{"id":56935,"date":"2016-08-28T14:24:46","date_gmt":"2016-08-28T11:24:46","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=56935"},"modified":"2016-08-28T14:26:14","modified_gmt":"2016-08-28T11:26:14","slug":"tekno-ruzgar-balikesire-44-mw-gucunde-res-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/tekno-ruzgar-balikesire-44-mw-gucunde-res-kuracak\/","title":{"rendered":"(Turkish) Tekno R\u00fczgar, Bal\u0131kesir&#8217;e 44 MW G\u00fcc\u00fcnde RES Kuracak&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/56935\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Tekno R\u00fczgar Bal\u0131kesir&#8217;e 44 MW g\u00fcc\u00fcnde \u00a0Pazark\u00f6y RES kuracak.<\/strong><\/p>\n<p>Tekno R\u00fczgar Enerji Yat\u0131r\u0131m \u00dcretim ve Ticaret A.\u015e., Bal\u0131kesir&#8217;in Balya il\u00e7esi Ku\u015fkemikatan Tepe, T\u0131\u011fl\u0131 Tepe, K\u00fc\u00e7\u00fcksalman Tepe, Somakl\u0131 Tep<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/10\/r\u00fczgar-enerjisi-santrali-32732798983.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-32847\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/10\/r\u00fczgar-enerjisi-santrali-32732798983-300x165.jpg\" alt=\"r\u00fczgar-enerjisi-santrali-32732798983\" width=\"300\" height=\"165\" \/><\/a>e, Gavur\u00e7al Tepe, \u015eahin Kayas\u0131, Bakla\u00e7al Da\u011f\u0131, Koca\u00e7al Tepe ve P\u0131nal\u00e7al Tepe mevkiinde 44 MW&#8217;l\u0131k Pazark\u00f6y R\u00fczgar Enerji Santrali kuracakt\u0131r.<\/p>\n<p>160 Milyon TL maliyeti olan proje kapsam\u0131nda 10 adet 3,2 MW ve 4 adet 3 MW olmak \u00fczere toplam 14 adet GE ve Nordex r\u00fczgar t\u00fcrbinleri kurulacakt\u0131r. T\u00fcrbinlerin on adedi \u00c7anakkale ili s\u0131n\u0131rlar\u0131 i\u00e7inde, d\u00f6rt tanesi de Bal\u0131kesir ili s\u0131n\u0131rlar\u0131 i\u00e7inde kalacakt\u0131r. Proje kapsam\u0131nda 1 adet \u015fantiye sahas\u0131 ve 1 adet \u015falt sahas\u0131 yap\u0131m\u0131 ger\u00e7ekle\u015ftirilecektir.<\/p>\n<p>Tesiste y\u0131lda 162.000.000 kWh\/y\u0131l enerji \u00fcretilmesi ve \u00fcretilen elektri\u011fin tek hat \u015femas\u0131na uygun olarak G\u00f6nen TM 154 kV y\u00fcksek gerilim ba\u011flant\u0131 noktas\u0131na ba\u011flanmas\u0131\u00a0planlanmaktad\u0131r. Pazark\u00f6y RES projesi ile ilgili olarak \u00c7ED s\u00fcrecine de ba\u015fland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Tekno R\u00fczgar Bal\u0131kesir&#8217;e 44 MW g\u00fcc\u00fcnde \u00a0Pazark\u00f6y RES kuracak. Tekno R\u00fczgar Enerji Yat\u0131r\u0131m \u00dcretim ve Ticaret A.\u015e., Bal\u0131kesir&#8217;in Balya il\u00e7esi Ku\u015fkemikatan Tepe, T\u0131\u011fl\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[3613,5927,63,67,1009,2698,165,31301,474,22653,69,16,23318,22615,4784,31299,31300],"views":1884,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/56935"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=56935"}],"version-history":[{"count":4,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/56935\/revisions"}],"predecessor-version":[{"id":56939,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/56935\/revisions\/56939"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=56935"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=56935"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=56935"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}