{"id":56967,"date":"2016-08-29T17:41:02","date_gmt":"2016-08-29T14:41:02","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=56967"},"modified":"2016-08-29T17:42:17","modified_gmt":"2016-08-29T14:42:17","slug":"cin-turkiyede-116-megavatlik-dev-gunes-yatirimi-yapacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/cin-turkiyede-116-megavatlik-dev-gunes-yatirimi-yapacak\/","title":{"rendered":"(Turkish) \u00c7in T\u00fcrkiye\u2019de 116 Megavatl\u0131k Dev G\u00fcne\u015f Yat\u0131r\u0131m\u0131 Yapacak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/56967\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\"><strong>T\u00fcrk enerji \u015firketi UCK Grup ile \u00c7inli orta\u011f\u0131 Bal\u0131kesir\u2019de 6 mw\u00a0olmak \u00fczere, Ege ve Marmara b\u00f6lgelerinde toplam da 116 megavatl\u0131k g\u00fcne\u015f enerjisi yat\u0131r\u0131m\u0131 ger\u00e7ekle\u015ftirecek.<\/strong><span id=\"more-83308\"><\/span><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Yap\u0131lan a\u00e7\u0131klamada, 116 megavatl\u0131k lisanss\u0131z g\u00fcne\u015f enerjisi projesi, 10 y\u0131l boyunca kilovatsaat ba\u015f\u0131na 13,4 dolar\/cent al\u0131m <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/gunes-santrali-ges-tarlasi-kurmak-istiyorum-peki-nereden-baslamaliyim.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-51895\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/gunes-santrali-ges-tarlasi-kurmak-istiyorum-peki-nereden-baslamaliyim-300x189.jpg\" alt=\"gunes-santrali-ges-tarlasi\" width=\"300\" height=\"189\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/gunes-santrali-ges-tarlasi-kurmak-istiyorum-peki-nereden-baslamaliyim-300x189.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/gunes-santrali-ges-tarlasi-kurmak-istiyorum-peki-nereden-baslamaliyim-500x316.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/gunes-santrali-ges-tarlasi-kurmak-istiyorum-peki-nereden-baslamaliyim-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/04\/gunes-santrali-ges-tarlasi-kurmak-istiyorum-peki-nereden-baslamaliyim.jpg 765w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>garantisi kapsam\u0131nda olacakt\u0131r. \u00c7inli \u015firketin y\u00fcksek verimli g\u00fcne\u015f mod\u00fcl\u00fc ve teknik ekipmanlar\u0131 temin edece\u011fi bu projede, T\u00fcrk \u015firket ise proje geli\u015ftirme s\u00fcreci ve santrallerin yap\u0131m i\u015fini \u00fcstlenecektir.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Proje kapsam\u0131nda en b\u00fcy\u00fck yat\u0131r\u0131m 54 megavatla \u0130zmir\u2019e, ard\u0131ndan 43 megavatla Manisa\u2019ya yap\u0131lacakt\u0131r. Kalan yat\u0131r\u0131mlar\u0131n 7 megavat\u0131 U\u015fak\u2019a, 6 megavat\u0131 Bal\u0131kesir\u2019e, 3\u2019er megavatl\u0131k k\u0131sm\u0131 ise Denizli ve Bilecik\u2019te ger\u00e7ekle\u015ftirilecektir.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Yap\u0131lan a\u00e7\u0131klamada, toplam 116 megavat olarak yap\u0131lmas\u0131 planlanan yat\u0131r\u0131m\u0131n 70 megavat\u0131na ili\u015fkin projenin y\u0131l sonuna kadar tamamlanaca\u011f\u0131 belirtildi.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrk enerji \u015firketi UCK Grup ile \u00c7inli orta\u011f\u0131 Bal\u0131kesir\u2019de 6 mw\u00a0olmak \u00fczere, Ege ve Marmara b\u00f6lgelerinde toplam da 116 megavatl\u0131k g\u00fcne\u015f enerjisi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":51895,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[886,26184,31313,63,67,1009,2698,165,2326,227,13,2569,431,23133,22975,4269,846,31314,31315],"views":1063,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/56967"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=56967"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/56967\/revisions"}],"predecessor-version":[{"id":56969,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/56967\/revisions\/56969"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/51895"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=56967"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=56967"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=56967"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}