{"id":55945,"date":"2016-07-31T13:57:12","date_gmt":"2016-07-31T10:57:12","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=55945"},"modified":"2016-07-31T14:01:03","modified_gmt":"2016-07-31T11:01:03","slug":"fransadan-yuzer-ruzgar-santralleri-icin-gelistirme-hamlesi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/fransadan-yuzer-ruzgar-santralleri-icin-gelistirme-hamlesi\/","title":{"rendered":"(Turkish) Fransa\u2019dan Y\u00fczer R\u00fczgar Santralleri \u0130\u00e7in Geli\u015ftirme Hamlesi&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/55945\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Fransa y\u00fczer r\u00fczgar santrallerini geli\u015ftirme hedefi ile a\u00e7\u0131lan\u00a0ihalelerde iki y\u00fczer santral projesi i\u00e7inde\u00a0ruhsat ald\u0131.<\/strong><\/p>\n<p>Fransa \u00c7evre ve Enerji Y\u00f6netimi Ajans\u0131 (ADEME) taraf\u0131ndan ge\u00e7ti\u011fimiz y\u0131l ba\u015flat\u0131lan\u00a0y\u00fczer r\u00fczgar santrallerini geli\u015ftirme program\u0131 \u00e7er\u00e7evesinde a\u00e7\u0131lan ihalelerde iki y\u00fczer santral projesinin de ruhsat\u0131n\u0131 ald\u0131.<\/p>\n<p><img loading=\"lazy\" class=\"alignleft  wp-image-46943\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/avrupaya-bir-yuzer-ruzgar-santrali-daha-300x110.jpg\" alt=\"avrupaya-bir-yuzer-ruzgar-santrali-daha\" width=\"300\" height=\"168\" \/>Ruhsatland\u0131r\u0131lan sahalar\u0131n 24 MW&#8217;l\u0131k ilki Akdeniz&#8217;in 15 kilometre a\u00e7\u0131klar\u0131ndaki Gruissan alan\u0131nda, 24 MW&#8217;l\u0131k ikincisi de Brittany&#8217;de bulunan Groix alan\u0131nda bulunmaktad\u0131r. Her bir sahada 6 MW&#8217;l\u0131k d\u00f6rt r\u00fczgar t\u00fcrbini kurulumu yap\u0131lacak.<\/p>\n<p>Fransa Enerji Bakan\u0131 S\u00e9gol\u00e8ne Royal, iki projenin de Fransa&#8217;da t\u00fcrlerinin ilk \u00f6rnekleri oldu\u011funu belirterek bulunduklar\u0131 sahaya end\u00fcstriyel katk\u0131 sa\u011flayaca\u011f\u0131n\u0131\u00a0ifade etti.<\/p>\n<p>Di\u011fer kalan alt\u0131 y\u00fczer r\u00fczgar santralleri alanlar\u0131 i\u00e7in ise Eyl\u00fcl ay\u0131nda ihale edilerek ruhsatland\u0131r\u0131l\u0131p\u00a0toplamda sekiz saha i\u00e7in be\u015f \u015firket ba\u015fvurusu yap\u0131lacak.<\/p>\n<p>Engie, EDP Renewables, Caisse des D\u00e9p\u00f4ts ve Eiffage \u015firketleri ise Nisan ay\u0131nda 36 MW&#8217;a kadar pilot y\u00fczer r\u00fczgar santrali kurulumu\u00a0i\u00e7in ba\u015fvurular\u0131n\u0131 ger\u00e7ekle\u015ftirdiler.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Fransa y\u00fczer r\u00fczgar santrallerini geli\u015ftirme hedefi ile a\u00e7\u0131lan\u00a0ihalelerde iki y\u00fczer santral projesi i\u00e7inde\u00a0ruhsat ald\u0131. Fransa \u00c7evre ve Enerji Y\u00f6netimi Ajans\u0131 (ADEME) taraf\u0131ndan ge\u00e7ti\u011fimiz [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":46943,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[5158,63,67,1009,2698,165,1346,2054,5839,69,16,23318,22615,4784,20029,30878],"views":970,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/55945"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=55945"}],"version-history":[{"count":4,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/55945\/revisions"}],"predecessor-version":[{"id":55949,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/55945\/revisions\/55949"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/46943"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=55945"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=55945"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=55945"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}