{"id":56822,"date":"2016-08-25T02:20:36","date_gmt":"2016-08-24T23:20:36","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=56822"},"modified":"2016-08-25T02:20:36","modified_gmt":"2016-08-24T23:20:36","slug":"fortumdan-ingiltereye-299-mwlik-biyokutle-santrali","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/fortumdan-ingiltereye-299-mwlik-biyokutle-santrali\/","title":{"rendered":"(Turkish) Fortum&#8217;dan \u0130ngiltere&#8217;ye 299 MW&#8217;l\u0131k Biyok\u00fctle Santrali&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/56822\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Finlandiyal\u0131 Fortum taraf\u0131ndan \u0130ngiltere&#8217;ye 299 MW&#8217;l\u0131k biyok\u00fctle yak\u0131tl\u0131 kombine \u0131s\u0131 ve elektrik santrali kurulumu yap\u0131lacakt\u0131r.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/08\/fortumdan-ingiltereye-299-mwlik-biyokutle-santrali.jpg\"><img loading=\"lazy\" class=\"alignright size-full wp-image-56823\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/08\/fortumdan-ingiltereye-299-mwlik-biyokutle-santrali.jpg\" alt=\"fortumdan-ingiltereye-299-mwlik-biyokutle-santrali\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/08\/fortumdan-ingiltereye-299-mwlik-biyokutle-santrali.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/08\/fortumdan-ingiltereye-299-mwlik-biyokutle-santrali-75x50.jpg 75w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><\/p>\n<p>Fortum, \u0130ngiltere&#8217;nin Kuzeydo\u011fusunda bulunan 299 MW&#8217;l\u0131k Tees biyok\u00fctle yak\u0131tl\u0131 kombine \u0131s\u0131 ve elektrik santralinin kurulum, bak\u0131m, onar\u0131m ve i\u015fletilmesi i\u00e7in on y\u0131ll\u0131k bir anla\u015fma\u00a0imzaland\u0131\u011f\u0131n\u0131n a\u00e7\u0131klamas\u0131n\u0131 yapt\u0131.<\/p>\n<p>A\u00e7\u0131klamaya g\u00f6re, santralin in\u015faat\u0131na hemen ba\u015flanarak\u00a02020 y\u0131l\u0131n\u0131n sonuna kadar tamamlanacakt\u0131r. Anla\u015fman\u0131n de\u011feri hakk\u0131nda ise hen\u00fcz\u00a0bir a\u00e7\u0131klama\u00a0gelmedi.<\/p>\n<p>Fortum firmas\u0131 yapt\u0131\u011f\u0131 \u00e7al\u0131\u015fmalarda biyok\u00fctleyi \u00f6nemli oranda kullanmaktad\u0131r. 2015 y\u0131l\u0131nda \u015firketin elektrik ve \u0131s\u0131 santrallerinde toplam 2.6 milyon metrek\u00fcp biyok\u00fctle kullan\u0131lm\u0131\u015ft\u0131r. Biyok\u00fctle \u015firketin AB b\u00f6lgesi \u0131s\u0131tma yak\u0131tlar\u0131n\u0131n d\u00f6rtte birlik k\u0131sm\u0131n\u0131 olu\u015fturmaktad\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Finlandiyal\u0131 Fortum taraf\u0131ndan \u0130ngiltere&#8217;ye 299 MW&#8217;l\u0131k biyok\u00fctle yak\u0131tl\u0131 kombine \u0131s\u0131 ve elektrik santrali kurulumu yap\u0131lacakt\u0131r. Fortum, \u0130ngiltere&#8217;nin Kuzeydo\u011fusunda bulunan 299 MW&#8217;l\u0131k Tees biyok\u00fctle [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":56823,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,53],"tags":[1678,1484,63,67,1009,2698,165,20035,1092,842,105],"views":1326,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/56822"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=56822"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/56822\/revisions"}],"predecessor-version":[{"id":56824,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/56822\/revisions\/56824"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/56823"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=56822"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=56822"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=56822"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}