{"id":56476,"date":"2016-08-15T11:43:02","date_gmt":"2016-08-15T08:43:02","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=56476"},"modified":"2016-08-15T11:43:46","modified_gmt":"2016-08-15T08:43:46","slug":"kirgizistan-hes-insaatina-yatirimci-arayisinda","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kirgizistan-hes-insaatina-yatirimci-arayisinda\/","title":{"rendered":"(Turkish) K\u0131rg\u0131zistan HES \u0130n\u015faat\u0131na Yat\u0131r\u0131mc\u0131 Aray\u0131\u015f\u0131nda&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/56476\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\"><strong>K\u0131rg\u0131zistan, Rusya ile enerji alan\u0131ndaki i\u015fbirli\u011fi anla\u015fmas\u0131n\u0131n iptali sonras\u0131 HES in\u015faat\u0131 i\u00e7in projeler geli\u015ftirmeye ba\u015flad\u0131. Cumhurba\u015fkan\u0131 Almazbek Atambayev, HES in\u015faat\u0131 projelerinin yap\u0131m\u0131 i\u00e7in yat\u0131r\u0131mc\u0131 beklediklerini\u00a0ifade etti.<\/strong><span id=\"more-82990\"><\/span><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Cumhurba\u015fkanl\u0131\u011f\u0131 Bas\u0131n Merkezi&#8217;nin a\u00e7\u0131klamas\u0131nda, Atambayev, sonbahar ve k\u0131\u015f d\u00f6neminde sorunsuz elektrik ihtiyac\u0131n\u0131n kar\u015f\u0131lanmas\u0131na y\u00f6nelik konuyu g\u00f6r\u00fc\u015fmek i\u00e7in Milli Enerji Holdingi Ba\u015fkan\u0131 Aybek Kaliyev\u2019i kabul etti.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\"><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/08\/kirgizistan-hes-insaatina-yatirimci-arayisinda.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-56477\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/08\/kirgizistan-hes-insaatina-yatirimci-arayisinda-300x168.jpg\" alt=\"kirgizistan-hes-insaatina-yatirimci-arayisinda\" width=\"300\" height=\"168\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/08\/kirgizistan-hes-insaatina-yatirimci-arayisinda-300x168.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/08\/kirgizistan-hes-insaatina-yatirimci-arayisinda-500x280.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/08\/kirgizistan-hes-insaatina-yatirimci-arayisinda-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/08\/kirgizistan-hes-insaatina-yatirimci-arayisinda.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>Atambayev, h\u00fck\u00fcmetin, enerji sekt\u00f6r\u00fcnde K\u0131rg\u0131zistan ile Rusya aras\u0131ndaki i\u015fbirli\u011fi anla\u015fmas\u0131n\u0131n iptal olmas\u0131n\u0131 g\u00f6z \u00f6n\u00fcnde bulundurarak, \u00fclkede HES in\u015faat\u0131 projelerine aktif bir \u015fekilde yeni yat\u0131r\u0131mc\u0131 aramas\u0131 gerekti\u011fini ifade etti. Atambayev, Enerji Bakanl\u0131\u011f\u0131 yerine kurulan Milli Enerji Holdingin Ba\u015fkan\u0131\u2019na, K\u0131rg\u0131zistan\u2019da hidroelektrik santrallerinin in\u015fas\u0131 ve i\u015fletilmesi i\u00e7in sa\u011flanacak avantajlar\u0131 i\u00e7eren d\u00fczenlemeleri haz\u0131rlamas\u0131 talimat\u0131 verdi.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Ba\u011f\u0131ms\u0131zl\u0131\u011f\u0131na (31 A\u011fustos 1991) kavu\u015ftu\u011fu g\u00fcnden beri \u00fclkede HES in\u015faat\u0131 yapt\u0131rmak isteyen K\u0131rg\u0131zistan, 20 Eyl\u00fcl 2012\u2019de Rusya ile enerji alan\u0131nda i\u015fbirli\u011fi anla\u015fmas\u0131 imzalad\u0131. Rusya, enerji i\u015fbirli\u011fi \u00e7er\u00e7evesinde, \u00fclkenin kuzeyinde Nar\u0131n Nehri \u00fczerine 4 hidroelektrik santralinin ortak yap\u0131m\u0131 ve i\u015fletmesi ve yine \u00fclkenin g\u00fcneyindeki Togtogul Baraj\u0131\u2019ndaki Kambara Ata-1 hidroelektrik santralinin ortak yap\u0131m\u0131 ve i\u015fletmesini \u00fcstlendi. Nar\u0131n Nehri \u00fczerinde baraj in\u015faat\u0131na ba\u015flayan Rusgidro \u015firketi, 3 y\u0131l aradan sonra kaynak s\u0131k\u0131nt\u0131s\u0131 \u00e7ekti\u011fini gerek\u00e7e g\u00f6stererek yat\u0131r\u0131m\u0131n\u0131 durdurdu.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">\u00dclke y\u00f6netimi, in\u015faat\u0131n\u0131 2016\u2019da bitirmeyi planlad\u0131\u011f\u0131 Nar\u0131n nehri \u00fczerinde baraj ve hidroelekrik santrali projesinin gecikmesi \u00fczerine Rusya\u2019y\u0131 \u00e7e\u015fitli bahanelerle vaadini yerine getirmemekle su\u00e7lad\u0131. K\u0131rg\u0131zistan daha sonra Rusya ile olan i\u015fbirli\u011fi anla\u015fmas\u0131n\u0131 ise tek tarafl\u0131 olarak feshetti.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Rusgidro \u015firketinin b\u00f6lgede altyap\u0131 \u00e7al\u0131\u015fmalar\u0131na yakla\u015f\u0131k 37 milyon dolar harcad\u0131\u011f\u0131 ifade ediliyor. Rusya\u2019n\u0131n \u015fimdi de K\u0131rg\u0131zistan\u2019dan bu miktar\u0131 geri istedi\u011fi ileri\u00a0s\u00fcr\u00fclmektedir.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. K\u0131rg\u0131zistan, Rusya ile enerji alan\u0131ndaki i\u015fbirli\u011fi anla\u015fmas\u0131n\u0131n iptali sonras\u0131 HES in\u015faat\u0131 i\u00e7in projeler geli\u015ftirmeye ba\u015flad\u0131. Cumhurba\u015fkan\u0131 Almazbek Atambayev, HES in\u015faat\u0131 projelerinin yap\u0131m\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":56477,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[12978,1990,63,963,67,1009,2698,165,35370,28058,4639,1090,1989,31112],"views":973,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/56476"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=56476"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/56476\/revisions"}],"predecessor-version":[{"id":56479,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/56476\/revisions\/56479"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/56477"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=56476"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=56476"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=56476"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}