{"id":56940,"date":"2016-08-28T14:36:46","date_gmt":"2016-08-28T11:36:46","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=56940"},"modified":"2016-08-28T14:36:46","modified_gmt":"2016-08-28T11:36:46","slug":"kirklareli-babaeskide-biyogaz-santrali-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kirklareli-babaeskide-biyogaz-santrali-kurulacak\/","title":{"rendered":"(Turkish) K\u0131rklareli Babaeski&#8217;de Biyogaz Santrali Kurulacak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/56940\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>K\u0131rklareli\u2019nin Babaeski il\u00e7esi Kumrular K\u00f6y\u00fc Koca G\u00f6l Mevkii\u2019nde 4.3 MW\u2019lik elektrik santralini de i\u00e7eren biyok\u00fctle\u00a0enerji tesisi kurulumu yap\u0131lacakt\u0131r.<\/strong><\/p>\n<p>Seleda Biyogaz Enerji Sanayi ve Ticaret Anonim \u015eirketi taraf\u0131ndan K\u0131rklareli\u2019nin Babaeski \u0130l\u00e7esi Kumrular K\u00f6y\u00fc Koca G\u00f6l mevkii\u2019ndeki 138.7 bin metrekarelik tarla vasf\u0131ndaki araziye, yenilenebilir kaynaklara dayal\u0131 bir enerj<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/08\/kirklareli-babaeskide-biyogaz-santrali-kurulacak.jpg\"><img loading=\"lazy\" class=\"alignright size-full wp-image-56941\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/08\/kirklareli-babaeskide-biyogaz-santrali-kurulacak.jpg\" alt=\"kirklareli-babaeskide-biyogaz-santrali-kurulacak\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/08\/kirklareli-babaeskide-biyogaz-santrali-kurulacak.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/08\/kirklareli-babaeskide-biyogaz-santrali-kurulacak-75x50.jpg 75w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>i santrali kurulacakt\u0131r.\u00a0Proje ile \u00a0Selena Biyogaz Enerji A\u015e, kendi m\u00fclkiyetindeki s\u00f6z konusu arazide kuraca\u011f\u0131 tesislerde, hayvansal at\u0131klardan ve taze bitkilerden biyogaz, bu biyogazdan elektrik ve g\u00fcbre \u00fcretimi ger\u00e7ekle\u015ftirecektir.<\/p>\n<p><strong>YILDA 34.2 B\u0130N MWH ELEKTR\u0130K \u00dcRET\u0130M\u0130<\/strong><\/p>\n<p>Proje ile\u00a0y\u0131lda br\u00fct 34 bin 144 MWh elektrik enerjisi \u00fcretimi, y\u0131ll\u0131k br\u00fct 35 bin 392 MWh kar\u015f\u0131l\u0131\u011f\u0131 \u0131s\u0131 (s\u0131cak su + buhar) \u00fcretimi, y\u0131lda 2 bin 810 ton\/y\u0131l paketlenmi\u015f kat\u0131 g\u00fcbre \u00fcretimi ve 20 bin 148 ton\/y\u0131l ar\u0131t\u0131lm\u0131\u015f s\u0131v\u0131 fermente \u00fcr\u00fcn de\u015farj\u0131 yap\u0131lmas\u0131 planlanmaktad\u0131r.<\/p>\n<p><strong>\u00c7\u0130FT\u00c7\u0130LERDEN B\u0130TK\u0130SEL ATIKLAR ALINACAK<\/strong><\/p>\n<p>B\u00f6lgede faaliyet g\u00f6steren \u00e7ift\u00e7ilerden tesislerde i\u015flenmek \u00fczere taze bitkisel girdi al\u0131nacakt\u0131r. Bunlar\u0131n aras\u0131nda \u015feker pancar\u0131 at\u0131klar\u0131 ile m\u0131s\u0131r ve arpa samanlar\u0131 da yer alacakt\u0131r. Sera ve hal at\u0131klar\u0131 da d\u00fc\u015f\u00fcn\u00fclmektedir. Tesisler i\u00e7in toplamda 29 bin 690,4 metrekarelik bir in\u015faat \u00e7al\u0131\u015fmas\u0131 yap\u0131lacakt\u0131r. \u00a0Ayr\u0131ca b\u00f6lgede yer alan b\u00fcy\u00fckba\u015f hayvan yeti\u015ftiricili\u011fi yapan \u00e7iftliklerden sa\u011fmal inek d\u0131\u015fk\u0131s\u0131 ve yine b\u00f6lgede faaliyet g\u00f6steren tavuk \u00e7iftliklerinden tavuk d\u0131\u015fk\u0131s\u0131 temin edilecektir. Tesiste 80 ton\/g\u00fcn sa\u011fmal inek d\u0131\u015fk\u0131s\u0131 ve 10 ton\/g\u00fcn tavuk d\u0131\u015fk\u0131s\u0131 i\u015flenecektir. At\u0131k ve d\u0131\u015fk\u0131lardan elde edilecek biyogaz Kojenerasyon \u00dcnitesinde yak\u0131larak elektrik enerjisine d\u00f6n\u00fc\u015ft\u00fcr\u00fclecektir.<\/p>\n<p><strong>40 M\u0130LYON TL&#8217;L\u0130K YATIRIM<\/strong><\/p>\n<p>Seleda Biyogaz Tesisleri, 40 milyon TL\u2019nin \u00fczerinde bir harcama ile faaliyete ge\u00e7irilecektir. Ekim ay\u0131 ba\u015flar\u0131nda\u00a0temeli at\u0131lmas\u0131 planlanan\u00a0projenin, Haziran ay\u0131nda ise \u00fcretime ge\u00e7mesi\u00a0hedeflenmektedir. \u00dcretim i\u00e7in May\u0131s 2017\u2019de g\u00fcbre ve bitkisel at\u0131k tedarik edilmeye ba\u015flanacakt\u0131r.<\/p>\n<p>Kaynak: Enerji G\u00fcnl\u00fc\u011f\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.K\u0131rklareli\u2019nin Babaeski il\u00e7esi Kumrular K\u00f6y\u00fc Koca G\u00f6l Mevkii\u2019nde 4.3 MW\u2019lik elektrik santralini de i\u00e7eren biyok\u00fctle\u00a0enerji tesisi kurulumu yap\u0131lacakt\u0131r. Seleda Biyogaz Enerji Sanayi ve [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":56941,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,53],"tags":[640,641,1678,31304,63,67,1009,2698,165,17392,17393,3955,31302,31303,3629],"views":3598,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/56940"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=56940"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/56940\/revisions"}],"predecessor-version":[{"id":56942,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/56940\/revisions\/56942"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/56941"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=56940"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=56940"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=56940"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}