{"id":55919,"date":"2016-07-30T15:29:58","date_gmt":"2016-07-30T12:29:58","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=55919"},"modified":"2016-07-30T15:29:58","modified_gmt":"2016-07-30T12:29:58","slug":"filistin-yonetimi-bati-seriada-ilk-kez-gunes-enerjisi-santrali-lisansi-aldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/filistin-yonetimi-bati-seriada-ilk-kez-gunes-enerjisi-santrali-lisansi-aldi\/","title":{"rendered":"(Turkish) Filistin Y\u00f6netimi Bat\u0131 \u015eeria\u2019da \u0130lk Kez G\u00fcne\u015f Enerjisi Santrali Lisans\u0131 Ald\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/55919\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #666666;\"><span style=\"font-weight: bold; color: #222222;\">Filistin Y\u00f6netimi Enerji Bakanl\u0131\u011f\u0131 Bat\u0131 \u015eeria\u2019da, g\u00fcne\u015f enerjisi santrali kurmak i\u00e7in ilk lisans\u0131n\u0131 ald\u0131.<\/span><\/p>\n<p style=\"color: #666666;\">D\u00fcnyada\u00a0<span style=\"font-weight: bold; color: #222222;\">g\u00fcne\u015f enerjisi\u00a0<\/span>\u00fcretimi artarken, \u00f6zellikle siyasal ve sosyal a\u00e7\u0131dan s\u0131k\u0131nt\u0131l\u0131 say\u0131lacak b\u00f6lge ve \u00fclkelerin de\u00a0<span style=\"font-weight: bold; color: #222222;\">g\u00fcne\u015f enerjisi\u00a0<\/span>\u00fcretimine y\u00f6neldikleri g\u00f6r\u00fclmektedir.<\/p>\n<p style=\"color: #666666;\">T\u00fcrkiye \u0130srail ili\u015fkilerinin<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/turkiye-gunes-enerjisinde-bolgesel-uretim-ussu-olabilir.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-38850\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/turkiye-gunes-enerjisinde-bolgesel-uretim-ussu-olabilir-300x171.jpg\" alt=\"turkiye-gunes-enerjisinde-bolgesel-uretim-ussu-olabilir\" width=\"300\" height=\"171\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/turkiye-gunes-enerjisinde-bolgesel-uretim-ussu-olabilir-300x171.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/turkiye-gunes-enerjisinde-bolgesel-uretim-ussu-olabilir-500x286.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/turkiye-gunes-enerjisinde-bolgesel-uretim-ussu-olabilir-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/turkiye-gunes-enerjisinde-bolgesel-uretim-ussu-olabilir.jpg 870w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a> d\u00fczelmeye ba\u015flamas\u0131yla birlikte, bu b\u00f6lgeye\u00a0<span style=\"font-weight: bold; color: #222222;\">g\u00fcne\u015f enerjisi\u00a0<\/span>yat\u0131r\u0131mlar\u0131n\u0131n yap\u0131lmas\u0131 y\u00f6n\u00fcnde \u00e7al\u0131\u015fmalar\u0131n ba\u015flamas\u0131 da bu tezi g\u00fc\u00e7lendirmektedir.<\/p>\n<p style=\"color: #666666;\">Bu do\u011frultuda, Filistin Enerjisi Kurumu, \u015fu anda Bat\u0131 \u015eeria ve Gazze \u015eeridi\u2019nde hemen hemen t\u00fcm g\u00fc\u00e7 kaynaklar\u0131na sahip olan \u0130srail elektrik \u015febekesine ba\u011f\u0131ml\u0131l\u0131\u011f\u0131 azaltmak i\u00e7in, her biri 10 megawatt b\u00fcy\u00fckl\u00fckte <strong>10\u00a0<\/strong><span style=\"font-weight: bold; color: #222222;\">g\u00fcne\u015f enerjisi santrali<\/span>\u00a0in\u015fas\u0131 i\u00e7in ihale planlad\u0131\u011f\u0131n\u0131 May\u0131s ay\u0131nda\u00a0belirtmi\u015fti.<\/p>\n<p style=\"color: #666666;\">Filistin Y\u00f6netimi Enerji Bakanl\u0131\u011f\u0131 Bat\u0131 \u015eeria\u2019da,\u00a0<span style=\"font-weight: bold; color: #222222;\">g\u00fcne\u015f enerjisi santrali<\/span>\u00a0kurmak i\u00e7in ilk lisans\u0131n\u0131 da ald\u0131.<\/p>\n<p style=\"color: #666666;\">Bloomberg\u2019e g\u00f6re, proje Amsterdam merkezli Gigawatt Global Cooperatief UA ve Filistin \u015firketi olan Raf Tech taraf\u0131ndan ortakla\u015fa y\u00fcr\u00fct\u00fclecek ve\u00a0Hebron(El Halil) kenti yak\u0131nlar\u0131nda bir y\u0131l i\u00e7inde tamamlanmas\u0131 beklenen 10 milyon dolarl\u0131k\u00a0<span style=\"font-weight: bold; color: #222222;\">g\u00fcne\u015f enerjisi santralinin de<\/span>\u00a05.7 megavat kurulu g\u00fcc\u00fc olmas\u0131 planlanmaktad\u0131r.<\/p>\n<p style=\"color: #666666;\">Filistin\u2019de ekonomik kalk\u0131nmay\u0131 te\u015fvik i\u00e7in \u00e7al\u0131\u015fan uluslararas\u0131 bir \u00f6rg\u00fcte g\u00f6re, y\u0131l sonuna kadar iki proje daha ihaleye \u00e7\u0131kacak.<\/p>\n<p style=\"color: #666666;\">Kaynak: <a href=\"http:\/\/www.ekonomi.gov.tr\/portal\/faces\/blog\/newsDetail;jsessionid=3TM7wMDmA89IlIBvxPbtdwrTO6NwrC_ndsScgQSBTAN7divvz1f-!-86373947?news_id=EK-228156&amp;_afrLoop=822016915036664&amp;_afrWindowMode=0&amp;_afrWindowId=null#!%40%40%3F_afrWindowId%3Dnull%26_afrLoop%3D822016915036664%26news_id%3DEK-228156%26_afrWindowMode%3D0%26_adf.ctrl-state%3D1a0rfx15yh_4\" target=\"_blank\" rel=\"nofollow\">Ekonomi.gov.tr.<\/a><\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Filistin Y\u00f6netimi Enerji Bakanl\u0131\u011f\u0131 Bat\u0131 \u015eeria\u2019da, g\u00fcne\u015f enerjisi santrali kurmak i\u00e7in ilk lisans\u0131n\u0131 ald\u0131. D\u00fcnyada\u00a0g\u00fcne\u015f enerjisi\u00a0\u00fcretimi artarken, \u00f6zellikle siyasal ve sosyal a\u00e7\u0131dan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":38858,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[21637,63,67,1009,2698,165,11862,2326,6129,227,13,2569,30867,23133,22975,30866,4269],"views":906,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/55919"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=55919"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/55919\/revisions"}],"predecessor-version":[{"id":55920,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/55919\/revisions\/55920"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/38858"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=55919"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=55919"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=55919"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}