{"id":55763,"date":"2016-07-26T23:33:24","date_gmt":"2016-07-26T20:33:24","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=55763"},"modified":"2016-07-26T23:33:24","modified_gmt":"2016-07-26T20:33:24","slug":"zorlu-enerjinin-rotor-2-ruzgar-santraline-7-turbin-ilave-edildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/zorlu-enerjinin-rotor-2-ruzgar-santraline-7-turbin-ilave-edildi\/","title":{"rendered":"(Turkish) Zorlu Enerji\u2019nin Rotor-2 R\u00fczgar Santraline 7 T\u00fcrbin \u0130lave Edildi!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/55763\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\"><strong>Zorlu Enerji, Osmaniye\u2019deki Rotor-2 r\u00fczgar enerjisi santraline 7 t\u00fcrbin ilavesi yapt\u0131\u011f\u0131n<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/r\u00fczgar-santrali-2398733.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-31847\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/r\u00fczgar-santrali-2398733-300x168.jpg\" alt=\"r\u00fczgar-santrali-2398733\" width=\"300\" height=\"168\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/r\u00fczgar-santrali-2398733-300x168.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/r\u00fczgar-santrali-2398733-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/r\u00fczgar-santrali-2398733-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/r\u00fczgar-santrali-2398733.jpg 795w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\u0131\u00a0a\u00e7\u0131klad\u0131.<\/strong><span id=\"more-82536\"><\/span><\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">\u015eirketin Kamuyu Ayd\u0131nlatma Platformu\u2019nda (KAP) yer alan a\u00e7\u0131klamada, \u201c\u015eirketimizin y\u00fczde 100 ba\u011fl\u0131\u00a0ortakl\u0131\u011f\u0131 Zorlu R\u00fczgar Enerjisi Elektrik \u00dcretimi A\u015e taraf\u0131ndan Osmaniye\u2019de yap\u0131m\u0131 devam eden yakla\u015f\u0131k 73,3 megavat kurulu g\u00fcce sahip Rotor 2 projesi kapsam\u0131ndaki r\u00fczgar enerjisi santralinin toplamda 18,5 megavat kapasiteli 7 t\u00fcrbininin daha ge\u00e7ici kabulleri tamamlanarak 23.07.2016 tarihi itibar\u0131yla ticari elektrik \u00fcretimine ba\u015flanm\u0131\u015ft\u0131r.\u201d bilgisine yer verildi.<\/p>\n<p class=\"selectionShareable\" style=\"color: #0a0a0a;\">A\u00e7\u0131klama ile santralin geriye kalan 20 megavatl\u0131k kapasitesinin 2016 y\u0131l\u0131 sonuna kadar i\u015fletmeye al\u0131nmas\u0131n\u0131n hedeflendi\u011fi de\u00a0belirtildi.<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Zorlu Enerji, Osmaniye\u2019deki Rotor-2 r\u00fczgar enerjisi santraline 7 t\u00fcrbin ilavesi yapt\u0131\u011f\u0131n\u0131\u00a0a\u00e7\u0131klad\u0131. \u015eirketin Kamuyu Ayd\u0131nlatma Platformu\u2019nda (KAP) yer alan a\u00e7\u0131klamada, \u201c\u015eirketimizin y\u00fczde 100 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":35853,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[63,67,1009,2698,165,16538,5436,17096,474,30817,69,16,23318,22615,4784,344,30818],"views":875,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/55763"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=55763"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/55763\/revisions"}],"predecessor-version":[{"id":55764,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/55763\/revisions\/55764"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/35853"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=55763"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=55763"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=55763"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}