{"id":57022,"date":"2016-08-31T14:01:06","date_gmt":"2016-08-31T11:01:06","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=57022"},"modified":"2016-08-31T14:04:55","modified_gmt":"2016-08-31T11:04:55","slug":"malatya-belediyesi-yenilebilir-enerjiden-40-mw-elektrik-uretimi-saglayacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/malatya-belediyesi-yenilebilir-enerjiden-40-mw-elektrik-uretimi-saglayacak\/","title":{"rendered":"(Turkish) Malatya Belediyesi Yenilebilir Enerji&#8217;den 40 MW Elektrik Sa\u011flayacak&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/57022\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\"><strong>Malatya B\u00fcy\u00fck\u015fehir Belediyesi, su, g\u00fcne\u015f ve r\u00fczgar gibi yenilebilir enerji kaynaklar\u0131ndan yakla\u015f\u0131k 40 megawatt elektrik \u00fcretimi sa\u011flamay\u0131 hedeflemektedir.<\/strong><span id=\"more-83349\"><\/span><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Belediye&#8217;nin a\u00e7\u0131klamas\u0131nda, Malatya B\u00fcy\u00fck\u015fehir Belediyesi 2016 ve 2017 y\u0131llar\u0131nda yenilenebilir enerji alan\u0131nda su, g\u00fcne\u015f ve r\u00fczgardan elektrik \u00fcretimiyle ilgili olarak 6 proje i\u00e7in \u00e7al\u0131\u015fma ba\u015flatt\u0131.<img loading=\"lazy\" class=\"alignright  wp-image-47759\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/alternatif-enerji-yenilenebilir-enerji-rusya-500x500_c-300x300.jpg\" alt=\"alternatif-enerji-yenilenebilir-enerji-rusya-500x500_c\" width=\"300\" height=\"184\" \/><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Malatya B\u00fcy\u00fck\u015fehir Belediyesi Fen \u0130\u015fleri Daire Ba\u015fkanl\u0131\u011f\u0131 taraf\u0131ndan ana isale hatt\u0131 \u00fczerinde kurulmas\u0131 planlanan 2 Hidro Elektrik Santrali \u2018nin (HES) proje ihalesi de\u00a0ger\u00e7ekle\u015ftirildi.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Malatya B\u00fcy\u00fck\u015fehir Belediyesi Su ve Kanalizasyon \u0130daresi (MASK\u0130) isale hatt\u0131 projesinin netle\u015fmesinin ard\u0131ndan MOTA\u015e taraf\u0131ndan ger\u00e7ekle\u015ftirilecek, 3,6 megawatt g\u00fcc\u00fcndeki 2 HES tesisinde y\u0131ll\u0131k 27 milyon 150 bin kilowatt saat \u00fcretmesi planlanmaktad\u0131r.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">B\u00fcy\u00fck\u015fehir belediyesi ayr\u0131ca g\u00fcne\u015ften elektrik \u00fcretimi i\u00e7in 3 proje haz\u0131rland\u0131. \u015eehir Mezarl\u0131\u011f\u0131 mevkisinde 60 bin ve 120 bin metrekarelik alanlarda haz\u0131rlanan proje kapsam\u0131nda, 9 megawatt elektrik \u00fcretimi hedefleniyor. Da\u011f\u0131t\u0131m \u015firketinden \u00e7a\u011fr\u0131 mektubu al\u0131narak gerekli projeler, TEDA\u015e Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc\u2019ne sunuldu. B\u00fcy\u00fck\u015fehir belediyesi bu projelerden en az birini 2017 y\u0131l\u0131nda tamamlayarak hizmete alacakt\u0131r.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">B\u00fcy\u00fck\u015fehir Belediyesi ayr\u0131ca Tramb\u00fcs Bak\u0131m \u0130stasyonu \u00fczerine kurdu\u011fu GES\u2019ten y\u00fcksek verim al\u0131nmas\u0131 \u00fczerine Hal Binas\u0131 \u00e7at\u0131s\u0131na da GES kurulmas\u0131 i\u00e7in \u00e7al\u0131\u015fma ba\u015flatt\u0131. 17 bin metrekarelik \u00e7at\u0131ya 2 megawatt g\u00fcc\u00fcnde GES tesisi kurulumu i\u00e7in da\u011f\u0131t\u0131m \u015firketine gerekli ba\u015fvurular\u0131 ise yap\u0131ld\u0131.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Bu \u00fc\u00e7 GES projesinden y\u0131ll\u0131k 40 milyon kilowatt saat elektrik \u00fcretimi sa\u011flanacakt\u0131r.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">\u0130lin fazla r\u00fczgar alan b\u00f6lgelerinden Arapgir il\u00e7e merkezinde de 2 farkl\u0131 b\u00f6lgede R\u00fczgar Enerji Santrali (RES) kuracak. Fizibilite \u00e7al\u0131\u015fmalar\u0131n\u0131n tamamland\u0131\u011f\u0131 RES projesiyle ilgili da\u011f\u0131t\u0131m \u015firketine gerekli ba\u015fvurular yap\u0131lacak. 2 RES projesinden 8 megawatt elektrik \u00fcretimi\u00a0planlanmaktad\u0131r.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">B\u00fcy\u00fck\u015fehir Belediyesi, yenilenebilir elektrik \u00fcretiminin ilkini Orduzu b\u00f6lgesindeki eski \u00e7\u00f6p alan\u0131nda kurdu\u011fu \u00c7\u00f6pgaz Elektrik Santrali\u2019nde ger\u00e7ekle\u015ftirdi. Burada kurulan elektrik santralinde 2 megawatt\u0131n \u00fczerinde elektrik \u00fcretiliyor. Ayr\u0131ca yap\u0131m \u00e7al\u0131\u015fmalar\u0131 devam eden Malatya \u00c7evre Entegre Projesinde de 10 megawattn \u00fczerinde elektrik \u00fcretiminin yap\u0131laca\u011f\u0131 belirtildi.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Malatya B\u00fcy\u00fck\u015fehir Belediyesi gerek mevcut santraller ve gerekse de projelendirdi\u011fi di\u011fer elektrik \u00fcretim santralleri ile 40 megawatt civar\u0131nda elektrik \u00fcretimi\u00a0ger\u00e7ekle\u015ftirmeyi planlamaktad\u0131r.<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Malatya B\u00fcy\u00fck\u015fehir Belediyesi, su, g\u00fcne\u015f ve r\u00fczgar gibi yenilebilir enerji kaynaklar\u0131ndan yakla\u015f\u0131k 40 megawatt elektrik \u00fcretimi sa\u011flamay\u0131 hedeflemektedir. Belediye&#8217;nin a\u00e7\u0131klamas\u0131nda, Malatya B\u00fcy\u00fck\u015fehir [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":47759,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53,49,47,50],"tags":[63,67,1009,2698,165,227,679,35370,31342,28105,31343,474,69,99,1216,12819,105],"views":1003,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/57022"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=57022"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/57022\/revisions"}],"predecessor-version":[{"id":57025,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/57022\/revisions\/57025"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/47759"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=57022"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=57022"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=57022"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}