u0131nda \u00fcretim i\u00e7in hemen d\u00fc\u011fmeye basaca\u011f\u0131z. Bu tesisin \u015fu anki yat\u0131r\u0131m b\u00fct\u00e7esi 150 milyon dolar civar\u0131nda.&#8221;<\/p>\n<p style=\"color: #555555;\"><span style=\"font-weight: bold;\">Yenilenebilir enerji kooperatifleri birli\u011fi yolda<\/span><\/p>\n<p style=\"color: #555555;\">Ticaret G\u00fcmr\u00fck Bakanl\u0131\u011f\u0131&#8217;na ba\u011fl\u0131 Kooperatif\u00e7ilik Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc onay\u0131 ile kurulan ve T\u00fcrkiye&#8217;nin ilk yenilenebilir enerji kooperatifi unvan\u0131na sahip Temiz Enerji Sanayi Kooperatifi (TESKOOP) 2015 y\u0131l\u0131 sonlar\u0131nda faaliyete ge\u00e7ti. Gaziantep&#8217;te faaliyet g\u00f6steren Temiz Enerji Sanayi Kooperatifi (TESKOOP), di\u011fer illerde de benzeri kooperatiflerin kurulu\u015funa \u00f6n ayak oluyor. TESKOOP Ba\u015fkan\u0131 \u00dcmit Sara\u00e7o\u011flu, Kilis, Adana, Ni\u011fde, Mersin, Antalya ve \u0130stanbul kooperatiflerinin kurulmas\u0131yla bir \u00fcst birlik \u00e7at\u0131s\u0131 alt\u0131nda toplanacakt\u0131r.<\/p>\n<p style=\"color: #555555;\">Kaynak: <a href=\"http:\/\/www.dunya.com\/yurttan-haberler\/teskoop-konya-seydisehirde-1704-mwlik-gunes-santrali-kuracak-haberi-328941\" target=\"_blank\" rel=\"nofollow\">D\u00fcnya<\/a><\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Seydi\u015fehir Belediyesi ile Temiz Enerji Sanayi Kooperatifi ortakl\u0131\u011f\u0131yla T\u00fcrkiye&#8217;nin en b\u00fcy\u00fck g\u00fcne\u015f enerji santrali kurulumunu ger\u00e7ekle\u015ftirecek. T\u00fcrkiye&#8217;nin ilk yenilenebilir enerji kooperatifi unvan\u0131na sahip [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":51895,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[63,67,1009,2698,165,2326,227,13,2569,23133,22975,2401,4269,2441,31482,31483,31481,31484],"views":1134,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/57299"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=57299"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/57299\/revisions"}],"predecessor-version":[{"id":57300,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/57299\/revisions\/57300"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/51895"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=57299"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=57299"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=57299"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}