{"id":56889,"date":"2016-08-26T15:56:54","date_gmt":"2016-08-26T12:56:54","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=56889"},"modified":"2016-08-26T16:20:54","modified_gmt":"2016-08-26T13:20:54","slug":"misir-hukumetiden-1-gwlik-gunes-projesi-icin-imza","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/misir-hukumetiden-1-gwlik-gunes-projesi-icin-imza\/","title":{"rendered":"(Turkish) M\u0131s\u0131r H\u00fck\u00fcmeti&#8217;nden 1 GW\u2019l\u0131k G\u00fcne\u015f Projesine \u0130mza&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/56889\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #222222;\"><strong>M\u0131s\u0131r h\u00fck\u00fcmeti, \u00c7in\u2019in en b\u00fcy\u00fck enerji m\u00fchendisli\u011fi \u015firketlerinden TBEA SunOasis ile\u00a0bir mutabakat anla\u015fmas\u0131\u00a0yapt\u0131.<\/strong><\/p>\n<p style=\"color: #222222;\">M\u0131s\u0131r Uluslararas\u0131 \u0130\u015fbirli\u011fi Bakanl\u0131\u011f\u0131&#8217;n\u0131n a\u00e7\u0131klamas\u0131nda 27 Temmuz 2016 tarihinde M\u0131s\u0131r\u2019\u0131n ba\u015fkenti Kahire\u2019de imzalanan anla\u015fma TBEA\u2019n\u0131n M\u0131s\u0131r\u2019da her biri 500 MW g\u00fcc\u00fcnde olacak iki ayr\u0131 g\u00fcne\u015f enerjisi santrali kurmas\u0131n\u0131 ay<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/08\/misir-hukumetiden-1-gwlik-gunes-projesi-icin-imza.jpg\"><img loading=\"lazy\" class=\"alignright  wp-image-56895\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/08\/misir-hukumetiden-1-gwlik-gunes-projesi-icin-imza-300x150.jpg\" alt=\"misir-hukumetiden-1-gwlik-gunes-projesi-icin-imza\" width=\"300\" height=\"203\" \/><\/a>r\u0131ca M\u0131s\u0131r\u2019\u0131n yerli g\u00fcne\u015f enerjisi sanayisi olu\u015fturma \u00e7abalar\u0131na katk\u0131 sa\u011flamas\u0131n\u0131\u00a0da i\u00e7ermektedir.<\/p>\n<p style=\"color: #222222;\">Anla\u015fmay\u0131 M\u0131s\u0131r h\u00fck\u00fcmeti ad\u0131na \u00fclkenin Uluslararas\u0131 \u0130\u015fbirli\u011fi Bakan\u0131 Sahar Nasr, Askeri \u00dcretim Bakan\u0131 Mohamed El-Assar ve TBEA SunOasis ad\u0131na ise \u015firketin CEO\u2019su Shin Bin imzalad\u0131.<br \/>\nBakanl\u0131\u011fa g\u00f6re TBEA anla\u015fma kapsam\u0131nda M\u0131s\u0131r\u2019da her biri 500 MW g\u00fcc\u00fcnde olacak iki ayr\u0131 g\u00fcne\u015f enerjisi santrali kuracak ve M\u0131s\u0131r\u2019\u0131n yerli g\u00fcne\u015f enerjisi sanayisi olu\u015fturma \u00e7abalar\u0131na katk\u0131 sa\u011flayacakt\u0131r.<\/p>\n<p style=\"color: #222222;\">Uluslararas\u0131 \u0130\u015fbirli\u011fi Bakanl\u0131\u011f\u0131 ise gerek santrallerin devreye girmesi, gerek ise sanayi faaliyetleri i\u00e7in fizibilite \u00e7al\u0131\u015fmalar\u0131n\u0131n y\u00fcr\u00fct\u00fclmesi ve bu projelere finansman sa\u011flanmas\u0131 konusunda katk\u0131 sa\u011flayacakt\u0131r.<br \/>\nA\u00e7\u0131klamada de\u011ferlendirmesi yer alan M\u0131s\u0131r Uluslararas\u0131 \u0130\u015fbirli\u011fi Bakan\u0131 Sahar Nasr geli\u015ftirdikleri i\u015fbirli\u011finin M\u0131s\u0131r\u2019\u0131n g\u00fcne\u015f enerjisi sanayisinde kuantum s\u0131\u00e7ramas\u0131 ya\u015famas\u0131n\u0131 sa\u011flayaca\u011f\u0131n\u0131, ayr\u0131ca M\u0131s\u0131r\u2019\u0131n g\u00fcne\u015f enerjisi alan\u0131nda ba\u015fka \u00fclkeler ile i\u015fbirli\u011finde bulunmaya ve kalk\u0131nma projeleri geli\u015ftirmeye y\u00f6nelik yeni ufuklar a\u00e7aca\u011f\u0131n\u0131 kaydetti.<\/p>\n<p style=\"color: #222222;\">Askeri \u00dcretim Bakan\u0131 Mohamed El-Assar ise a\u00e7\u0131klamas\u0131nda anla\u015fma kapsam\u0131nda h\u00fccre ve panel \u00fcretim fabrikas\u0131 kurulaca\u011f\u0131 bilgisini verirken bakanl\u0131\u011f\u0131n\u0131n y\u00fcksek insan ve end\u00fcstriyel kaynaklar\u0131 ile bu projelere destek sa\u011flayaca\u011f\u0131\u00a0da ifade edildi.<\/p>\n<p style=\"color: #222222;\">Urum\u00e7i, \u00c7in merkezli TBEA SunOasis 2000 y\u0131l\u0131nda kurulmu\u015f bir \u015firket. \u015eirket hali haz\u0131rda polisilikon, invert\u00f6r ve g\u00fcne\u015f paneli \u00fcretimi gibi sanayi faaliyetlerinin yan\u0131s\u0131ra, r\u00fczgar ve g\u00fcne\u015f enerjisi projeleri i\u00e7in EPC hizmeti\u00a0de sunmaktad\u0131r.<\/p>\n<p style=\"color: #222222;\">Wiki-Solar&#8217;\u0131n verilerine g\u00f6re \u015firket \u015fu ana\u00a0kadar toplamda 525 MW g\u00fcc\u00fcnde 17 b\u00fcy\u00fck \u00f6l\u00e7ekli g\u00fcne\u015f enerjisi santrali devreye alm\u0131\u015ft\u0131r.<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. M\u0131s\u0131r h\u00fck\u00fcmeti, \u00c7in\u2019in en b\u00fcy\u00fck enerji m\u00fchendisli\u011fi \u015firketlerinden TBEA SunOasis ile\u00a0bir mutabakat anla\u015fmas\u0131\u00a0yapt\u0131. M\u0131s\u0131r Uluslararas\u0131 \u0130\u015fbirli\u011fi Bakanl\u0131\u011f\u0131&#8217;n\u0131n a\u00e7\u0131klamas\u0131nda 27 Temmuz 2016 tarihinde [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":56895,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[63,67,1009,2698,165,2326,227,13,2569,23133,22975,10181,2401,4269,3352,31289,31290],"views":975,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/56889"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=56889"}],"version-history":[{"count":5,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/56889\/revisions"}],"predecessor-version":[{"id":56897,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/56889\/revisions\/56897"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/56895"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=56889"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=56889"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=56889"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}