{"id":55855,"date":"2016-07-29T12:10:19","date_gmt":"2016-07-29T09:10:19","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=55855"},"modified":"2016-07-29T12:12:22","modified_gmt":"2016-07-29T09:12:22","slug":"mersin-kadincik-hesin-devir-surecinde-sona-gelindi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/mersin-kadincik-hesin-devir-surecinde-sona-gelindi\/","title":{"rendered":"(Turkish) Mersin Kad\u0131nc\u0131k HES\u2019in Devir S\u00fcrecinde Sona Gelindi&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/55855\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\"><strong>IC \u0130\u00c7TA\u015e Enerji, Mersin\u2019de bulunan Kad\u0131nc\u0131k 1 ve 2 hidroelektrik santrallerinde (HES) devir s\u00fcre\u00e7lerinin tamamlad\u0131\u011f\u0131n\u0131\u00a0a\u00e7\u0131klad\u0131.<\/strong><span id=\"more-82608\"><\/span><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">Yaz\u0131l\u0131 a\u00e7\u0131klamada, Elektrik \u00dcretim A\u015e\u2019ye (E\u00dcA\u015e) ait 126 megavatl\u0131k Kad\u0131nc\u0131k 1 ve 2 HES\u2019lerinin \u00f6zelle<img loading=\"lazy\" class=\"alignright size-medium wp-image-55856\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/07\/mersin-kadincik-hesin-devir-sureci-tamamlandi-300x200.jpg\" alt=\"mersin-kadincik-hesin-devir-sureci-tamamlandi\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/07\/mersin-kadincik-hesin-devir-sureci-tamamlandi-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/07\/mersin-kadincik-hesin-devir-sureci-tamamlandi-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/07\/mersin-kadincik-hesin-devir-sureci-tamamlandi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/07\/mersin-kadincik-hesin-devir-sureci-tamamlandi.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>\u015ftirme kapsam\u0131ndaki devir s\u00fcrecinin tamamlad\u0131\u011f\u0131\u00a0belirtildi.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">\u015eirketin toplam kurulu g\u00fcc\u00fcn\u00fcn bin 450 megavat oldu\u011fu belirtilen a\u00e7\u0131klamada, HES\u2019e dayal\u0131 kurulu g\u00fc\u00e7 ise bu devirle 400 megavata \u00e7\u0131kt\u0131.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">IC \u0130\u00c7TA\u015e Enerji Y\u00f6netim Kurulu Ba\u015fkan\u0131 Serhat \u00c7e\u00e7en ise yerli ve yenilenebilir kaynaklara dayal\u0131 b\u00fcy\u00fcme stratejilerinin devam edece\u011fini vurgulad\u0131.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">\u00c7e\u00e7en, \u201cTamam\u0131 yerli ve yenilenebilir kaynaklara dayal\u0131 bin 450 megavatl\u0131k kurulu g\u00fcc\u00fcn\u00fcn yan\u0131 s\u0131ra\u00a0elektrik da\u011f\u0131t\u0131m\u0131 ve perakende sat\u0131\u015f\u0131 alan\u0131ndaki faaliyetleri ile \u015firketimiz \u00fclkemizin enerji arz\u0131n\u0131n g\u00fcvenli ve s\u00fcrd\u00fcr\u00fclebilir olarak temini a\u00e7\u0131s\u0131ndan \u00f6nemli bir rol \u00fcstlenmektedir.\u201d ifadelerinde bulundu.<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. IC \u0130\u00c7TA\u015e Enerji, Mersin\u2019de bulunan Kad\u0131nc\u0131k 1 ve 2 hidroelektrik santrallerinde (HES) devir s\u00fcre\u00e7lerinin tamamlad\u0131\u011f\u0131n\u0131\u00a0a\u00e7\u0131klad\u0131. Yaz\u0131l\u0131 a\u00e7\u0131klamada, Elektrik \u00dcretim A\u015e\u2019ye (E\u00dcA\u015e) ait [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":55856,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[30844,9118,63,67,1009,2698,165,1033,35370,1090,30845,28712,1301],"views":1418,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/55855"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=55855"}],"version-history":[{"count":4,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/55855\/revisions"}],"predecessor-version":[{"id":55860,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/55855\/revisions\/55860"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/55856"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=55855"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=55855"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=55855"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}