{"id":56160,"date":"2016-08-07T11:31:22","date_gmt":"2016-08-07T08:31:22","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=56160"},"modified":"2016-08-07T11:34:04","modified_gmt":"2016-08-07T08:34:04","slug":"borusan-enerji-de-500-milyon-dolarlik-yeni-yatirim-gerceklestirecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/borusan-enerji-de-500-milyon-dolarlik-yeni-yatirim-gerceklestirecek\/","title":{"rendered":"(Turkish) Borusan Enerjide 500 Milyon Dolarl\u0131k Yeni Yat\u0131r\u0131m Ger\u00e7ekle\u015ftirecek&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/56160\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Borusan EnBW Enerji, Alara \u00c7ay\u0131 \u00fczerinde 350 milyon dolarl\u0131k yat\u0131r\u0131mla kurulacak hidroelektrik santrali ve Gelibolu\u2019ya 150-170 milyon dolarl\u0131k yat\u0131r\u0131mla kurulacak r\u00fczgar santrali yat\u0131r\u0131mlar\u0131na\u00a0ba\u015flama haz\u0131rl\u0131\u011f\u0131nda.<\/strong><\/p>\n<p>Enerji sekt\u00f6r\u00fc son 15 y\u0131lda, T\u00fcrkiye ekonomisinin en h\u0131zl\u0131 b\u00fcy\u00fcme ya\u015fanan alanlar\u0131ndan biri oldu. 15 T<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/08\/borusan-enerji-ye-500-milyon-dolarlik-yeni-yatirimlar-yapacak.jpg\"><img loading=\"lazy\" class=\"alignright size-full wp-image-56161\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/08\/borusan-enerji-ye-500-milyon-dolarlik-yeni-yatirimlar-yapacak.jpg\" alt=\"borusan-enerji-ye-500-milyon-dolarlik-yeni-yatirimlar-yapacak\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/08\/borusan-enerji-ye-500-milyon-dolarlik-yeni-yatirimlar-yapacak.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/08\/borusan-enerji-ye-500-milyon-dolarlik-yeni-yatirimlar-yapacak-75x50.jpg 75w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>emmuz 2016\u2019daki askeri darbe giri\u015fimi sonras\u0131nda g\u00f6zler yine hem ulusal hem uluslararas\u0131 \u00f6l\u00e7ekteki projeler \u00e7er\u00e7evesinde enerji sekt\u00f6r\u00fc oyuncular\u0131ndan olan T\u00fcrk-Alman enerji ortakl\u0131\u011f\u0131 Borusan EnBW Enerji\u2019nin Genel M\u00fcd\u00fcr\u00fc Mehmet Acarla son geli\u015fmeler sonras\u0131 durumu ve \u015eirket\u2019in faaliyetleri hakk\u0131nda\u00a0g\u00f6r\u00fc\u015flerini ifade ettiler.<\/p>\n<p>Askeri darbe giri\u015fimi sonras\u0131nda, ellerindeki yat\u0131r\u0131mlarla ilgili en k\u00fc\u00e7\u00fck bir durma, gecikme, ask\u0131ya alman\u0131n s\u00f6z konusu olmad\u0131\u011f\u0131n\u0131 belirten Mehmet Acarla, \u201cBilakis faaliyetlerimize h\u0131zla devam ediyoruz\u201d dedi. Yeni ba\u015flayacak yat\u0131r\u0131mlar\u0131ndan da s\u00f6z eden Acarla, toplam b\u00fcy\u00fckl\u00fc\u011f\u00fc 500 milyon dolar\u0131n \u00fczerinde bir r\u00fczgar ve bir de HES projesine start vermeye haz\u0131rland\u0131klar\u0131n\u0131 da belirttiler.<\/p>\n<p><strong>Yap\u0131lan Enerji Yat\u0131r\u0131mlar\u0131ndan Sat\u0131r Ba\u015flar\u0131&#8230;<\/strong><\/p>\n<p>&#8211; \u015eu an\u00a0yenilenebilir kaynak alanlar\u0131 (YEKA) g\u00fcndemde ve en az\u0131ndan <strong>g\u00fcne\u015f yat\u0131r\u0131mlar\u0131nda<\/strong> bu i\u015f tamamen YEKA&#8217;ya gidiyor. Orada bu f\u0131rsatlar\u0131 de\u011ferlendiriyoruz.<\/p>\n<p>&#8211; Alara \u00c7ay\u0131 \u00fczerindeki \u00fc\u00e7 barajdan olu\u015fan <strong>HES projemizin\u00a0<\/strong>toplam kurulu g\u00fcc\u00fc 186 MW. Fizibilite onay\u0131 \u00e7\u0131ks\u0131n ona g\u00f6re harekete ge\u00e7elim diye beklemekteyiz. Projenin yat\u0131r\u0131m maliyetini yakla\u015f\u0131k 350 milyon dolar olarak\u00a0hesaplanmaktad\u0131r.<\/p>\n<p>&#8211; Gelibolu\u2019daki <strong>r\u00fczgar enerjisi santrali ( RES )<\/strong> projemizin b\u00fcy\u00fckl\u00fc\u011f\u00fc 138 MW. \u00c7ok da de\u011ferli bir proje. R\u00fczgar a\u00e7\u0131s\u0131ndan iyi bir konumdad\u0131r. Yat\u0131r\u0131m bedeli yakla\u015f\u0131k 160-170 milyon dolard\u0131r.<\/p>\n<p>Yay\u0131na Haz\u0131rlayan: Mehmet KARA<\/p>\n<p>Yaz\u0131n\u0131n <a href=\"http:\/\/www.enerjigunlugu.net\/icerik\/19374\/borusandan-enerjiye-500-milyon-dolarlik-yeni-yatirim.html\" target=\"_blank\" rel=\"nofollow\">Devam\u0131 \u0130\u00e7in TIKLAYINIZ&gt;&gt;&gt;<\/a><\/p>\n<p>Kaynak: Enerji G\u00fcnl\u00fc\u011f\u00fc<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Borusan EnBW Enerji, Alara \u00c7ay\u0131 \u00fczerinde 350 milyon dolarl\u0131k yat\u0131r\u0131mla kurulacak hidroelektrik santrali ve Gelibolu\u2019ya 150-170 milyon dolarl\u0131k yat\u0131r\u0131mla kurulacak r\u00fczgar santrali yat\u0131r\u0131mlar\u0131na\u00a0ba\u015flama [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":56161,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49,47,50],"tags":[30987,12706,68,63,67,1009,2698,165,30988,4782,2326,13,2401,35370,70,1090,12707,474,69,16,312],"views":954,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/56160"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=56160"}],"version-history":[{"count":4,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/56160\/revisions"}],"predecessor-version":[{"id":56165,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/56160\/revisions\/56165"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/56161"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=56160"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=56160"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=56160"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}